Vistas of C P2-LR 980331FUGRO SOUTH, INC.
a m
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484 -8301; Fax (972) 620 -7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Centex Homes
PROJECT: Vistas of Coppell, Phase 1B &2C Coppell, Texas
Report Date: March 31, 1998
Project No.: 0771 -2221
SAMPLE DAT `Feb ruary'28, 198
CONTRACTOR:
TICKET NO.:
AMBIENT TEMP. (°F):
CONCRETE TEMP. ( °F):
TIME BATCHED:
TIME SAMPLED:
WEATHER CONDITION:
LOCATION OF PLACEMENT:
Glenn Thurman, Inc.
CONCRETE SUPPLIER: On Site
58 PLANTITRUCK: On Site
63 MIX ID NUMBER:
8:15 AIR ( %) ( ASTM C -231)
8:20 WATER ADDED (gal): 0
Cloudy SLUMP (inches) (ASTM C -143) 2.5
Paving: Valley Way, station 18 +75
CONCRETE'GYLINDER COMPRESSIVE STRENGTH TESTS
Standard V' x 12' 28.27 squarer inches
CYLINDER
NUMBER
AGE
(days)
DATE
TESTED
TOTAL LOAD
(pounds)
COMPRESSIVE
STRENGTH
(psi)
REQUIRED COMPRESSIVE
STRENGTH
(psi)
VCC 29
7
03/07/98
106000
3750
3000/28 days
VCC 30
28
03/28/98
141000
4988
VCC 31
28
03/28/98
137000
4847
VCC 32
1 Hold
Specifications: Making & ASTM C -31 Testing Methods: ASTM C -143, ASTM C -39
Curing:
REMARKS:
Technician: Scott Rogers
FUGRO- McCLELLAND (SOUTHWEST), INC.
Checked By: - -
SMH /rm
Distribution: Centex Homes - Robert Poole
Glenn Thurman Inc.
City of Coppell - Garreth Campbell
FUGRO SOUTH, INC.
— fu'[>iR0
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484 -8301; Fax (972) 620 -7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Centex Homes
PROJECT Vistas of Coppell, Phase 1B & 2C Coppell, Texas
CONTRACTOR:
TICKET NO.:
AMBIENT TEMP. (°F):
CONCRETE TEMP. (°F):
TIME BATCHED:
TIME SAMPLED:
WEATHER CONDITION:
LOCATION OF PLACEMENT:
REMARKS:
Technician: William Freeze
Report Date March 31, 1998
Project No.: 0771 -2221
1998
twig -. E..a-:.,rr�•�. - ..
Glenn Thurman, Inc.
CONCRETE SUPPLIER: On Site
56
PLANT/TRUCK:
60
MIX ID NUMBER:
10:40 am
AIR ( % ) (ASTM C -231)
10:53 am
WATER ADDED (gal): 0
Cold /windy
SLUMP (inches) (ASTM c -143) 2.25
Paving: Water View Drive, station 5 +50
FUGRO- McCLELLAND (SOUTHWEST), INC.
Checked By
SMH /br
Distribution: Centex Homes - Robert Poole
Glenn Thurman Inc.
City of Coppell - Garreth Campbell
FUGRO SOUTH, INC.
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484 -8301; Fax (972) 620 -7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Centex Homes Report Date: March 31, 1998
PROJECT: Vistas of Coppell, Phase 1B & 2C Coppell, Texas Project No.: 0771 -2221
SAMPLE DATE: February'28, 1998
CONTRACTOR: Glenn Thurman, Inc.
TICKET NO.: CONCRETE SUPPLIER: On Site
AMBIENT TEMP. ( °F): 58 PLANT/TRUCK:
CONCRETE TEMP. (°F): 61 MIX ID NUMBER:
TIME BATCHED: 12:30 pm AIR ( %) ( ASTM C -231)
TIME SAMPLED: 12:45 pm WATER ADDED (gal): 0
WEATHER CONDITION: Cool /windy SLUMP (inches) (ASTM C -143) 2
LOCATION OF PLACEMENT: Paving: Water View Drive, station 3 +00
CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS
Standard V x 12 28.27 square inches
CYLINDER
NUMBER
AGE
(days)
DATE
TESTED
TOTAL LOAD
(pounds)
COMPRESSIVE
STRENGTH
(Psi)
REQUIRED COMPRESSIVE
STRENGTH
(Psi)
VCC 41
7
03/07/98
125000
4422
3600/28 days
VCC 42
28
03/28198
157000
5554
VCC 43
28
03/28/98
160000
5660
VCC 44
Hold
Specifications: Making & ASTM C -31 Testing Methods: ASTM C -143, ASTM C-39
Curing:
REMARKS:
Technician: William Freeze
FUGRO- McCLELLAND (SOUTHWEST), INC.
