Loading...
Vistas of C P2-LR 980313FUGRO SOUTH, INC. s_ 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Centex Homes Report Date: March 13, 1998 PROJECT: Vistas of Coppell, Phase 1B & 2C Coppell, Texas Project No.: 0771 -2221 SAMPLE DATE: March 2, 1998 CONTRACTOR: Glenn Thurman, Inc. TICKET NO.: DATE TESTED CONCRETE SUPPLIER: On Site AMBIENT TEMP. (°F): 42 PLANT/TRUCK: CONCRETE TEMP. ff): 58 MIX ID NUMBER: TIME BATCHED: 8:50 AIR ( %) (ASTM C -231) 4.0 TIME SAMPLED: 9:00 WATER ADDED (gal): 0 WEATHER CONDITION: Clear SLUMP (inches) (ASTM C -143) 3 LOCATION OF PLACEMENT: Paving: Rock Crest Court, station 3 +50 CONCRETE CYLINDER COMPRESSIVE STRENGTH TE5T5 Standard W x 12 11 , 28.27 square inches CYLINDER NUMBER AGE (days) DATE TESTED TOTAL LOAD (pounds) COMPRESSIVE STRENGTH (psi) REQUIRED COMPRESSIVE STRENGTH (Psi) VCC 45 7 03/09/98 100000 3538 3000/28 days VCC 46 28 03/30/98 VCC 47 28 03/30/98 VCC 48 Hold Specifications: Making & ASTM C -31 Testing Methods: ASTM C -143, ASTM C -39 Curing: REMARKS: Unit Weight: 146.5 lbs. /cu. ft. Technician: Burl Cooper FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By SM H /rm Distribution: Centex Homes - Robert Poole Glenn Thurman Inc. City of Coppell - Garreth Campbell FUGRO SOUTH, INC. An 13"D 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Centex Homes Report Date: March 13, 1998 PROJECT: Vistas of Coppell, Phase 1 B & 2C Coppell, Texas Project No.: 0771 -2221 SAMPLE DATE: March 2, 1998 CONTRACTOR: Glenn Thurman, Inc. AGE (days) TICKET NO.: TOTAL LOAD (pounds) CONCRETE SUPPLIER: GTI AMBIENT TEMP. ( °F): 60 PLANTITRUCK: CONCRETE TEMP. ( °F): 60 MIX ID NUMBER: TIME BATCHED: 4:00 pm AIR ( %) (ASTM C -231) 5 TIME SAMPLED: 4:15 pm WATER ADDED (gal): 0 WEATHER CONDITION: Clear /mild SLUMP (inches) (ASTM C -143) 21/2 LOCATION OF PLACEMENT: Paving: Lyndsie Drive, station 3 +50 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches CYLINDER NUMBER AGE (days) DATE TESTED TOTAL LOAD (pounds) COMPRESSIVE STRENGTH (psi) REQUIRED COMPRESSIVE STRENGTH (psi) VCC 61 7 03/09/98 113000 3998 3000/28 days VCC 62 28 03/30/98 VCC 63 28 03/30/98 VCC 64 Hold Specifications: Making & ASTM C -31 Testing Methods: ASTM C -143, ASTM C -39 Curing: REMARKS: Unit Weight: 115.2 lbs. /cu. ft. Technician: William E. Ruff FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By -- — SMH /rm Distribution: Centex Homes - Robert Poole Glenn Thurman Inc. City of Coppell - Garreth Campbell ✓ FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT Centex Homes Report Date March 13, 1998 PROJECT Vistas of Coppell, Phase 113 &2C Coppell, Texas Project No.: 0771 -2221 SAMPLE DATE: March '2, 1!998 1 CONTRACTOR: GTI AGE (days) TICKET NO.: TOTAL LOAD (pounds) CONCRETE SUPPLIER: GTI AMBIENT TEMP. ( °F): 58 PLANT/TRUCK: CONCRETE TEMP. ( °F): 54 MIX ID NUMBER: TIME BATCHED: 5:30 pm AIR ( % ) (ASTM C -231) 5.5 TIME SAMPLED: 5:40 pm WATER ADDED (gal): 0 WEATHER CONDITION: Clear /cool SLUMP (inches) (ASTM C -143) 21/4 LOCATION OF PLACEMENT: Paving: Lyndsie Drive, station 4 +75 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches CYLINDER NUMBER AGE (days) DATE TESTED TOTAL LOAD (pounds) COMPRESSIVE STRENGTH (psi) REQUIRED COMPRESSIVE STRENGTH (psi) VCC 65 7 03/09/98 100000 3538 3000/28 days VCC 66 28 03/30/98 VCC 67 28 03/30/98 VCC 68 Hold Specifications: Making & ASTM C -31 Testing Methods: ASTM C -143, ASTM C -39 Curing: REMARKS: Unit Weight: 140.4 lbs. /cu. ft. Technician: William E. Ruff FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By: � SMH /rm Distribution: Centex Homes - Robert Poole Glenn Thurman Inc. City