Loading...
Victron-CS070302MRR- 01- 2007(THU) 15:07 KCS Associates, LLC P. 0011004 1900 westrldgey Drive Suite 205 Irving. Texas 7503a Phone. 972.823 9200 Fax. 972.823,9202 hnad(E'dxKCSAssociatcs.com FAX TRANSMITTAL PROJECT: 1 000 5. 4 -o–P Lo. nG TO: Ke n > FROM:m PROJECT NO: FAX: q1?- S o o - 7041 Telephone Number (972) 823 9200 DATE: .3/ Fax Number. (972) 823 9202 Total number of pages transmitted, including this page 3 REMARKS: Y'cvi e4j u 5 ouJ • I O le_ � e + c h eGK b 0 .–.L— OC7-- SPECIAL INSTRUCTIONS: Copy as Indicated below Copy as attached Return Originale to Sender Mall O►Ipinal to Address cc: Correspondence B�M��.:r•�6ugw�BFar Cmar LaftiAw MAR -01 - HUHHU) 15:07 ,8 -2006 'NE U2:28 I'll tech fort worth MX NU. 811 81U Utbr DEVELOPMENT FEE TABLE Project Lod Block A Kctran Stores Addition Dute 1211112006 —� TOTAL AMOUNT DUE FEES DUE PRIOR TO VTUN PLAT Water Impact Fee $11,844.00 BU /t -PING (100'% due at Issuance of Building Permit) DF�p�t?k,�vt Water Tap Inspection Pce 5150.00 (100% ducat Issuance of Water Motor) :�,— wo Water Meter Fee (Domestic) $204.34 k (100% due at Issuance of Water Meter '� Wa= Meter Fee (Irrigation /Fireline) $2,586.79 1004,, due at L+suanee of Water Meter +t Water Meter Deposit (Domestic) $30,00 (100% due at Issuance of Water Meter) Irrigation /Fireline Motor Deposit 560.00 , tt (100% due at Issuance of Water Meter) � " Wastewater Impact Fee $4,797,00 guIL-D IN Co (1000 K due at lssumice of Building Permit) Wastewnter Tap inspection Fee 550.00 -Pug (100 due at Issuance of Building Permit) WO Utility hinal Inspection Fee 550.00 t � (100% ducat Issuance orBuiidui Permit) Park tee $0,00 so.00 (100%, duc enior to Filing Plat) Roadway Impact Fee $12,004.60 $12,004.60 () 00% duo rior to Piling Plat) 1 go /L> Street Light Pee In.`onTtatian not Available 100 %, due prior to Aec )tance of Project) Street Sign Fee formt►t'ion not Available 15ZFE94 (100% due prior to Acccp=cc of Project) 5 I&M PEf.M t 1 Construction lnspcction Fee lnforruation not Available G PL. • yy 100% due g6or to Start of Construction) I 4 14. /,3l�. TOTAL 531 ,776 .73 $l2 Op4.60 TOTAL AMOUNT DUE PRIOR TO FILING FINAL PLAT - M TA t= COEC X 2)0 E To raw DING pF..Pi4!? -i M ��J f Ta7) L C*f - gr—r ptlr TV >v� Fl�&Ic WOWS Sib s Co�p��L �fl CoQpELL IBC �501°i P 0021004 r. uel ub -1C IC :ks rG G l 4-18,411.71 T H C- G I t• • O r �OF_ FELL *N 1 t A s S INSPECTION FEE CALCULATION SHEET PROJECT NAME DATE As per the City of Coppell Subdivision Regulations, the Developer shall pay 4% of the cost of the items to be permitted and inspected try the Engineering Department and dedicated to the City. The Developer shall pay 2% of the items to be inspected by thr- Engineering DepartmeM but Da dedicated to the City such as parking, lots, private utilities, private_ drainage systems and so for& baspedion fees are due on or before the date of the Pre- construction Meeting. 3 O Rl O Q'. O n. Cf c rrLn No - C n a e-- �[ In order to verify the inspection fee due, please provide a copy of the development costract(s) and this spreadsheet with completed rideit doss to the Engineering Dept. Tie contrat:t(s) should indicate the cost to ceutruct the fotlowmg improvements: f ' 1 1 C-structiaeDecdapmeol Permli GRAND TOTAL 4/ 3 ' 4 y Page 3 i a a 0 z C Ct c es o 0 0 0 b PUBLIC (MPROVEMEM X4 %= PRIVATE U"ROtrEMFM5 X 2% CONTRACT AMOUNT CONTRACT AMOUNT PAVING � , oo v 3 3 t• 4 RATER - - - _ — rej lv zi D 13 _ 2• $ 0 SA1d17ARY SE[VER�,s o b _ D• o 0 STORIA SEWER ALLEYS S DEWALKS O'i"HER TOTAL. GRAND TOTAL 4/ 3 ' 4 y Page 3 i a a 0 z C Ct c es o 0 0 0 b