Vistas of C P2-LR 980326FUGRO SOUTH, INC.
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484 -8301; Fax (972) 620 -7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Centex Homes Report Date: March 26, 1998
PROJECT: Vistas of Coppell, Phase 113 &2C Coppell, Texas Project No.: 0771 -2221
SAMPLE DATE: February 24, 1998
CONTRACTOR:
Glenn Thurman
AGE
(days)
TICKET NO.:
TOTAL LOAD
(pounds)
CONCRETE SUPPLIER:
On Site
AMBIENT TEMP. (°F):
50
PLANT/TRUCK:
On Site
CONCRETE TEMP. (°F):
58
MIX ID NUMBER:
28
TIME BATCHED:
8:25
AIR ( %) (ASTM C -231)
TIME SAMPLED:
8:35
WATER ADDED (gal):
0
WEATHER CONDITION:
Cloudy
SLUMP (inches) (ASTM c -143)
3
LOCATION OF PLACEMENT:
Paving:
200 feet east from Bella Vista on Clairmont Court
CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS
Standard V x 1€2", 28.27 square inches
CYLINDER
NUMBER
AGE
(days)
DATE
TESTED
TOTAL LOAD
(pounds)
COMPRESSIVE
STRENGTH
(psi)
REQUIRED COMPRESSIVE
STRENGTH
(psi)
VCC 5
7
03/03/98
87000
3078
3000/28 days
VCC 6
28
03/24/98
123000
4351
VCC 7
28
03/24/98
120000
4245
VCC 8
Hold
Specifications: Making & ASTM C -31 Testing Methods: ASTM C -143, ASTM C -39
Curing:
REMARKS:
Technician: Scott Rogers
FUGRO- McCLELLAND (SOUTHWEST), INC.
Checked By:
SMH /rm
Distribution: Centex Homes - Robert Poole
Glenn Thurman Inc.
City of Coppell - Garreth Campbell
FUGRO SOUTH, INC.
GRO
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 4848301; Fax (972) 620 -7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Centex Homes Report Date: March 26, 1998
PROJECT: Vistas of Coppell, Phase 1B &2C Coppell, Texas Project No.: 0771 -2221
SAMPLE DATE: February '24, 1998
CONTRACTOR: Glenn Thurman
TICKET NO.: CONCRETE SUPPLIER: On Site
AMBIENT TEMP. (°F): 67 PLANT/TRUCK: On Site
CONCRETE TEMP. (°F): 68 MIX ID NUMBER:
TIME BATCHED: 11:30 AIR ( %) ( ASTM C -231)
TIME SAMPLED: 11:40 WATER ADDED (gal): 0
WEATHER CONDITION: Clear SLUMP (inches) (ASTM C -143) 2.5
LOCATION OF PLACEMENT: Paving: 10 Feet east from western most point of circle at Willow Ridge Court
CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS
Standard B" x 12 ", 28.27 square inches
CYLINDER
NUMBER
AGE
(days)
DATE
TESTED
TOTAL LOAD
(pounds)
COMPRESSIVE
STRENGTH
(psi)
REQUIRED COMPRESSIVE
STRENGTH
(psi)
VCC 9
7
03/03/98
95000
3361
3000/28 days
VCC 10
28
03/24/98
120000
4245
VCC 11
28
03/24/98
117000
4139
VCC 12
Hold
Specifications: Making & ASTM C -31 Testing Methods: ASTM C -143, ASTM C -39
Curing:
REMARKS:
Technician: Scott Rogers
FUGRO- McCLELLAND (SOUTHWEST), INC.
Checked By: ----
SMH /rm
Distribution: Centex Homes - Robert Poole
Glenn Thurman Inc.
City of Coppell - Garreth Campbell
FUGRO SOUTH, INC.
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484 -8301; Fax (972) 620 -7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Centex Homes Report Date: March 26, 1998
PROJECT: Vistas of Coppell, Phase 1B &2C Coppell, Texas Project No.: 0771 -2221
SAMPLE DATE: 'February ! 24, 1998
CONTRACTOR:
TICKET NO.:
AMBIENT TEMP. ( °F):
CONCRETE TEMP. ( °F):
TIME BATCHED:
TIME SAMPLED:
WEATHER CONDITION:
LOCATION OF PLACEMENT:
Glenn Thurman
CONCRETE SUPPLIER: On Site
71 PLANT/TRUCK:
78 MIX ID NUMBER:
AIR ( %) ( ASTM C -231)
3:30 pm WATER ADDED (gal): 0
Clear SLUMP (inches) (ASTM C -143) 2.5
Paving: Forest Hill Drive, station 7 +50
CONCRETE ' CYLINDER 'COMPRESSIVE. STRENGTH TESTS
Standard V' x 12", 28.27 square inches
CYLINDER
NUMBER
AGE
(days)
DATE
TESTED
TOTAL LOAD
(pounds)
COMPRESSIVE
STRENGTH
(Psi)
REQUIRED COMPRESSIVE
STRENGTH
(Psi)
VCC 13
7
03/03/98
115000
4068
3000/28 days
VCC 14
28
03/24/98
135000
4776
VCC 15
28
03/24/98
138000
4882
VCC 16
Hold
L pecifications: Making & ASTM C -31 Testing Methods: ASTM C -143, ASTM C -39
Curing:
REMARKS:
Technician: Daniel Myers
FUGRO- McCLELLAND (SOUTHWEST), INC.
Checked By: ` -- —'
SMH /rm
Distribution: Centex Homes - Robert Poole
Glenn Thurman Inc.
City of Coppell - Garreth Campbell