Loading...
Vistas of C P2-LR 980309GRO FUGRO- McCLELLAND (SOUTHWEST), INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Centex Homes Report Date: March 9, 1998 PROJECT: Vistas of Coppell, Phase 1B & 2C Coppell, Texas Project NO.: 0771 -2221 SAMPLE D ATE: 'February 25, 1998 CONTRACTOR: TICKET NO.: AMBIENT TEMP. ( °F): CONCRETE TEMP. (°F): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT Glenn Thurman, Inc. 76 68 1:45 pm Partly cloudy Ailey G CONCRETE SUPPLIER: PLANT/TRUCK: MIX ID NUMBER: AIR ( %) ( ASTM C -231) 3.0 WATER ADDED (gal): 0 SLUMP (inches) (ASTM C -143) 2.5 CONCRETE CYLINDER COMPRESSI1lE STRENGTH TESTS Standard 6" x IT', 28.27 square Inches CYLINDER NUMBER AGE (days) DATE TESTED TOTAL LOAD (pounds) COMPRESSIVE STRENGTH (psi) REQUIRED COMPRESSIVE STRENGTH (psi) VCC 25 7 03/04/98 118000 4175 3000/28 days VCC 26 28 03/25/98 VCC 27 28 03/25/98 VCC 28 Hold Specifications: Making & ASTM C -31 Testing Methods: ASTM C -143, ASTM C -39 Curing: REMARKS: Technician: Kenneth Green FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By --T- SMH /rm Distribution: Centex Homes - Robert Poole Glenn Thurman Inc. City of Coppell - Garreth Campbell FUGRO- McCLELLAND (SOUTHWEST), INC. ■ own 2680 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Centex Homes Report Date: March 9, 1998 PROJECT: Vistas of Coppell, Phase 1B & 2C Coppell, Texas Project NO.: 0771 -2221 SAMPLE DATE: February 28,1998 CONTRACTOR: Glenn Thurman, Inc. TICKET NO.: CONCRETE SUPPLIER: AMBIENT TEMP. (°F): 67 PLANT/TRUCK: CONCRETE TEMP. (°F): 65 MIX ID NUMBER: TIME BATCHED: AIR ( %) (ASTM C -231) 4.8 TIME SAMPLED: 10:50 am WATER ADDED (gal): 0 WEATHER CONDITION: Cloudy SLUMP (inches) (ASTM c -143) 2.0 LOCATION OF PLACEMENT: Alley H REMARKS: Technician: Kenneth Green FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By: ! SMH /rm Distribution: Centex Homes - Robert Poole Glenn Thurman Inc. City of Coppell - Garreth Campbell FUGRO- McCLELLAND (SOUTHWEST), INC. ■ lmwa 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Centex Homes Report Date: March 9, 1998 PROJECT: Vistas of Coppell, Phase 1B & 2C Coppell, Texas Project No.: 0771 -2221 SAMPLE DATE: February 25, 1998' CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Glenn Thurman, Inc. CONCRETE SUPPLIER: On Site 62 PLANT/TRUCK: 68 MIX ID NUMBER: AIR ( %) ( ASTM c -231) 8:31 am WATER ADDED (gal): 0 Cloudy SLUMP (inches) (ASTM c -143) 2.5 Paving: Forest Hill Drive, station 4 +50 CONCRETE CYLINDER. COMPRESSIVE STRENGTH TESTS Standard &" x 12" 28.27 so pars inches CYLINDER NUMBER AGE (days) DATE TESTED TOTAL LOAD (pounds) COMPRESSIVE STRENGTH (psi) REQUIRED COMPRESSIVE STRENGTH (psi) VCC 17 7 03/04/98 120000 4245 3000/28 days VCC 18 28 03/25/98 VCC 19 28 03/25/98 VCC 20 Hold Specifications: Making & ASTM C -31 Testing Methods: ASTM C -143, ASTM C -39 Curing: REMARKS: Technician: Daniel Myers FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By _ SMH /rm Distribution: Centex Homes - Robert Poole Glenn Thurman Inc. City of Coppell - Garreth Campbell