Loading...
Vistas of C P2-LR 971212•12/12/97 11:20 $972 620 7328 FUGRO(SW) DALLAS 16 002/003 uno w o OW FUGRO - McCLELLAND (SOUTHWEST), INC. December 12, 1997 2880 Virgo Lane Dallas, Texas 75229 Phone: 972- 484 -8301 Fax :972- 620 -7328 Centex Homes 1660 S. Stemmons, Suite 150 Lewisville, Texas 75067 Attention: Mr. Robert Poole Dear Mr. Poole: Re: Project No. 0771 -2221 pH Lime Series Test Results Vistas of Coppell, 1 B & 2C Coppell, Texas In accordance with your request, we obtained six representative e samples o f he material 1997 expos at the subgrade level at the referenced project Atterberg Limits tests and an Eades and Grim Lime Series test were performed on the representative soil samples. The results of the Atterberg Limits and lime Series tests are presented below: itrit" Limit' {ndex Dark silty clay ` 49 , 17 1 32 Medium brown silty clay 1 54 I 19 1 35 Grayish brown silty clay 1 40 1 18 I 22 Yellowish brown silty 37 16 2 clay Light brown silty clay 50 20 30 Medium brown sandy 27 13 1 14 clay A member of the Fugro group of companies with offices throughout the world. Sample L�Lat�on 1 Forest Hill, station 4 +00 2 Claremont Court, cul -de -sac area 3 Waterview Drive, station 2 +50 4 Waterview Drive, station 7 +50 5 Rockcrest Drive, station 4 +35 6 Street west of Cresthaven Drive, station 4 +5 itrit" Limit' {ndex Dark silty clay ` 49 , 17 1 32 Medium brown silty clay 1 54 I 19 1 35 Grayish brown silty clay 1 40 1 18 I 22 Yellowish brown silty 37 16 2 clay Light brown silty clay 50 20 30 Medium brown sandy 27 13 1 14 clay A member of the Fugro group of companies with offices throughout the world. 12/12/97 11:21 $972 620 7328 FUGRO(SW) DALLAS 0003/003 Dun Centex Homes Project No. 0771 -2221 December 12, 1997 Page 2 An Eades and Grim pH and a Lime Series test were performed on sample #2. The results are as follows: Based on the results of the tests, we recommend that the concrete street subgrade be stabilized with the addition of 6 percent hydrated lime (28 pounds per square yard for a six -inch stabilized layer). The lime and the stabilization and compaction of the subgrade should be performed in accordance with the applicable City specifications. We trust the information provided herein is sufficient for your present use. Please contact us if you need any additional information or if we can be of further service. Respectively submitted, FUGRO- McCLELLAND (SOUTHWEST), INC. SMH /br Distribution: Saad M. Hineidi, P.E. Vice President'`°,; Centex Homes - Robert Poole City of Coppell - Garreth Campbell Glenn Thurman Inc. ,ceded RW 0 8.00 3 11.80 5 12.20 7 12.34 9 12.34 Based on the results of the tests, we recommend that the concrete street subgrade be stabilized with the addition of 6 percent hydrated lime (28 pounds per square yard for a six -inch stabilized layer). The lime and the stabilization and compaction of the subgrade should be performed in accordance with the applicable City specifications. We trust the information provided herein is sufficient for your present use. Please contact us if you need any additional information or if we can be of further service. Respectively submitted, FUGRO- McCLELLAND (SOUTHWEST), INC. SMH /br Distribution: Saad M. Hineidi, P.E. Vice President'`°,; Centex Homes - Robert Poole City of Coppell - Garreth Campbell Glenn Thurman Inc.