Vistas of C P2-LR 980312FUGRO SOUTH, INC.
ON
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484 -8301; Fax (972) 620 -7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Centex Homes Report Date: March 12, 1998
PROJECT: Vistas of Coppell, Phase 113 &2C Coppell, Texas Project No.: 0771 -2221
SAMPLE DATE: March 4,1998
CONTRACTOR:
TICKET NO.:
AMBIENT TEMP. ( °F):
CONCRETE TEMP. ( °F):
TIME BATCHED:
TIME SAMPLED:
WEATHER CONDITION:
LOCATION OF PLACEMENT:
Glenn Thurman, Inc.
66
64
1:30 pm
2:00 pm
cloudy, windy
Paving, hand paved
CONCRETE SUPPLIER: On Site
PLANT/TRUCK:
MIX ID NUMBER:
AIR ( %) ( ASTM C -231) 5
WATER ADDED (gal):
SLUMP (inches) (ASTM C -143) 3
Waterview Ct., Station 1 +00, center of cul -de -sac
CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS
Standard W'x 12 ", 28.27 square /inches
CYLINDER
NUMBER
AGE
(days)
DATE
TESTED
TOTAL LOAD
(pounds)
COMPRESSIVE
STRENGTH
(psi)
REQUIRED COMPRESSIVE
STRENGTH
(psi)
VCC 85
7
3/11/98
118000
4175
3600/28 days
VCC 86
28
4/1/98
VCC 87
28
4/1/98
VCC 88
Hold
Specifications: Making & ASTM C -31 Testing Methods: ASTM C -143, ASTM C -39
Curing:
REMARKS: Unit weight 147 lbs. /cu. ft.
Technician: William Freeze
Checked By:
SMH /kk
Distribution: Centex Homes - Robert Poole
Glenn Thurman
City of Coppell - Garreth Campbell
FUGRO SOUTH, INC.
�GRO
■
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484 -8301; Fax (972) 620 -7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Centex Homes Report Date: March 12, 1998
PROJECT: Vistas of Coppell, Phase 1B &2C Coppell, Texas Project NO.: 0771 -2221
SAMPLE DATE: March 4, 1998
CONTRACTOR:
TICKET NO.:
AMBIENT TEMP. ( °F):
CONCRETE TEMP. (°F):
TIME BATCHED:
TIME SAMPLED:
WEATHER CONDITION:
LOCATION OF PLACEMENT:
Glenn Thurman, Inc.
CONCRETE SUPPLIER: On Site
60 PLANT/TRUCK:
61 MIX ID NUMBER:
10:00 am AIR ( %) (ASTM C -231) 6
10:15 am WATER ADDED (gal):
Cloudy, windy SLUMP (inches) (ASTM c -143) 2.5
Paving - machine: Alley B, station 5 +50
CONCRETE> CYLINDER >COMPRESSIVE!STR'ENGTH TESTS
Standard V' x 12 ", 28.27 square:Inches
CYLINDER
NUMBER
AGE
(days)
DATE
TESTED
TOTAL LOAD
(pounds)
COMPRESSIVE
STRENGTH
(psi)
REQUIRED COMPRESSIVE
STRENGTH
(psi)
VCC 81
7
3/11/98
93000
3290
3600/28 days
VCC 82
28
4/1/98
VCC 83
28
4/1/98
VCC 84
Hold
Specifications: Making & ASTM C -31 Testing Methods: ASTM C -143, ASTM C -39
Curing:
REMARKS: Unit weight 142 lbs. /cu. ft.
Technician: William Freeze
FUGRO- McCLELLAND (SOUTHWEST), INC.
Checked By:
SMH /kk
Distribution: Centex Homes - Robert Poole
Glenn Thurman
City of Coppell - Garreth Campbell
FUGRO SOUTH, INC.
�t
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484 -8301; Fax (972) 620 -7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Centex Homes Report Date March 12, 1998
PROJECT: Vistas of Coppell Phase 1B &2C Coppell, Texas Project No.: 0771 -2221
SAMPLE DATE: March 4, 1998
CONTRACTOR:
TICKET NO.:
AMBIENT TEMP. ( °F):
CONCRETE TEMP. (°F):
TIME BATCHED:
TIME SAMPLED:
WEATHER CONDITION:
LOCATION OF PLACEMENT:
Glenn Thurman, Inc.
CONCRETE SUPPLIER: On Site
58 PLANT/TRUCK:
61 MIX ID NUMBER:
7:40 am AIR ( %) (ASTM C -231) 5
8:00 am WATER ADDED (gal):
cloudy, windy SLUMP (inches) (ASTM C -143) 2.5
Paving - machine: Alley A, station 2 +00
CONCRETE: CYLINDER COMPRESSIVE STRENGTH TESTS
Standard W' x 12 ",:28.27 square!inches
CYLINDER
NUMBER
AGE
(days)
DATE
TESTED
TOTAL LOAD
(pounds)
COMPRESSIVE
STRENGTH
(psi)
REQUIRED COMPRESSIVE
STRENGTH
(psi)
VCC 77
7
3/11/98
90000
3184
3600/28 days
VCC 78
28
4/11/98
VCC 79
28
4/11/98
VCC 80
Hold
Specifications: Making & ASTM C -31 Testing Methods: ASTM C -143, ASTM C -39
Curing:
REMARKS: Unit weight 145 lbs. /cu. ft
Technician: William Freeze
FUGRO- McCLELLAND (SOUTHWEST), INC.
Checked
SMH /kk
Distribution: Centex Homes - Robert Poole
Glenn Thurman
City of Coppell - Garreth Campbell