Vistas of C P2-LR 980408FUGRO SOUTH, INC.
fift
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484 -8301; Fax (972) 620 -7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Centex Homes Report Date: April 8, 1998
PROJECT: Vistas of Coppell, Phase 1B &2C Coppell, Texas Project No.: 0771 -2221
SAMPLE DATE: March f, 1998
CONTRACTOR: Glenn Thurman, Inc.
TICKET NO.: CONCRETE SUPPLIER: On Site
AMBIENT TEMP. ( °F): 45 PLANT/TRUCK: On Site /70 CY
CONCRETE TEMP. ( °F): 53 MIX ID NUMBER:
TIME BATCHED: 12:15 AIR ( %) ( ASTM C -231) 5.5
TIME SAMPLED: 12:45 WATER ADDED (gal): 0
WEATHER CONDITION: Overcast SLUMP (inches) (ASTM C -143) 53/4
LOCATION OF PLACEMENT: Alley C, pavement on grade, sampled at comer eyebrow area
CONCRETE CYLINDERCOMPRESSWE'STRENGTH TESTS.
Standard S" x 12 28.27 square' inches
CYLINDER
NUMBER
AGE
(days)
DATE
TESTED
TOTAL LOAD
(pounds)
COMPRESSIVE
STRENGTH
(Psi)
REQUIRED COMPRESSIVE
STRENGTH
(psi)
VCC 97A
7
03/13/98
97000
3432
3000/28 days
VCC 98A
28
04/03198
110300
3901
VCC 99A
28
04/03/98
112000
3962
VCC 100A
Hold
Specifications: Making & ASTM C -31 Testing Methods: ASTM C -143, ASTM C-39
Curing:
REMARKS:
Technician: William Freeze FUGRO- McCLELLAND (SOUTHWEST), INC.
Checked By:
SMH /rm
Distribution: Centex Homes - Robert Poole
Glenn Thurman Inc.
City of Coppell - Garreth Campbell ✓
FUGRO SOUTH, INC.
�PaRO
2880 Virgo Lane: Dallas, Texas 75229
Ph (972) 4848301; Fax (972) 620 -7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Centex Homes Report Date: April 8, 1998
PROJECT Vistas of Coppell, Phase 113 &2C Coppell, Texas Project No.: 0771 -2221
SAMPLE DATE: March 6, 1998
CONTRACTOR:
Glenn Thurman, Inc.
AGE
(days)
DATE
TESTED
TICKET NO.:
COMPRESSIVE
STRENGTH
(Psi)
CONCRETE SUPPLIER:
On Site
AMBIENT TEMP. (°F):
42
PLANT/TRUCK:
On Site/70CY
CONCRETE TEMP. ( °F):
54
MIX ID NUMBER:
04/03/98
TIME BATCHED:
8:32
AIR ( % ) (ASTM C -231)
5.5
TIME SAMPLED:
8:55
WATER ADDED (gal):
0
WEATHER CONDITION:
Overcast
SLUMP (inches) (ASTM C -143)
6
LOCATION OF PLACEMENT:
Pavement on grade - Forest Hill Drive, sampled at station 8 +00
CONCRETE CYLINDEKCO.MPRESSIVE:STRENGTH TESTS
Standard V 12'.' 28.27 square inches
CYLINDER
NUMBER
AGE
(days)
DATE
TESTED
TOTAL LOAD
(pounds)
COMPRESSIVE
STRENGTH
(Psi)
REQUIRED COMPRESSIVE
STRENGTH
(Psi)
VCC 97
7
03/13/98
95000
3361
3000/28 days
VCC 98
28
04/03/98
126300
4467
VCC 99
28
04/03/98
128200
4535
VCC 100
Hold
Specifications: Making & ASTM C -31 Testing Methods: ASTM C -143, ASTM C -39
Curing:
REMARKS:
Technician: Michael Flute FUGRO- McCLELLAND (SOUTHWEST), INC.
Checked By:
SMH /rm
Distribution: Centex Homes - Robert Poole
Glenn Thurman Inc.
City of Coppell - Garreth Campbell