Loading...
Vistas of C P2-LR 980408FUGRO SOUTH, INC. fift 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Centex Homes Report Date: April 8, 1998 PROJECT: Vistas of Coppell, Phase 1B &2C Coppell, Texas Project No.: 0771 -2221 SAMPLE DATE: March f, 1998 CONTRACTOR: Glenn Thurman, Inc. TICKET NO.: CONCRETE SUPPLIER: On Site AMBIENT TEMP. ( °F): 45 PLANT/TRUCK: On Site /70 CY CONCRETE TEMP. ( °F): 53 MIX ID NUMBER: TIME BATCHED: 12:15 AIR ( %) ( ASTM C -231) 5.5 TIME SAMPLED: 12:45 WATER ADDED (gal): 0 WEATHER CONDITION: Overcast SLUMP (inches) (ASTM C -143) 53/4 LOCATION OF PLACEMENT: Alley C, pavement on grade, sampled at comer eyebrow area CONCRETE CYLINDERCOMPRESSWE'STRENGTH TESTS. Standard S" x 12 28.27 square' inches CYLINDER NUMBER AGE (days) DATE TESTED TOTAL LOAD (pounds) COMPRESSIVE STRENGTH (Psi) REQUIRED COMPRESSIVE STRENGTH (psi) VCC 97A 7 03/13/98 97000 3432 3000/28 days VCC 98A 28 04/03198 110300 3901 VCC 99A 28 04/03/98 112000 3962 VCC 100A Hold Specifications: Making & ASTM C -31 Testing Methods: ASTM C -143, ASTM C-39 Curing: REMARKS: Technician: William Freeze FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By: SMH /rm Distribution: Centex Homes - Robert Poole Glenn Thurman Inc. City of Coppell - Garreth Campbell ✓ FUGRO SOUTH, INC. �PaRO 2880 Virgo Lane: Dallas, Texas 75229 Ph (972) 4848301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Centex Homes Report Date: April 8, 1998 PROJECT Vistas of Coppell, Phase 113 &2C Coppell, Texas Project No.: 0771 -2221 SAMPLE DATE: March 6, 1998 CONTRACTOR: Glenn Thurman, Inc. AGE (days) DATE TESTED TICKET NO.: COMPRESSIVE STRENGTH (Psi) CONCRETE SUPPLIER: On Site AMBIENT TEMP. (°F): 42 PLANT/TRUCK: On Site/70CY CONCRETE TEMP. ( °F): 54 MIX ID NUMBER: 04/03/98 TIME BATCHED: 8:32 AIR ( % ) (ASTM C -231) 5.5 TIME SAMPLED: 8:55 WATER ADDED (gal): 0 WEATHER CONDITION: Overcast SLUMP (inches) (ASTM C -143) 6 LOCATION OF PLACEMENT: Pavement on grade - Forest Hill Drive, sampled at station 8 +00 CONCRETE CYLINDEKCO.MPRESSIVE:STRENGTH TESTS Standard V 12'.' 28.27 square inches CYLINDER NUMBER AGE (days) DATE TESTED TOTAL LOAD (pounds) COMPRESSIVE STRENGTH (Psi) REQUIRED COMPRESSIVE STRENGTH (Psi) VCC 97 7 03/13/98 95000 3361 3000/28 days VCC 98 28 04/03/98 126300 4467 VCC 99 28 04/03/98 128200 4535 VCC 100 Hold Specifications: Making & ASTM C -31 Testing Methods: ASTM C -143, ASTM C -39 Curing: REMARKS: Technician: Michael Flute FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By: SMH /rm Distribution: Centex Homes - Robert Poole Glenn Thurman Inc. City of Coppell - Garreth Campbell