Checked By: - --
SMH /rm
Distribution: Centex Homes - Robert Poole
Glenn Thurman Inc.
City of Coppell - Garreth Campbell
FUGRO SOUTH, INC.
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 4848301; Fax (972) 620 -7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Centex Homes Report Date: March 31, 1998
PROJECT: Vistas of Coppell, Phase 1B & 2C Coppell, Texas Project No.: 0771 -2221
SAMPLE DATE: March 3, 1998
CONTRACTOR:
TICKET NO.:
AMBIENT TEMP. ( °F):
CONCRETE TEMP. ( °F):
TIME BATCHED:
TIME SAMPLED:
WEATHER CONDITION:
LOCATION OF PLACEMENT:
Glenn Thurman, Inc.
CONCRETE SUPPLIER: On Site
45 PLANT/TRUCK:
58 MIX ID NUMBER:
8:45 am AIR ( %) ( ASTM C -231)
9:10 am WATER ADDED (gal): 0
Cool slightly mild SLUMP (inches) (ASTM C -143) 1.5
Paving: Lyndsie Dr. station 7 +00
CONCRETE CYLINDER'' COMPRESSIVE STRENGTH TESTS
Standard W x X12", 28.27 square Inches
CYLINDER
NUMBER
AGE
(days)
DATE
TESTED
TOTAL LOAD
(pounds)
COMPRESSIVE
STRENGTH
(psi)
REQUIRED COMPRESSIVE
STRENGTH
(psi)
VCC 73
7
03/10/98
115000
4068
3600/28 days
VCC 74
28
03/31/98
147000
5200
VCC 75
28
03/31/98
144000
5094
VCC 76
Hold
Specifications: Making & ASTM C -31 Testing Methods: ASTM C -143, ASTM C -39
Curing:
REMARKS: Unit Weight: 146 Ibs /cu. ft.
Technician: William Freeze
FUGRO- McCLELLAND (SOUTHWEST), INC.
Checked
SMH /rm
Distribution: Centex Homes - Robert Poole
Glenn Thurman Inc.
City of Coppell - Garreth Campbell
FUGRO SOUTH, INC.
r �
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484 -8301; Fax (972) 620 -7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Centex Homes Report Date: March 31, 1998
PROJECT Vistas of Coppell, Phase 1B & 2C Coppell, Texas Project No .: 0771 -2221
SAMPLE DATE: March !3, 1998
CONTRACTOR:
TICKET NO.:
AMBIENT TEMP. (°F):
CONCRETE TEMP. (°F):
TIME BATCHED:
TIME SAMPLED:
WEATHER CONDITION:
LOCATION OF PLACEMENT:
Glenn Thurman, Inc.
CONCRETE SUPPLIER: On Site
42 PLANT/TRUCK:
51 MIX ID NUMBER:
7:30 am AIR ( % ) (ASTM C -231)
7:55 am WATER ADDED (gal): 0
Cold SLUMP (inches) (ASTM C -143) 3
Paving: Lyndsie Drive, station 5 +50
CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS
Standard V' x: 12 28.27 square inches
CYLINDER
NUMBER
AGE
(days)
DATE
TESTED
TOTAL LOAD
(pounds)
COMPRESSIVE
STRENGTH
(psi)
REQUIRED COMPRESSIVE
STRENGTH
(Psi)
VCC 69
7
03/10/98
780000
2760
3600/28 days
VCC 70
28
03/31/98
110000
3892
VCC 71
28
03/31/98
105000
3715
VCC 72
Hold
Specifications: Making & ASTM C -31 Testing Methods: ASTM C -143, ASTM C -39
Curing:
REMARKS: Unit Weight: 142 Ibs /cu. ft.
Technician: William Freeze FUGRO- McCLELLAND (SOUTHWEST), INC.
Checked By:
SMH /rm
Distribution: Centex Homes - Robert Poole
choose contractor
City of Coppell - Garreth Campbell
FUGRO SOUTH, INC.