of Coppell - Garreth Campbell FUGRO- McCLELLAND (SOUTHWEST), INC. - ow 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Centex Homes Report Date: March 13, 1998 PROJECT: Vistas of Coppell, Phase 1B &2C, Coppell, Texas Project No.: 0771 -2221 SAMPLE DATE: Mar 2, 1998 CONTRACTOR: Glenn Thurman, Inc. AGE (days) TICKET NO.: TOTAL LOAD (pounds) CONCRETE SUPPLIER: On Site AMBIENT TEMP. (°F): 48 PLANT/TRUCK: 87000 CONCRETE TEMP. (°F): 60 MIX ID NUMBER: 28 TIME BATCHED: 9:50 AIR ( %) (ASTM C -231) 5 TIME SAMPLED: 10:00 WATER ADDED (gal): 0 WEATHER CONDITION: Clear SLUMP (inches) (ASTM C -143) 21/2 LOCATION OF PLACEMENT: Paving: Rock Crest Court, station 4 +00 CONCRETE CYLINDER COMPRESSIVE "STRENGTH TE'5I 5 Standard ' x 12" 28.27 square inches CYLINDER NUMBER AGE (days) DATE TESTED TOTAL LOAD (pounds) COMPRESSIVE STRENGTH (psi) REQUIRED COMPRESSIVE STRENGTH (psi) VCC 49 7 03/09/98 87000 3078 3000/28 days VCC 50 28 03/30/98 VCC 51 28 03/30/98 VCC 52 Hold Specifications: Making & ASTM C -31 Testing Methods: ASTM C -143, ASTM C -39 Curing: REMARKS: Unit Weight: 144 lbs. /cu. ft. Technician: Burl Cooper FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By: SMH /rm Distribution: Centex Homes - Robert Poole Glenn Thurman Inc. City of Coppell - Garreth Campbell IGRO FUGRO- McCLELLAND (SOUTHWEST), INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Centex Homes Report Date: March 13, 1998 PROJECT: Vistas of Coppell, Phase 1B &2C, Coppell, Texas Project No.: 0771 -2221 SAMPLE DATE: March'2, 1998 CONTRACTOR: TICKET NO.: AMBIENT TEMP. ( °F): CONCRETE TEMP. ( °F): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Glenn Thurman, Inc. CONCRETE SUPPLIER: 52 PLANT/TRUCK: 60 MIX ID NUMBER: 11:55 AIR ( %) ( ASTM C -231) 12:10 WATER ADDED (gal): Clear SLUMP (inches) (ASTM C -143) Paving: Willow Ridge Court, station 3 +50 Glenn Thurman On Site 5.0 0 3 CONCRETE CYLINDER COMPRESSIVE. STRENGTH TESTS Standard V x 12 ",'288.27 square inches CYLINDER NUMBER AGE (days) DATE TESTED TOTAL LOAD (pounds) COMPRESSIVE STRENGTH (psi) REQUIRED COMPRESSIVE STRENGTH (psi) VCC 53 7 03/09/98 90000 3184 3000/28 days VCC 54 28 03/30/98 VCC 55 28 03/30/98 VCC 56 Hold Specifications: Making & ASTM C-31 Testing Methods: ASTM C -143, ASTM C-39 Curing: REMARKS: Unit Weight: 145.6 lbs. /cu. ft. Technician: Burl Cooper FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By: SMH /rm Distribution: Centex Homes - Robert Poole Glenn Thurman Inc. City of Coppell - Garreth Campbell FUGRO- McCLELLAND (SOUTHWEST), INC. ■ ono 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Centex Homes Report Date: March 13, 1998 PROJECT: Vistas of Coppell, Phase 113 &2C, Coppell, Texas Project No.: 0771 -2221 SAMPLE DATE: March 2, 1998 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Glenn Thurman, Inc. CONCRETE SUPPLIER: 55 PLANTITRUCK: 60 MIX ID NUMBER: 2:20 AIR ( %) ( ASTM C -231) 2:30 WATER ADDED (gal): Clear SLUMP (inches) (ASTM C -143) Paving: Rock Crest Drive, station 4 +00 Glenn Thurman On Site 4.6 0 21/2 CONCRETE CYLWDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square`inches CYLINDER NUMBER AGE (days) DATE TESTED TOTAL LOAD (pounds) COMPRESSIVE STRENGTH (psi) REQUIRED COMPRESSIVE STRENGTH (psi) VCC 57 7 03/09/98 140000 4953 3000/28 days VCC 58 28 03/30/98 VCC 59 28 03/30/98 VCC 60 Hold Specifications: Making & ASTM C -31 Testing Methods: ASTM C -143, ASTM C -39 Curing: REMARKS: Technician: Burl Cooper FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By: SMH /rm Distribution: Centex Homes - Robert Poole Glenn Thurman Inc. City of Coppell - Garreth Campbell