Loading...
Vistas of C P2-LR 980306FUGRO- McCLELLAND (SOUTHWEST), INC. ■ GRO 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Centex Homes Report Date: March 6, 1998 PROJECT: Vistas of Coppell, Phase 1B & 2C Coppell, Texas Project No.: 0771 -2221 SAMPLE DATE : February 24, IN& CONTRACTOR: TICKET NO.: AMBIENT TEMP. ( °F): CONCRETE TEMP. ( °F): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Glenn Thurman CONCRETE SUPPLIER: On Site 71 PLANT/TRUCK: 78 MIX ID NUMBER: AIR ( %) ( ASTM C -231) 3:30 pm WATER ADDED (gal): 0 Clear SLUMP (inches) (ASTM C -143) 2.5 Paving: Forest Hill Drive, station 7 +50 CONCRETE' CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12",, 28.27 square Inches CYLINDER NUMBER AGE (days) DATE TESTED TOTAL LOAD (pounds) COMPRESSIVE STRENGTH (psi) REQUIRED COMPRESSIVE STRENGTH (psi) VCC 13 7 03/03/98 115000 4068 3000/28 days VCC 14 28 03/24/98 VCC 15 28 03/24/98 VCC 16 Hold Specifications: Making & ASTM C -31 Testing Methods: ASTM C -143, ASTM C -39 Curing: REMARKS: Technician: Daniel Myers FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By: SMH /rm Distribution: Centex Homes - Robert Poole Glenn Thurman Inc. City of Coppell - Garreth Campbell FUGRO- McCLELLAND (SOUTHWEST), INC. GRO 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Centex Homes Report Date: March 6, 1998 PROJECT Vistas of Coppell, Phase 18 & 2C Coppell, Texas Project No .: 0771 -2221 SAMPLE DATE: February 24,1998' CONTRACTOR: Glenn Thurman TICKET NO.: TOTAL LOAD (pounds) CONCRETE SUPPLIER: On Site AMBIENT TEMP. (°F): 50 PLANTITRUCK: On Site CONCRETE TEMP. (°F): 58 MIX ID NUMBER: TIME BATCHED: 8:25 AIR ( % ) (ASTM C -231) TIME SAMPLED: 8:35 WATER ADDED (gal): 0 WEATHER CONDITION: Cloudy SLUMP (inches) (ASTM C -143) 3 LOCATION OF PLACEMENT: Paving: 200 feet east from Bella Vista on Clairmont Court CONCRETE'CYLINDER COMPRESSIVE STRENGTH TESTS Standard V1 x 12 ", 28.27 square inches CYLINDER NUMBER AGE (days) DATE TESTED TOTAL LOAD (pounds) COMPRESSIVE STRENGTH (psi) REQUIRED COMPRESSIVE STRENGTH (psi) VCC 5 7 03/03/98 87000 3078 3000/28 days VCC 6 28 03/24/98 VCC 7 28 03/24/98 VCC 8 Hold Specifications: Making & ASTM C -31 Testing Methods: ASTM C -143, ASTM C -39 Curing: REMARKS: Technician: Scott Rogers FUGRO- McCLELLAND (SOUTHWEST), INC. Checked B y�� 1_ — � SMH /rm Distribution: Centex Homes - Robert Poole Glenn Thurman Inc. City of Coppell - Garreth Campbell ✓ FUGRO- McCLELLAND (SOUTHWEST), INC. GRO 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Centex Homes Report Date: March 6, 1998 PROJECT: Vistas of Coppell, Phase 1B & 2C Coppell, Texas Project No.: 0771 -2221 SAMPLE DATE': February! 24, 1998' CONTRACTOR: Glenn Thurman TICKET NO.: CONCRETE SUPPLIER: On Site AMBIENT TEMP. ( °F): 67 PLANTITRUCK: On Site CONCRETE TEMP. ( °F): 68 MIX ID NUMBER: TIME BATCHED: 11:30 AIR ( %) ( ASTM C -231) TIME SAMPLED: 11:40 WATER ADDED (gal): 0 WEATHER CONDITION: Clear SLUMP (inches) (ASTM c -143) 2.5 LOCATION OF PLACEMENT: Paving: 10 Feet east from western most point of circle at Willow Ridge Court CONCRETE. CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" 'x '12 ", 28.27 square inches CYLINDER NUMBER AGE (days) DATE TESTED TOTAL LOAD (pounds) COMPRESSIVE STRENGTH (psi) REQUIRED COMPRESSIVE STRENGTH (psi) VCC 9 7 03/03/98 95000 3361 3000/28 days VCC 10 28 03/24/98 VCC 11 28 03/24/98 VCC 12 Hold Specifications: Making & ASTM C -31 Testing Methods: ASTM C -143, ASTM C -39 Curing: REMARKS: Technician: Scott Rogers FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By: SMH /rm Distribution: Centex Homes - Robert Poole Glenn Thurman Inc. City of Coppell - Garreth Campbell