�faRO
■
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484 -8301; Fax (972) 620 -7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Centex Homes Report Date March 31, 1998
PROJECT Vistas of Coppell, Phase 1B &2C Coppell, Texas Project No .: 0771 -2221
SAMPLE 'DATE: March 2
CONTRACTOR:
GTI
AGE
(days)
DATE
TESTED
TICKET NO.:
COMPRESSIVE
STRENGTH
(psi)
CONCRETE SUPPLIER:
GTI
AMBIENT TEMP. ( °F):
58
PLANT/TRUCK:
3538
CONCRETE TEMP. ( °F):
54
MIX ID NUMBER:
03/30198
TIME BATCHED:
5:30 pm
AIR ( % ) (ASTM C -231)
5.5
TIME SAMPLED:
5:40 pm
WATER ADDED (gal):
0
WEATHER CONDITION:
Clear /cool
SLUMP (inches) (ASTM C -143)
21/4
LOCATION OF PLACEMENT:
Paving: Lyndsie Drive, station 4 +75
CONCRETE CYLINDER COMPRESSIVE' STRENGTH TESTS
Standard V1 x 12" 28.27 square inches
CYLINDER
NUMBER
AGE
(days)
DATE
TESTED
TOTAL LOAD
(pounds)
COMPRESSIVE
STRENGTH
(psi)
REQUIRED COMPRESSIVE
STRENGTH
(psi)
VCC 65
7
03/09/98
100000
3538
3000/28 days
VCC 66
28
03/30198
140000
4953
VCC 67
28
03/30/98
145000
5130
VCC 68
Hold
Specifications: Making & ASTM C -31 Testing Methods: ASTM C -143, ASTM C-39
Curing:
REMARKS: Unit Weight: 140.4 lbs. /cu. ft.
Technician: William E. Ruff
FUGRO- McCLELLAND (SOUTHWEST), INC.
Checked By:
SMH /rm
Distribution: Centex Homes - Robert Poole
Glenn Thurman Inc.
City of Coppell - Garreth Campbell
FUGRO SOUTH, INC.
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484 -8301; Fax (972) 620 -7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Centex Homes Report Date: March 31, 1998
PROJECT: Vistas of Coppell, Phase 1B &2C Coppell, Texas Project NO.: 0771 -2221
SAMPLE DATE: March 2, 1998
CONTRACTOR:
Glenn Thurman, Inc.
AGE
(days)
TICKET NO.:
TOTAL LOAD
(pounds)
CONCRETE SUPPLIER:
On Site
AMBIENT TEMP. (°F):
42
PLANT/TRUCK:
100000
CONCRETE TEMP. (°F):
58
MIX ID NUMBER:
28
TIME BATCHED:
8:50
AIR ( %) (ASTM C -231)
4.0
TIME SAMPLED:
9:00
WATER ADDED (gal):
0
WEATHER CONDITION:
Clear
SLUMP (inches) (ASTM C -143)
3
LOCATION OF PLACEMENT:
Paving:
Rock Crest Court, station 3 +50
CONCRETE CYLINDER COMPRESSIVE' STRENGTH TESTS
Standard V' x 12" 28.27 square inches
CYLINDER
NUMBER
AGE
(days)
DATE
TESTED
TOTAL LOAD
(pounds)
COMPRESSIVE
STRENGTH
(psi)
REQUIRED COMPRESSIVE
STRENGTH
(psi)
VCC 45
7
03/09198
100000
3538
3000/28 days
VCC 46
28
03/30198
137000
4847
VCC 47
28
03/30/98
133000
4705
VCC 48
Hold
Specifications: Making & ASTM C -31 Testing Methods: ASTM C -143, ASTM C -39
Curing:
REMARKS: Unit Weight: 146.5 lbs. /cu. ft.
Technician: Burl Cooper
FUGRO- McCLELLAND (SOUTHWEST), INC.
Checked By:
SMH /rm
Distribution: Centex Homes - Robert Poole
Glenn Thurman Inc.
City of Coppell - Garreth Campbell
FUGRO SOUTH, INC.
�GRO
■
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484 -8301; Fax (972) 620 -7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Centex Homes
PROJECT Vistas of Coppell, Phase 1B &2C Coppell, Texas
Report Date March 31, 1998
Project No.: 0771 -2221
SAMPLE DATE: March '2 1998
CONTRACTOR:
TICKET NO.:
AMBIENT TEMP. ( °F):
CONCRETE TEMP. (°F):
TIME BATCHED:
TIME SAMPLED:
WEATHER CONDITION:
LOCATION OF PLACEMENT:
Technician: William E. Ruff
Glenn Thurman, Inc.
CONCRETE SUPPLIER: GTI
60 PLANT/TRUCK:
60 MIX ID NUMBER:
4:00 pm AIR ( % (ASTM C -231) 5
4:15 pm WATER ADDED (gal): 0
Clear /mild SLUMP (inches) (ASTM c -143) 21/2
Paving: Lyndsie Drive, station 3 +50
FUGRO- McCLELLAND (SOUTHWEST), INC.
Checked By:
SMH /rm
Distribution: Centex Homes - Robert Poole
Glenn Thurman Inc.
City of Coppell - Garreth Campbell
REMARKS: Unit Weight: 115.2 lbs. /cu. ft.