Vistas of C P2-LR 980316oRa FUGRO- McCLELLAND (SOUTHWEST), INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 OBSERVATION OF CONCRETE PLACEMENT CLIENT: Centex Homes REPORT DATE: March 16, 1998 PROJECT: Vistas of Coppell, Phase 1B & 2C Coppell, Texas PROJECT NO: 0771 -2221 DATE PERFORMED: March 5, 9998 General Contractor: Glen Thurman Inc. Method of Test: Applicable ACI Recommendations and ASTM Standards Results 1 Remarks: Concrete placement observation was performed at the Alleys and street coves, intersection Area 1A -26 following location: Time placement began: Time placement ended: Total cubic yards placed: Slump range (inches): Slump required (inches): Concrete supplier and plant: Concrete temperature range ( °F): Strength required (psi /days): Number of cylinders made: Superplasticizer used: 7:30 A.M. 3:30 P.M. 291 53/4 5 On site 66 -72 °F 3000/28 No Mike Flute Fugro - McClelland Technician FUGRO- McCLELLAND (SOUTHWEST), INC. Checked SMH /mv Distribution: Centex Homes - Robert Poole Glenn Thurman Inc. City of Coppell - Garreth Campbell �[aRD FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Centex Homes Report Date March 16 1998 PROJECT Vistas of Coppell, Phase 1B &2C Coppell, Texas Project No .: 0771 -2221 SAMPLE DATE: March 3, 1998 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Glenn Thurman, Inc. CONCRETE SUPPLIER: On Site 45 PLANT/TRUCK: 58 MIX ID NUMBER: 8:45 am AIR ( % ) (ASTM C -231) 9:10 am WATER ADDED (gal): 0 Cool slightly mild SLUMP (inches) (ASTM C -143) 1.5 Paving: Lyndsie Dr. station 7 +00 CONCRETE CYLINDER C0MPRE551Vt s I Kr-NU 111-1 1 CO 10 Standard 6" x 12", 28.27 square inches CYLINDER NUMBER AGE (days) DATE TESTED TOTAL LOAD (pounds) COMPRESSIVE STRENGTH (psi) REQUIRED COMPRESSIVE STRENGTH (psi) VCC 73 7 03/10/98 115000 4068 3600/28 days VCC 74 28 03/31/98 VCC 75 28 03/31/98 VCC 76 Hold Specifications: Making & ASTM C -31 Testing Methods: ASTM C -143, ASTM C -39 Curing: REMARKS: Unit Weight: 146 Ibs /cu. ft. Technician: William Freeze FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By: -= SMH /rm Distribution: Centex Homes - Robert Poole Glenn Thurman Inc. City of Coppell - Garreth Campbell FUGRO SOUTH, INC. r � � 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Centex Homes Report Date: March 16, 1998 PROJECT Vistas of Coppell, Phase 1B &2C Coppell, Texas Project No .: 0771 -2221 SAMPLE DATE: 'March '3, 1998' CONTRACTOR: TICKET NO.: AMBIENT TEMP. ( °F): CONCRETE TEMP. (°F): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Glenn Thurman, Inc. CONCRETE SUPPLIER: On Site 42 PLANT/TRUCK: 51 MIX ID NUMBER: 7:30 am AIR ( %) (ASTM C -231) 7:55 am WATER ADDED (gal): 0 Cold SLUMP (inches) (ASTM c -143) 3 Paving: Lyndsie Drive, station 5 +50 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard W' x 12 ", 28.27 square inches CYLINDER NUMBER AGE (days) DATE TESTED TOTAL LOAD (pounds) COMPRESSIVE STRENGTH (psi) REQUIRED COMPRESSIVE STRENGTH (psi) VCC 69 7 03/10/98 78000 2760 3600/28 days VCC 70 28 03/31/98 VCC 71 28 03/31/98 VCC 72 1 Hold Specifications: Making & ASTM C -31 Testing Methods: ASTM C -143, ASTM C -39 Curing: REMARKS: Unit Weight: 142 Ibs /cu. ft. Technician: William Freeze FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By: SMH /br Distribution: Centex Homes - Robert Poole choose contractor City of Coppell - Garreth Campbell