Vistas of C P2-LR 980313FUGRO SOUTH, INC.
s_
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484 -8301; Fax (972) 620 -7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Centex Homes Report Date: March 13, 1998
PROJECT: Vistas of Coppell, Phase 1B & 2C Coppell, Texas Project No.: 0771 -2221
SAMPLE DATE: March 2, 1998
CONTRACTOR:
Glenn Thurman, Inc.
TICKET NO.:
DATE
TESTED
CONCRETE SUPPLIER: On Site
AMBIENT TEMP. (°F):
42
PLANT/TRUCK:
CONCRETE TEMP. ff):
58
MIX ID NUMBER:
TIME BATCHED:
8:50
AIR ( %) (ASTM C -231) 4.0
TIME SAMPLED:
9:00
WATER ADDED (gal): 0
WEATHER CONDITION:
Clear
SLUMP (inches) (ASTM C -143) 3
LOCATION OF PLACEMENT:
Paving:
Rock Crest Court, station 3 +50
CONCRETE CYLINDER COMPRESSIVE STRENGTH TE5T5
Standard W x 12 11 , 28.27 square inches
CYLINDER
NUMBER
AGE
(days)
DATE
TESTED
TOTAL LOAD
(pounds)
COMPRESSIVE
STRENGTH
(psi)
REQUIRED COMPRESSIVE
STRENGTH
(Psi)
VCC 45
7
03/09/98
100000
3538
3000/28 days
VCC 46
28
03/30/98
VCC 47
28
03/30/98
VCC 48
Hold
Specifications: Making & ASTM C -31 Testing Methods: ASTM C -143, ASTM C -39
Curing:
REMARKS: Unit Weight: 146.5 lbs. /cu. ft.
Technician: Burl Cooper
FUGRO- McCLELLAND (SOUTHWEST), INC.
Checked By
SM H /rm
Distribution: Centex Homes - Robert Poole
Glenn Thurman Inc.
City of Coppell - Garreth Campbell
FUGRO SOUTH, INC.
An 13"D
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484 -8301; Fax (972) 620 -7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Centex Homes Report Date: March 13, 1998
PROJECT: Vistas of Coppell, Phase 1 B & 2C Coppell, Texas Project No.: 0771 -2221
SAMPLE DATE: March 2, 1998
CONTRACTOR:
Glenn Thurman, Inc.
AGE
(days)
TICKET NO.:
TOTAL LOAD
(pounds)
CONCRETE SUPPLIER: GTI
AMBIENT TEMP. ( °F):
60
PLANTITRUCK:
CONCRETE TEMP. ( °F):
60
MIX ID NUMBER:
TIME BATCHED:
4:00 pm
AIR ( %) (ASTM C -231) 5
TIME SAMPLED:
4:15 pm
WATER ADDED (gal): 0
WEATHER CONDITION:
Clear /mild
SLUMP (inches) (ASTM C -143) 21/2
LOCATION OF PLACEMENT:
Paving: Lyndsie Drive,
station 3 +50
CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS
Standard 6" x 12 ", 28.27 square inches
CYLINDER
NUMBER
AGE
(days)
DATE
TESTED
TOTAL LOAD
(pounds)
COMPRESSIVE
STRENGTH
(psi)
REQUIRED COMPRESSIVE
STRENGTH
(psi)
VCC 61
7
03/09/98
113000
3998
3000/28 days
VCC 62
28
03/30/98
VCC 63
28
03/30/98
VCC 64
Hold
Specifications: Making & ASTM C -31 Testing Methods: ASTM C -143, ASTM C -39
Curing:
REMARKS: Unit Weight: 115.2 lbs. /cu. ft.
Technician: William E. Ruff FUGRO- McCLELLAND (SOUTHWEST), INC.
Checked By -- —
SMH /rm
Distribution: Centex Homes - Robert Poole
Glenn Thurman Inc.
City of Coppell - Garreth Campbell ✓
FUGRO SOUTH, INC.
