Vistas of C P2-LR 980306FUGRO- McCLELLAND (SOUTHWEST), INC.
■
GRO
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484 -8301; Fax (972) 620 -7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Centex Homes Report Date: March 6, 1998
PROJECT: Vistas of Coppell, Phase 1B & 2C Coppell, Texas Project No.: 0771 -2221
SAMPLE DATE : February 24, IN&
CONTRACTOR:
TICKET NO.:
AMBIENT TEMP. ( °F):
CONCRETE TEMP. ( °F):
TIME BATCHED:
TIME SAMPLED:
WEATHER CONDITION:
LOCATION OF PLACEMENT:
Glenn Thurman
CONCRETE SUPPLIER: On Site
71 PLANT/TRUCK:
78 MIX ID NUMBER:
AIR ( %) ( ASTM C -231)
3:30 pm WATER ADDED (gal): 0
Clear SLUMP (inches) (ASTM C -143) 2.5
Paving: Forest Hill Drive, station 7 +50
CONCRETE' CYLINDER COMPRESSIVE STRENGTH TESTS
Standard 6" x 12",, 28.27 square Inches
CYLINDER
NUMBER
AGE
(days)
DATE
TESTED
TOTAL LOAD
(pounds)
COMPRESSIVE
STRENGTH
(psi)
REQUIRED COMPRESSIVE
STRENGTH
(psi)
VCC 13
7
03/03/98
115000
4068
3000/28 days
VCC 14
28
03/24/98
VCC 15
28
03/24/98
VCC 16
Hold
Specifications: Making & ASTM C -31 Testing Methods: ASTM C -143, ASTM C -39
Curing:
REMARKS:
Technician: Daniel Myers
FUGRO- McCLELLAND (SOUTHWEST), INC.
Checked By:
SMH /rm
Distribution: Centex Homes - Robert Poole
Glenn Thurman Inc.
City of Coppell - Garreth Campbell
FUGRO- McCLELLAND (SOUTHWEST), INC.
GRO
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484 -8301; Fax (972) 620 -7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Centex Homes Report Date: March 6, 1998
PROJECT Vistas of Coppell, Phase 18 & 2C Coppell, Texas Project No .: 0771 -2221
SAMPLE DATE: February 24,1998'
CONTRACTOR:
Glenn Thurman
TICKET NO.:
TOTAL LOAD
(pounds)
CONCRETE SUPPLIER: On Site
AMBIENT TEMP. (°F):
50
PLANTITRUCK: On Site
CONCRETE TEMP. (°F):
58
MIX ID NUMBER:
TIME BATCHED:
8:25
AIR ( % ) (ASTM C -231)
TIME SAMPLED:
8:35
WATER ADDED (gal): 0
WEATHER CONDITION:
Cloudy
SLUMP (inches) (ASTM C -143) 3
LOCATION OF PLACEMENT:
Paving:
200 feet east from Bella Vista on Clairmont Court
CONCRETE'CYLINDER COMPRESSIVE STRENGTH TESTS
Standard V1 x 12 ", 28.27 square inches
CYLINDER
NUMBER
AGE
(days)
DATE
TESTED
TOTAL LOAD
(pounds)
COMPRESSIVE
STRENGTH
(psi)
REQUIRED COMPRESSIVE
STRENGTH
(psi)
VCC 5
7
03/03/98
87000
3078
3000/28 days
VCC 6
28
03/24/98
VCC 7
28
03/24/98
VCC 8
Hold
Specifications: Making & ASTM C -31 Testing Methods: ASTM C -143, ASTM C -39
Curing:
REMARKS:
Technician: Scott Rogers FUGRO- McCLELLAND (SOUTHWEST), INC.
Checked B y�� 1_ — �
SMH /rm
Distribution: Centex Homes - Robert Poole
Glenn Thurman Inc.
City of Coppell - Garreth Campbell ✓
FUGRO- McCLELLAND (SOUTHWEST), INC.
GRO
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484 -8301; Fax (972) 620 -7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Centex Homes Report Date: March 6, 1998
PROJECT: Vistas of Coppell, Phase 1B & 2C Coppell, Texas Project No.: 0771 -2221
SAMPLE DATE': February! 24, 1998'
CONTRACTOR: Glenn Thurman
TICKET NO.: CONCRETE SUPPLIER: On Site
AMBIENT TEMP. ( °F): 67 PLANTITRUCK: On Site
CONCRETE TEMP. ( °F): 68 MIX ID NUMBER:
TIME BATCHED: 11:30 AIR ( %) ( ASTM C -231)
TIME SAMPLED: 11:40 WATER ADDED (gal): 0
WEATHER CONDITION: Clear SLUMP (inches) (ASTM c -143) 2.5
LOCATION OF PLACEMENT: Paving: 10 Feet east from western most point of circle at Willow Ridge Court
CONCRETE. CYLINDER COMPRESSIVE STRENGTH TESTS
Standard 6" 'x '12 ", 28.27 square inches
CYLINDER
NUMBER
AGE
(days)
DATE
TESTED
TOTAL LOAD
(pounds)
COMPRESSIVE
STRENGTH
(psi)
REQUIRED COMPRESSIVE
STRENGTH
(psi)
VCC 9
7
03/03/98
95000
3361
3000/28 days
VCC 10
28
03/24/98
VCC 11
28
03/24/98
VCC 12
Hold
Specifications: Making & ASTM C -31 Testing Methods: ASTM C -143, ASTM C -39
Curing:
REMARKS:
Technician: Scott Rogers
FUGRO- McCLELLAND (SOUTHWEST), INC.
Checked By:
SMH /rm
Distribution: Centex Homes - Robert Poole
Glenn Thurman Inc.
City of Coppell - Garreth Campbell