Vistas of C P2-LR 980311FUGRO SOUTH, INC.
7
2880 Virgo lane; Dallas, Texas 75229
Ph (972) 484 -8301; Fax (972) 620 -7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Centex Homes Report Date: March 11, 1998
PROJECT: Vistas of Coppell, Phase 1B &2C Coppell, Texas Project No.: 0771 -2221
SAMPLE DATE: February 28, 1!998
CONTRACTOR:
TICKET NO.:
AMBIENT TEMP. ( °F):
CONCRETE TEMP. (°F):
TIME BATCHED:
TIME SAMPLED:
WEATHER CONDITION:
LOCATION OF PLACEMENT:
Glenn Thurman, Inc.
CONCRETE SUPPLIER: On Site
58 PLANT/TRUCK:
61 MIX ID NUMBER:
12:30 pm AIR ( %) ( ASTM C -231)
12:45 pm WATER ADDED (gal): 0
Cool /windy SLUMP (inches) (ASTM C -143) 2
Paving: Water View Drive, station 3 +00
CONCRETE CYLINDER 'COMPRESSIVE STRENGTH TESTS
Standard V x 12 ", 28.27 square inches
CYLINDER
NUMBER
AGE
(days)
DATE
TESTED
TOTAL LOAD
(pounds)
COMPRESSIVE
STRENGTH
(psi)
REQUIRED COMPRESSIVE
STRENGTH
(psi)
VCC 41
7
03/07/98
125000
4422
3600/28 days
VCC 42
28
03/28/98
VCC 43
28
03/28/98
VCC 44
Hold
Specifications: Making & ASTM C-31 Testing Methods: ASTM C -143, ASTM C -39
Curing:
REMARKS:
Technician: William Freeze
FUGRO- McCLELLAND (SOUTHWEST), INC.
Checked By:
SMH /rm
Distribution: Centex Homes - Robert Poole
Glenn Thurman Inc.
City of Coppell - Garreth Campbell
FUGRO SOUTH, INC.
�GRO
■
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484 -8301; Fax (972) 620 -7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Centex Homes Report Date: March 11, 1998
PROJECT: Vistas of Coppell, Phase 113 & 2C Coppell, Texas Project NO.: 0771 -2221
REMARKS:
Technician: Scott Rogers
FUGRO- McCLELLAND (SOUTHWEST), INC.
Checked By
SMH /rm
Distribution: Centex Homes - Robert Poole
Glenn Thurman Inc.
City of Coppell - Garreth Campbell
SAMPLE DATE.
February 28
CONTRACTOR:
Glenn Thurman, Inc.
TICKET NO.:
CONCRETE SUPPLIER: On Site
AMBIENT TEMP. ( °F):
58
PLANT/TRUCK: On Site
CONCRETE TEMP. ( °F):
63
MIX ID NUMBER:
TIME BATCHED:
8:15
AIR ( % ) (ASTM C -231)
TIME SAMPLED:
8:20
WATER ADDED (gal): 0
WEATHER CONDITION:
Cloudy
SLUMP (inches) (ASTM c -143) 2.5
LOCATION OF PLACEMENT: Paving: Valley Way,
station 18 +75
REMARKS:
Technician: Scott Rogers
FUGRO- McCLELLAND (SOUTHWEST), INC.
Checked By
SMH /rm
Distribution: Centex Homes - Robert Poole
Glenn Thurman Inc.
City of Coppell - Garreth Campbell
FUGRO SOUTH, INC.
Aana
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484 -8301; Fax (972) 620 -7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Centex Homes Report Date: March 11, 1998
PROJECT: Vistas of Coppell, Phase 1B & 2C Coppell, Texas Project No.: 0771 -2221
SAMPLE ELATE: 'February 28, 1998
CONTRACTOR: Glenn Thurman, Inc.
TICKET NO.: CONCRETE SUPPLIER: On Site
AMBIENT TEMP. (°F): 56 PLANTlTRUCK:
CONCRETE TEMP. (°F): 60 MIX ID NUMBER:
TIME BATCHED: 10:40 am AIR ( %) ( ASTM C -231)
TIME SAMPLED: 10:53 am WATER ADDED (gal): 0
WEATHER CONDITION: Cold /windy SLUMP (inches) (ASTM C -143) 2.25
LOCATION OF PLACEMENT: Paving: Water View Drive, station 5 +50
REMARKS:
Technician: William Freeze
FUGRO-McCLELLAND (SOUTHWEST), INC.
Checked By:
SMH /br
Distribution: Centex Homes - Robert Poole
Glenn Thurman Inc.
City of Coppell - Garreth Campbell