Loading...
Vistas of C P2-LR 980318FUGRO SOUTH, INC. i n 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Centex Homes Report Date: March 18,1998 PROJECT Vistas of Coppell, Phase 16 &2C Coppell, Texas Project No .: 0771 -2221 SAMPLE DATE: Ma 5, 1998 CONTRACTOR: Glenn Thurman, Inc. AGE (days) DATE TESTED TICKET NO.: COMPRESSIVE STRENGTH (Psi) CONCRETE SUPPLIER: On Site AMBIENT TEMP. (°F): 68 PLANT/TRUCK: On Site /237 CONCRETE TEMP. ( °F): 72 MIX ID NUMBER: 04/02/98 TIME BATCHED: 1:37 AIR ( % ) (ASTM C -231) 5.5 TIME SAMPLED: 1:40 WATER ADDED (gal): 0 WEATHER CONDITION: Sunny SLUMP (inches) (ASTM C -143) 53/4 LOCATION OF PLACEMENT: Pavement on grade, Alley A, sampled at eyebrow of corner Specifications: Making & ASTM C -31 Testing Methods: ASTM C -143, ASTM C -39 Curing: CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 8" x '12", 28.27, square inches CYLINDER NUMBER AGE (days) DATE TESTED TOTAL LOAD (pounds) COMPRESSIVE STRENGTH (Psi) REQUIRED COMPRESSIVE STRENGTH (Psi) VCC 93 7 03/12/98 130000 4599 3000/28 days VCC 94 28 04/02/98 VCC 95 28 04102/98 VCC 96 Hold Specifications: Making & ASTM C -31 Testing Methods: ASTM C -143, ASTM C -39 Curing: REMARKS: Technician: Mike Flute FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By: s l � SMH /rm Distribution: Centex Homes - Robert Poole Glenn Thurman Inc. City of Coppell - Garreth Campbell FUGRO SOUTH, INC. r � 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 4848301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Centex Homes Report Date: March 18 1998 PROJECT Vistas of Coppell, Phase 1B & 2C Coppell, Texas Project No .: 0771 -2221 SAMPLE DATE: March 3,1998 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. ( °F): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Glenn Thurman, Inc. On Site On Site /60 C.Y. 5.5 0 53/4 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard S" x 12" 28.27 square inches CONCRETE SUPPLIER: 62 PLANT/TRUCK: 66 MIX ID NUMBER: 7:45 AIR ( % ) (ASTM C -231) 7:50 WATER ADDED (gal): Overcast SLUMP (inches) (ASTM c -143) Rock Crest Court, sampled at station 1 +00 On Site On Site /60 C.Y. 5.5 0 53/4 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard S" x 12" 28.27 square inches CYLINDER NUMBER AGE (days) DATE TESTED TOTAL LOAD (pounds) COMPRESSIVE STRENGTH (psi) REQUIRED COMPRESSIVE STRENGTH (psi) VCC 89 7 03/12/98 125000 4422 3000/28 days VCC 90 28 04/02/98 VCC 91 28 04/02/98 VCC 92 Hold Specifications: Making & ASTM C-31 Testing Methods: ASTM C -143, ASTM C -39 Curing: REMARKS: Unit Weight: 134.8 Ibs /cu. ft. Technician: Michael Flute FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By: SMH /rm Distribution: Centex Homes - Robert Poole Glenn Thurman Inc. City of Coppell - Garreth Campbell ORO FUGRO- McCLELLAND (SOUTHWEST), INC. 3- 715-It/It" 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 GENERAL REPORT CLIENT: Centex Homes PROJECT: Vistas of Coppell, Phase 1B & 2C Coppell, Texas REPORT DATE: March 18, 1998 PROJECT NO: 0771 -2221 DAILY ACTIVITY REPORT: March 4,''1998 Services Performed: Visual Inspection Weather Conditions: Cloudy Contractors on Site: Glenn Thurman Inc. Remarks: On this date, a representative of Fugro - McClelland was present on the above mentioned project to perform the following tests and observations as requested: Approximately 450 cubic yards paving concrete placed by machine and hand. A total of 3 sets of 4 cylinders casted. Locations are listed below. • Alley A, station 1 +73 -3 +19, 4 +42 -7 +18 • Alley B, station 1 +45 -7 +00 • Alley D, station 1 +45 -475 • Alley C, station 3 +39 -5 +47 • Waterview - cul-de -sac • Unit weight from 142 -147, slump range from 2.5" - 3 ", air content range from 5% - 6 %. Ted Nicholas Fugro - McClelland Technician FUGRO-McCLELLAND (SOUTHWEST), INC. Saad M. Hineidi, P.E. Vice President SMH /mv Distribution: Centex Homes - Robert Poole Glenn Thurman Inc. City of Coppell - Garreth Campbe4_ _,