Loading...
Chaucer-LR 920823ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 //, (214) 620-8911 TesrED FoR: SIEPZELA INTEREST , INC . C/O USA ASSOCIATES, INC. DALLAS, TEXAS PROJECT TEST DATA: CHAUCER ESTATES COPPELL, TEXAS REPORT OF FIELD COMPACTION TESTS DATE: OUR REPORT NO. 08/23/92 92097-22 TEST NO. DATE [1.[v, tl[~TM soli to NUMB[[ o~rlwuw w01[TYII[ wwxlwuw Lw OIlY O[N[ITY ~C~ IN t•~we[ w01[TYA[ • Iw •~we[ ORY O[N[ITY t+tr ~[[ C[iNT COw-A CTION COMMtNT• 119 08/23 FG 3 13.7 109.5 15.6 108 98 1-A 120 08/23 FG-2 3 13.7 109.5 16.3 106 97 1-A 121 08/23 FG-.4 3 13.7 109.5 15.5 108 99 1-A 122 08/23 SG 3 13.7 109.5 15.3 109 99 2-A 123 08/23 FG-.5 3 13.7 109.5 16.7 106 97 1-A 124 08/23 FG 3 13.7 109.5 16.4 105 96 1-A 125 08/23 SG 3 13.7 109.5 15.3 105 96 2-A TEST LOCATION: 119 LOT FILL BLOCK C LOT 23 120 LOT FILL BLOCK C LOT 19 121 LOT FILL BLOCK C LOT 19 122 DICKENS DR. @ BLOCK C LOT 21 CENTER LINE 123 DICKENS DR. @ BLOCK C LOT 21 CENTER LINE 124 DICKENS DR. @ BLOCK C LOT 21 CENTER LINE 125 PARK VALLEY DR. @ BLOCK B LOT 1 CENTER LINE .-- 1. FILL A. TEST RESULTS COMPLY WITH SPECIFICATIONS R~es~ecMully Sub ' 2. NATURAL SUBGRADE B. COMPACTION GOES NOT COMPLY WITH SPECIFICATIONS -' 3. LIME STABILIZED C. MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS~L~A T C. 4. D. RETEST -- ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 //, (214) 620-8911 TESTED FOR: SIEPIELA INTEREST , INC C/O USA ASSOCIATES, INC. DAL~AS, TEXAS vRO,lecT: CHAUCER ESTATES COPPELL, TEXAS TEST DATA: REPORT OF FIELD COMPACTION TESTS GATE: OUR REPORT NO. 08/23/92 92097-22A TEST N O. DATE ~~iv• „t~TM ~o~~ io NYM~tR O-TIMUY wo~~ru~i MA7[IM UM LA 001/ OiN~ITY ~C~ IN ~LACt wo~sruws ~ IN -LACt oRr esNSiTr ~C/ ~~w e~Nr COM-ACTION COMMLNT• 126 08/23 FG-1 3 13.7 109.5 15.7 109 100 1-A 127 08/23 FG 3 13.7 109.5 15.8 109 100 1-A 128 08/23 FG 3 13.7 109.5 16.6 108 99 1-A 129 08/23 FG-1 .5 3 13.7 109.5 16.7 105 96 1-A 130 08/23 FG 3 13.7 109.5 15.4 107 98 1-A 131 08/23 SG 3 13.7 109.5 14.2 109 100 2-A 132 08/23 FG 3 13.7 109.5 13.7 109 100 1-A TEST LOCATION: 126 PARK VALLEY DR_ @ BLOCK B LOT 1 CENTER LINE 127 PARK VALLEY DR. @ BLOCK B LOT 1 CENTER LINE 128 LOT FILL BLOCK B LOT 1 129 LOT FILL BLOCK B LOT 3 130 LOT FILL BLOCK B LOT 3 131 LOT FILL BLOCK B LOT 20 132 LOT FILL BLOCK B LOT 20 ~" `---- 1. FILL A. TEST RESULTS COMPLY WITH SPECIFICATIONS R ctfully Su i 2. NATURAL SUBGRADE B. COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS l 3. LIME STABILIZED C. MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS , ~LPHA T 4• D. RETEST ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 ~~/, (214)620-8911 REPORT OF FIELD COMPACTION TESTS TESTED Foq: SIEPIELA INTEREST , INC . DATE: 08/23/92 C/O USA ASSOCIATES, INC. Dr,LLAS , TEXAS PgOJECT TEST DATA: CHAUCER ESTATES COPPELL, TEXAS OUR REPORT NO. 92097-22B TEST N0. DATE st.sv. [, t l'TN fort. tD NUMRtR o-TIMUM M Otf TURt MwxIMUM t.w DRY ORNf ITY RCR IN ewes MOIf TU RF: ti IN ewes ORY OSNfITY ~Cr ~tR CRNT COM-ACT/ON COMM[NT• 133 08/23 FG-1 3 13.7 109.5 15.9 105 96 1-A 134 OS/23 SG 3 13.7 109.5 15.7 105 96 2-A 135 08/23 FG 3 13.7 109.5 16.7 104 95 1-A 136 08/23 FG 3 13.7 109.5 15.8 107 98 1-A 137 08/23 FG-9.5 3 13.7 109.5 14.7 108 98 1-A 138 08/23 FG-7.9 3 13.7 109.5 14.8 108 99 1-A 139 08/23 FG-6.3 3 13.7 109.5 16.2 106 97 1-A TEST LOCATION: 133 LOT FILL BLOCK B LOT 21 134 LOT FILL BLOCK A LOT 1 135 LOT FILL BLOCK A LOT 1 136 LOT FILL BLOCK A LOT 2 137 LOT FILL BLOCK C LOT 1 138 LOT FILL BLOCK C LOT 1 139 LOT FILL BLOCK C LOT 1 i 1. FILL A. TEST RESULTS COMPLY WITH SPECIFICATIONS R ctlully Sub - 2. NATURAL SUBGRADE B. COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS % .` `~ 3. LIME STABILIZED C. MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS ~A HA T I 4• D. RETEST _ ~ , ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 //, (214) 620-8911 REPORT OF FIELD COMPACTION TESTS TESTED FoR: SIEPIELA INTEREST , INC . oATe: 08/23/92 C/O USA ASSOCIATES, INC. DALLAS, TEXAS PROJECT: CHAUCER ESTATES COPPELL, TEXAS ouR REPOaT No. 92097-22C TEST DATA: TEST NQ DATE i~RV' bt~TN soli to NYwOtR o-Tlwuw wOI~TYR^ wAxlwuw t• PRY OSN~ITY ~0• IN •~weR wO1~TYRR ti IN -~we~ ORY OtN/ITY ~C/ rRR CtNT COM-ACTION COMMtNT~ 140 08/23 SG 3 13.7 109.5 15.7 106 96 2-A 141 08/23 FG-1 .5 3 13.7 109.5 15.8 106 97 1-A 142 08/23 FG 3 13.7 109.5 16.2 107 97 1-A 143 08/23 SG 3 13.7 109.5 16.4 107 98 2-A 144 08/23 FG-1 3 13.7 109.5 14.3 110 100 1-A TEST LOCATION: NOTE = BLOCK C LOT 3 HAD FILL IN BACK YARD ONLY 140 LOT FILL BLOCK C LOT 2 141 LOT FILL BLOCK C LOT 3 142 LGT FILL BLOCK C LOT 3 143 ALLEY BLOCK A ADJACENT TO S.E. CORNER LFT 10 144 ALLEY BLOCK A ADJACENT TO S_E. CORNER LFT 10 1. FILL A. TEST RESULTS COMPLY WITH SPECIFICATIONS RespecHully S mi d, 2. NATURAL SUBGRADE B. COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS _-.---- -- - - 3. LIME STABILIZED C. MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS j~ ALPHA _C~ 4• D. RETEST ~ /