Loading...
Vistas of C P2-LR 980321FUGRO SOUTH, INC. r � 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Centex Homes PROJECT Vistas of Coppell, Phase 1B & 2C Coppell, Texas Report Date March 21, 1998 Project No.: 0771 -2221 SAMPLE DATE: March 10, 1998 CONTRACTOR: TICKET NO.: AMBIENT TEMP. ( °F): CONCRETE TEMP. ( °F): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Glenn Thurman, Inc. CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 square inches CONCRETE SUPPLIER: AGE (days) 45 PLANT/TRUCK: On Site /50 CY 52 MIX ID NUMBER: 7 1:30 AIR ( % ) (ASTM C -231) 5.5 1:50 WATER ADDED (gal): 0 Sunny /clear SLUMP (inches) (ASTM C -143) 43/4 Right turn lane, entrance off Vista Ridge VCC 103 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 square inches CYLINDER NUMBER AGE (days) DATE TESTED TOTAL LOAD (pounds) COMPRESSIVE STRENGTH (psi) REQUIRED COMPRESSIVE STRENGTH (psi) VCC 101 7 03/17/98 85000 3006 3000/28 days VCC 102 28 04/07/98 VCC 103 28 04/08/98 VCC 104 Hold Specifications: Making & ASTM C -31 Testing Methods: ASTM C -143, ASTM C -39 Curing: REMARKS: Technician: Mark Strittmatter FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By: SMH /rm Distribution: Centex Homes - Robert Poole Glenn Thurman Inc. City of Coppell - Garreth Campbell