Loading...
Vistas of C P2-LR 980317FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Centex Homes Report Date: March 17 1998 PROJECT Vistas of Coppell, Phase 113 &2C Coppell, Texas Project No .: 0771 -2221 SAMPLE DATE: March 6, 1998 CONTRACTOR: Glenn Thurman, Inc. AGE (days) DATE TESTED TICKET NO.: COMPRESSIVE STRENGTH (psi) CONCRETE SUPPLIER: On Site AMBIENT TEMP. (°F): 42 PLANT/TRUCK: On Site /70CY CONCRETE TEMP. (°F): 54 MIX ID NUMBER: 04/06/98 TIME BATCHED: 8:32 AIR ( % ) (ASTM C -231) 5.5 TIME SAMPLED: 8:55 WATER ADDED (gal): 0 WEATHER CONDITION: Overcast SLUMP (inches) (ASTM c -143) 6 LOCATION OF PLACEMENT: Pavement on grade - Forest Hill Drive, sampled at station 8 +00 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches CYLINDER NUMBER AGE (days) DATE TESTED TOTAL LOAD (pounds) COMPRESSIVE STRENGTH (psi) REQUIRED COMPRESSIVE STRENGTH (psi) VCC 97 7 03/13/98 95000 3361 3000/28 days VCC 98 28 04/06/98 VCC 99 28 04/06/98 VCC 100 Hold Specifications: Making & ASTM C -31 Testing Methods: ASTM C -143, ASTM C -39 Curing: REMARKS: Technician: Michael Flute FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By: —�-- SMH /rm Distribution: Centex Homes - Robert Poole Glenn Thurman Inc. City of Coppell - Garreth Campbell FUGRO SOUTH, INC. �ORO 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Centex Homes PROJECT Vistas of Coppell, Phase 1 B & 2C Coppell, Texas Report Date March 17, 1998 Project No.: 0771 -2221 SAMPLE DATE: March S, 1998 CONTRACTOR: TICKET NO.: AMBIENT TEMP. ( °F): CONCRETE TEMP. ( °F): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Glenn Thurman, Inc. CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard &' x 12 28.27 square inches CONCRETE SUPPLIER: On Site 45 PLANT/TRUCK: On Site /70 CY 53 MIX ID NUMBER: 7 12:15 AIR ( % ) (ASTM C -231) 5.5 12:45 WATER ADDED (gal): 0 Overcast SLUMP (inches) (ASTM C -143) 53/4 Alley C, pavement on grade, sampled at corner eyebrow area CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard &' x 12 28.27 square inches CYLINDER NUMBER AGE (days) DATE TESTED TOTAL LOAD (pounds) COMPRESSIVE STRENGTH (psi) REQUIRED COMPRESSIVE STRENGTH (psi) VCC 97A 7 03/13/98 97000 3432 3000/28 days VCC 98A 28 04/06/98 VCC 99A 28 04/06/98 VCC 100A Hold Specifications: Making & ASTM C-31 Testing Methods: ASTM 0-143, ASTM C-39 Curing: REMARKS: Technician: William Freeze FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By SMH /rm Distribution: Centex Homes - Robert Poole Glenn Thurman Inc. City of Coppell - Garreth Campbell FUGRO SOUTH, INC. r - � 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Centex Homes Report Date March 17, 1998 PROJECT Vistas of Coppell, Phase 16 &2C Coppell, Texas Project No .: 0771 -2221 SAMPLE DATE: February: 28, 1998 CONTRACTOR: TICKET NO.: AMBIENT TEMP. ( °F): CONCRETE TEMP. ( °F): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Glenn Thurman, Inc. CONCRETE SUPPLIER: On Site 56 PLANT/TRUCK: 62 MIX ID NUMBER: 10:20 am AIR ( %) (ASTM C -231) 10:30 am WATER ADDED (gal): Cold /windy SLUMP (inches) (ASTM C -143) 2 Paving: Waterview Dr., station 6 +50 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard V' x 12 ", 28.27 square! inches CYLINDER NUMBER AGE (days) DATE TESTED TOTAL LOAD (pounds) COMPRESSIVE STRENGTH (psi) REQUIRED COMPRESSIVE STRENGTH (psi) VCC 33 7 03/07/98 Cylinder destroyed in the field 3600/28 days VCC 34 28 03/28/98 Cylinder destroyed in the field VCC 35 28 03/28/98 Cylinder destroyed in the field VCC 36 Hold I I Cylinder destroyed in the field Specifications: Making & ASTM C -31 Testing Methods: ASTM C -143, ASTM C -39 Curing: REMARKS: Technician: William Freeze FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By: ) SMH /rm Distribution: Centex Homes - Robert Poole Glenn Thurman Inc. City of Coppell - Garreth Campbell