Loading...
Vistas of C P1-LR 970717FUGRO- McCLELLAND (SOUTHWEST), INC. w 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Centex Homes Report Date: July 17, 1997 PROJECT: Vistas of Coppell, Phase 1A & 2B, Coppell, Texas Project No.: 0771 -2024 SAMPLE DATE: June 16, 1997 J CONTRACTOR: Glenn Thurman, Inc. AGE (days) DATE TESTED TICKET NO.: N/A CONCRETE SUPPLIER: Glenn Thurman AMBIENT TEMP. (°F): 83 PLANT/TRUCK: On Site CONCRETE TEMP. (°F): 85 MIX ID NUMBER: N/A TIME BATCHED: 10:15 am AIR ( %) (ASTM C -231) 5.1 TIME SAMPLED: 10:20 am WATER ADDED (gal): N/A WEATHER CONDITION: Cloudy SLUMP (inches) (ASTM C -143) 3.0 LOCATION OF PLACEMENT: Paving: Cresthaven Road, station 1 +50 Specifications: Making & Curing: ASTM C -31 Testing Methods: ASTM C -143, ASTM C -39 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches CYLINDER NUMBER AGE (days) DATE TESTED TOTAL LOAD (pounds) COMPRESSIVE STRENGTH (Psi) REQUIRED COMPRESSIVE STRENGTH (Psi) VOC 12 7 06/23/97 93000 3290 3000/28 days VOC 13 28 07/14/97 108500 3838 VOC 14 28 07114/97 98500 3489 VOC 15 Hold Specifications: Making & Curing: ASTM C -31 Testing Methods: ASTM C -143, ASTM C -39 REMARKS: Unit Weight: 144.8 lbs. /cu. ft. Technician: Neil Rana FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By SMH /rm Distribution: Centex Homes - Derek Earle Glenn Thurman, Inc. City of Coppell - Garreth Campbell FUGRO- McCLELLAND (SOUTHWEST), INC. — fu' GRO 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Centex Homes Report Date: July 17, 1997 PROJECT Vistas of Coppell, Phase 1A & 2B, Coppell, Texas Project No.: 0771 -2024 SAMPLE DATE: June 16, 1997 CONTRACTOR: Glenn Thurman, Inc. AGE (days) DATE TESTED TICKET NO.: N/A CONCRETE SUPPLIER: Glenn Thurman AMBIENT TEMP. ( °F): 85 PLANTITRUCK: On Site CONCRETE TEMP. ( °F): 88 MIX ID NUMBER: N/A TIME BATCHED: 11:25 am AIR ( % ) (ASTM C -211) N/A TIME SAMPLED: 11:30 am WATER ADDED (gal): N/A WEATHER CONDITION: Partly cloudy SLUMP (inches) (ASTM C -143) 2.5 LOCATION OF PLACEMENT: Paving: Crestwood Drive, station 10 +50 Specifications: Making & Curing: ASTM C -31 Testing Methods: ASTM C -143, ASTM C -39 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches CYLINDER NUMBER AGE (days) DATE TESTED TOTAL LOAD (pounds) COMPRESSIVE STRENGTH (psi) REQUIRED COMPRESSIVE STRENGTH (psi) VOC 16 7 06/23/97 87000 3077 3000/28 days VOC 17 28 07/14/97 100500 3555 VOC 18 28 07/14/97 111500 3944 VOC 19 Hold Specifications: Making & Curing: ASTM C -31 Testing Methods: ASTM C -143, ASTM C -39 REMARKS: Technician: Neil Rana FUGRO- McCLELLAND (SOUTHWEST), INC. Checked B 7�� SMH /rm Distribution: Centex Homes - Derek Earle Glenn Thurman, Inc. City of Coppell - Garreth Campbell FUGRO- McCLELLAND (SOUTHWEST), INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Centex Homes Report Date July 17, 1997 PROJECT Vistas of Coppell, Phase 1A & 2B, Coppell, Texas Project No .: 0771 -2024 SAMPLE DATE: June 16, 1997 CONTRACTOR: Glenn Thurman, Inc. AGE (days) DATE TESTED TICKET NO.: N/A CONCRETE SUPPLIER: Glenn Thurman AMBIENT TEMP. ( °F): 87 PLANT /TRUCK: On Site CONCRETE TEMP. (°F): 88 MIX ID NUMBER: N/A TIME BATCHED: 12:35 pm AIR ( % ) (ASTM C -231) 5.2 TIME SAMPLED: 12:40 pm WATER ADDED (gal): N/A WEATHER CONDITION: Sunny SLUMP (inches) (ASTM C -143) 2.5 LOCATION OF PLACEMENT: Paving: Rockcrest Drive, station 6 +90 L. Specifications: Making & Curing: ASTM C -31 Testing Methods: ASTM C -143, ASTM C -39 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches CYLINDER NUMBER AGE (days) DATE TESTED TOTAL LOAD (pounds) COMPRESSIVE STRENGTH (Psi) REQUIRED COMPRESSIVE STRENGTH (Psi) VOC 20 7 06/23/97 95000 3360 3000/28 days VOC 21 28 07/14/97 114800 4061 VOC 22 28 07/14/97 105000 3714 VOC 23 Hold L. Specifications: Making & Curing: ASTM C -31 Testing Methods: ASTM C -143, ASTM C -39 REMARKS: Unit Weight: 144.0 lbs. /cu. ft. Technician: Neil Rana FUGRO McCLELLAND (SOUTHWEST), INC. Checked By: c�= — S M H /rm Distribution: Centex Homes - Derek Earle Glenn Thurman, Inc. City of Coppell - Garreth Campbell FUGRO- McCLELLAND (SOUTHWEST), INC. =1 G. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Centex Homes Report Date: July 17, 1997 PROJECT: Vistas of Coppell, Phase 1A & 2B, Coppell, Texas Project No.: 0771 -2024 SAMPLE DATE: June 16, 1997 1 CONTRACTOR: Glenn Thurman, Inc. AGE (days) TICKET NO.: N/A CONCRETE SUPPLIER: Glenn Thurman AMBIENT TEMP. (°F): 92 PLANT /TRUCK: On Site CONCRETE TEMP. (°F): 90 MIX ID NUMBER: N/A TIME BATCHED: 2:15 pm AIR ( %) (ASTM C -231) N/A TIME SAMPLED: 2:20 pm WATER ADDED (gal): N/A WEATHER CONDITION: Sunny SLUMP (inches) (ASTM C -143) 3.25 LOCATION OF PLACEMENT: Paving: Waterview Drive, station 13 +00 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches CYLINDER NUMBER AGE (days) DATE TESTED TOTAL LOAD (pounds) COMPRESSIVE STRENGTH (psi) REQUIRED COMPRESSIVE STRENGTH (Psi) VOC 24 7 06/23/97 95000 3360 3000/28 days VOC 25 28 07/14/97 124800 4414 VOC 26 28 07/14/97 127900 4524 VOC 28 Hold S ifications: Making & Curing: ASTM C -31 Testing Methods: ASTM C -143, ASTM C -39 REMARKS: Technician: Neil Rana FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By SMH /rm Distribution: Centex Homes - Derek Earle Glenn Thurman, Inc. City of Coppell - Garreth Campbell