Loading...
Vistas of C P2-LR 980320coo FUGRO- McCLELLAND (SOUTHWEST), INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 FIELD DENSITY REPORT CLIENT: Centex Homes REPORT DATE: March 20,1998 PROJECT: Vistas of Coppell, Phase 1B & 2C Coppell, Texas PROJECT NO.: 0771 -2221 MOISTURE /DENSITY RELATIONS Material Proctor Results Maximum Dry Density (pcf) Optimum Moisture Number Description ( %) 1 Dark brown clayey sand (lime treated) 104.9 19.0 TEST RESULTS TEST PROCTOR LOCATION UNIT DRY WEIGHT NO. NO. 124 1 Right turn lane on 553, 35 feet west of 95.3 Lyndsie Drive, west curb lines, final 125 1 Right turn lane on 553, 110 feet west of 100.5 Lyndsie Drive, west curb lines, final 126 1 Alley G, Phase B, station 13 +00, final 99.8 Remarks: All densities meet project specifications unless otherwise noted. William Freeze Fugro - McClelland Technician MOISTURE PERCENT OF CONTENT PERCENT MAXIMUM DENSITY 19.6 95.3 19.1 95.8 19.1 95.1 FUGRO- McCLELLAND (SOUTHWEST), INC. Checked by: SMHImv Distribution: Centex Homes - Robert Poole Glenn Thurman Inc. City of Coppell - Garreth Campbell