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484 -8301; Fax (972) 620 -7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT Centex Homes Report Date March 13, 1998
PROJECT Vistas of Coppell, Phase 113 &2C Coppell, Texas Project No.: 0771 -2221
SAMPLE DATE: March '2, 1!998 1
CONTRACTOR:
GTI
AGE
(days)
TICKET NO.:
TOTAL LOAD
(pounds)
CONCRETE SUPPLIER: GTI
AMBIENT TEMP. ( °F):
58
PLANT/TRUCK:
CONCRETE TEMP. ( °F):
54
MIX ID NUMBER:
TIME BATCHED:
5:30 pm
AIR ( % ) (ASTM C -231) 5.5
TIME SAMPLED:
5:40 pm
WATER ADDED (gal): 0
WEATHER CONDITION:
Clear /cool
SLUMP (inches) (ASTM C -143) 21/4
LOCATION OF PLACEMENT:
Paving: Lyndsie Drive,
station 4 +75
CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS
Standard 6" x 12 ", 28.27 square inches
CYLINDER
NUMBER
AGE
(days)
DATE
TESTED
TOTAL LOAD
(pounds)
COMPRESSIVE
STRENGTH
(psi)
REQUIRED COMPRESSIVE
STRENGTH
(psi)
VCC 65
7
03/09/98
100000
3538
3000/28 days
VCC 66
28
03/30/98
VCC 67
28
03/30/98
VCC 68
Hold
Specifications: Making & ASTM C -31 Testing Methods: ASTM C -143, ASTM C -39
Curing:
REMARKS: Unit Weight: 140.4 lbs. /cu. ft.
Technician: William E. Ruff
FUGRO- McCLELLAND (SOUTHWEST), INC.
Checked By: �
SMH /rm
Distribution: Centex Homes - Robert Poole
Glenn Thurman Inc.
City of Coppell - Garreth Campbell
FUGRO- McCLELLAND (SOUTHWEST), INC.
- ow
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484 -8301; Fax (972) 620 -7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Centex Homes Report Date: March 13, 1998
PROJECT: Vistas of Coppell, Phase 1B &2C, Coppell, Texas Project No.: 0771 -2221
SAMPLE DATE: Mar 2, 1998
CONTRACTOR:
Glenn Thurman, Inc.
AGE
(days)
TICKET NO.:
TOTAL LOAD
(pounds)
CONCRETE SUPPLIER:
On Site
AMBIENT TEMP. (°F):
48
PLANT/TRUCK:
87000
CONCRETE TEMP. (°F):
60
MIX ID NUMBER:
28
TIME BATCHED:
9:50
AIR ( %) (ASTM C -231)
5
TIME SAMPLED:
10:00
WATER ADDED (gal):
0
WEATHER CONDITION:
Clear
SLUMP (inches) (ASTM C -143)
21/2
LOCATION OF PLACEMENT:
Paving:
Rock Crest Court, station 4 +00
CONCRETE CYLINDER COMPRESSIVE "STRENGTH TE'5I 5
Standard ' x 12" 28.27 square inches
CYLINDER
NUMBER
AGE
(days)
DATE
TESTED
TOTAL LOAD
(pounds)
COMPRESSIVE
STRENGTH
(psi)
REQUIRED COMPRESSIVE
STRENGTH
(psi)
VCC 49
7
03/09/98
87000
3078
3000/28 days
VCC 50
28
03/30/98
VCC 51
28
03/30/98
VCC 52
Hold
Specifications: Making & ASTM C -31 Testing Methods: ASTM C -143, ASTM C -39
Curing:
REMARKS: Unit Weight: 144 lbs. /cu. ft.
Technician: Burl Cooper
FUGRO- McCLELLAND (SOUTHWEST), INC.
Checked By:
SMH /rm
Distribution: Centex Homes - Robert Poole
Glenn Thurman Inc.
