Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Vistas of C P1-LR 970804
FUGRO- McCLELLAND (SOUTHWEST), INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Centex Homes Report Date: August 4, 1997 PROJECT: Vistas of Coppell, Phase 1A & 2B, Coppell, Texas Project No.: 0771 -2024 SAMPLE DATE: June 27, 1997 CONTRACTOR: Glenn Thurman Inc. AGE (days) DATE TESTED TICKET NO.: N/A CONCRETE SUPPLIER: GTI AMBIENT TEMP. (°F): 92 PLANT /TRUCK: N/A CONCRETE TEMP. (°F): 93 MIX ID NUMBER: N/A TIME BATCHED: 3:15 P.M. AIR ( %) (ASTM C -231) N/A TIME SAMPLED: 3:30 P.M. WATER ADDED (gal): N/A WEATHER CONDITION: Clear SLUMP (inches) (ASTM C -143) 31/2 LOCATION OF PLACEMENT: Paving, Alley B, station 7 +35 CONCRETE CYLINDER, COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches CYLINDER NUMBER AGE (days) DATE TESTED TOTAL LOAD (pounds) COMPRESSIVE STRENGTH (psi) REQUIRED COMPRESSIVE STRENGTH (psi) VOC 100 7 7 -4 -97 77000 2723 3000/28 days VOC 101 28 7 -25 -97 103000 3643 VOC 102 28 7 -25 -97 107000 3784 VOC 103 Hold Specifications: Making & Curing: ASTM C -31 Testing Methods: ASTM C -143, ASTM C -39 REMARKS: Technician: Jason Brimingham FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By: SMH /rm Distribution: Centex Homes - Derek Earle Glenn Thurman, Inc. City of Coppell - Garreth Campbell FUGRO- McCLELLAND (SOUTHWEST), INC. �GRO 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Centex Homes Report Date August 4, 1997 PROJECT Vistas of Coppell, Phase 1A & 2B, Coppell, Texas Project NO.: 0771 -2024 SAMPLE DATE: June 30, 1997 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Glenn Thurman, Inc. N/A CONCRETE SUPPLIER: GTI 76 PLANT /TRUCK: N/A 85 MIX ID NUMBER: N/A N/A AIR ( % ) (ASTM C -231) 5 N/A WATER ADDED (gal): N/A Sunny SLUMP (inches) (ASTM C -143) 3 Alley E and Westhaven Road VOC 114 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 28.27 square inches CYLINDER NUMBER AGE (days) DATE TESTED TOTAL LOAD (pounds) COMPRESSIVE STRENGTH (psi) REQUIRED COMPRESSIVE STRENGTH (psi) VOC 112 7 07/07/97 110000 3891 3000/28 days VOC 113 28 07/28/97 133000 4704 VOC 114 28 07/28/97 135000 4775 VOC 115 Hold Specifications: Making & Curing: ASTM C -31 Testing Methods: ASTM C -143, ASTM C -39 REMARKS: Technician: Daniel Myers FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By: SMH /rm Distribution: Centex Homes - Derek Earle Glenn Thurman, Inc. City of Coppell - Garreth Campbell FUGRO- McCLELLAND (SOUTHWEST), INC. — ` 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Centex Homes Report Date: August 4, 1997 PROJECT: Vistas of Coppell, Phase 1A & 2B, Coppell, Texas Project NO.: 0771 -2024 SAMP DATE: June 30, 1997' CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. ( °F): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT Glenn Thurman, Inc. N/A 85 88 N/A 10:25 am Sunny Alley E, Rockcrest CONCRETE SUPPLIER: GTI PLANTITRUCK: N/A MIX ID NUMBER: N/A AIR ( %) (ASTM C -231) 5 WATER ADDED (gal): N/A SLUMP (inches) (ASTM c -143) 4 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 11 , 28.27 square inches CYLINDER NUMBER AGE (days) DATE TESTED TOTAL LOAD (pounds) COMPRESSIVE STRENGTH (Psi) REQUIRED COMPRESSIVE STRENGTH (Psi) VOC 116 7 07/07/97 10000 3537 3000/28 days VOC 117 28 07/28/97 130000 4598 VOC 118 28 07/28/97 125000 4421 VOC 119 Hold Specificatiow Making & Curing: ASTM C -31 Testing Methods: ASTM C -143, ASTM C -39 REMARKS: Technician: Daniel Myers FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By: SMH /rm Distribution: Centex Homes - Derek Earle Glenn Thurman, Inc. City of Coppell - Garreth Campbell