City of Coppell - Garreth Campbell
IGRO
FUGRO- McCLELLAND (SOUTHWEST), INC.
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484 -8301; Fax (972) 620 -7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Centex Homes Report Date: March 13, 1998
PROJECT: Vistas of Coppell, Phase 1B &2C, Coppell, Texas Project No.: 0771 -2221
SAMPLE DATE: March'2, 1998
CONTRACTOR:
TICKET NO.:
AMBIENT TEMP. ( °F):
CONCRETE TEMP. ( °F):
TIME BATCHED:
TIME SAMPLED:
WEATHER CONDITION:
LOCATION OF PLACEMENT:
Glenn Thurman, Inc.
CONCRETE SUPPLIER:
52 PLANT/TRUCK:
60 MIX ID NUMBER:
11:55 AIR ( %) ( ASTM C -231)
12:10 WATER ADDED (gal):
Clear SLUMP (inches) (ASTM C -143)
Paving: Willow Ridge Court, station 3 +50
Glenn Thurman
On Site
5.0
0
3
CONCRETE CYLINDER COMPRESSIVE. STRENGTH TESTS
Standard V x 12 ",'288.27 square inches
CYLINDER
NUMBER
AGE
(days)
DATE
TESTED
TOTAL LOAD
(pounds)
COMPRESSIVE
STRENGTH
(psi)
REQUIRED COMPRESSIVE
STRENGTH
(psi)
VCC 53
7
03/09/98
90000
3184
3000/28 days
VCC 54
28
03/30/98
VCC 55
28
03/30/98
VCC 56
Hold
Specifications: Making & ASTM C-31 Testing Methods: ASTM C -143, ASTM C-39
Curing:
REMARKS: Unit Weight: 145.6 lbs. /cu. ft.
Technician: Burl Cooper
FUGRO- McCLELLAND (SOUTHWEST), INC.
Checked By:
SMH /rm
Distribution: Centex Homes - Robert Poole
Glenn Thurman Inc.
City of Coppell - Garreth Campbell
FUGRO- McCLELLAND (SOUTHWEST), INC.
■
ono
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484 -8301; Fax (972) 620 -7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Centex Homes Report Date: March 13, 1998
PROJECT: Vistas of Coppell, Phase 113 &2C, Coppell, Texas Project No.: 0771 -2221
SAMPLE DATE: March 2, 1998
CONTRACTOR:
TICKET NO.:
AMBIENT TEMP. (°F):
CONCRETE TEMP. (°F):
TIME BATCHED:
TIME SAMPLED:
WEATHER CONDITION:
LOCATION OF PLACEMENT:
Glenn Thurman, Inc.
CONCRETE SUPPLIER:
55 PLANTITRUCK:
60 MIX ID NUMBER:
2:20 AIR ( %) ( ASTM C -231)
2:30 WATER ADDED (gal):
Clear SLUMP (inches) (ASTM C -143)
Paving: Rock Crest Drive, station 4 +00
Glenn Thurman
On Site
4.6
0
21/2
CONCRETE CYLWDER COMPRESSIVE STRENGTH TESTS
Standard 6" x 12 ", 28.27 square`inches
CYLINDER
NUMBER
AGE
(days)
DATE
TESTED
TOTAL LOAD
(pounds)
COMPRESSIVE
STRENGTH
(psi)
REQUIRED COMPRESSIVE
STRENGTH
(psi)
VCC 57
7
03/09/98
140000
4953
3000/28 days
VCC 58
28
03/30/98
VCC 59
28
03/30/98
VCC 60
Hold
Specifications: Making & ASTM C -31 Testing Methods: ASTM C -143, ASTM C -39
Curing:
REMARKS:
Technician: Burl Cooper
FUGRO- McCLELLAND (SOUTHWEST), INC.
Checked By:
SMH /rm
Distribution: Centex Homes - Robert Poole
Glenn Thurman Inc.
City of Coppell - Garreth Campbell