Vistas of C P1-LR 970717FUGRO- McCLELLAND (SOUTHWEST), INC.
w
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484 -8301; Fax (972) 620 -7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Centex Homes Report Date: July 17, 1997
PROJECT: Vistas of Coppell, Phase 1A & 2B, Coppell, Texas Project No.: 0771 -2024
SAMPLE DATE: June 16, 1997 J
CONTRACTOR:
Glenn Thurman, Inc.
AGE
(days)
DATE
TESTED
TICKET NO.:
N/A
CONCRETE SUPPLIER:
Glenn Thurman
AMBIENT TEMP. (°F):
83
PLANT/TRUCK:
On Site
CONCRETE TEMP. (°F):
85
MIX ID NUMBER:
N/A
TIME BATCHED:
10:15 am
AIR ( %) (ASTM C -231)
5.1
TIME SAMPLED:
10:20 am
WATER ADDED (gal):
N/A
WEATHER CONDITION:
Cloudy
SLUMP (inches) (ASTM C -143)
3.0
LOCATION OF PLACEMENT:
Paving: Cresthaven Road,
station 1 +50
Specifications: Making & Curing: ASTM C -31 Testing Methods: ASTM C -143, ASTM C -39
CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS
Standard 6" x 12 ", 28.27 square inches
CYLINDER
NUMBER
AGE
(days)
DATE
TESTED
TOTAL LOAD
(pounds)
COMPRESSIVE
STRENGTH
(Psi)
REQUIRED COMPRESSIVE
STRENGTH
(Psi)
VOC 12
7
06/23/97
93000
3290
3000/28 days
VOC 13
28
07/14/97
108500
3838
VOC 14
28
07114/97
98500
3489
VOC 15
Hold
Specifications: Making & Curing: ASTM C -31 Testing Methods: ASTM C -143, ASTM C -39
REMARKS: Unit Weight: 144.8 lbs. /cu. ft.
Technician: Neil Rana
FUGRO- McCLELLAND (SOUTHWEST), INC.
Checked By
SMH /rm
Distribution: Centex Homes - Derek Earle
Glenn Thurman, Inc.
City of Coppell - Garreth Campbell
FUGRO- McCLELLAND (SOUTHWEST), INC.
— fu' GRO
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484 -8301; Fax (972) 620 -7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Centex Homes Report Date: July 17, 1997
PROJECT Vistas of Coppell, Phase 1A & 2B, Coppell, Texas Project No.: 0771 -2024
SAMPLE DATE: June 16, 1997
CONTRACTOR:
Glenn Thurman, Inc.
AGE
(days)
DATE
TESTED
TICKET NO.:
N/A
CONCRETE SUPPLIER:
Glenn Thurman
AMBIENT TEMP. ( °F):
85
PLANTITRUCK:
On Site
CONCRETE TEMP. ( °F):
88
MIX ID NUMBER:
N/A
TIME BATCHED:
11:25 am
AIR ( % ) (ASTM C -211)
N/A
TIME SAMPLED:
11:30 am
WATER ADDED (gal):
N/A
WEATHER CONDITION:
Partly cloudy
SLUMP (inches) (ASTM C -143)
2.5
LOCATION OF PLACEMENT:
Paving: Crestwood Drive,
station 10 +50
Specifications: Making & Curing: ASTM C -31 Testing Methods: ASTM C -143, ASTM C -39
CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS
Standard 6" x 12 ", 28.27 square inches
CYLINDER
NUMBER
AGE
(days)
DATE
TESTED
TOTAL LOAD
(pounds)
COMPRESSIVE
STRENGTH
(psi)
REQUIRED COMPRESSIVE
STRENGTH
(psi)
VOC 16
7
06/23/97
87000
3077
3000/28 days
VOC 17
28
07/14/97
100500
3555
VOC 18
28
07/14/97
111500
3944
VOC 19
Hold
Specifications: Making & Curing: ASTM C -31 Testing Methods: ASTM C -143, ASTM C -39
REMARKS:
Technician: Neil Rana
FUGRO- McCLELLAND (SOUTHWEST), INC.
Checked B 7��
SMH /rm
Distribution: Centex Homes - Derek Earle
Glenn Thurman, Inc.
City of Coppell - Garreth Campbell
FUGRO- McCLELLAND (SOUTHWEST), INC.
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484 -8301; Fax (972) 620 -7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Centex Homes Report Date July 17, 1997
PROJECT Vistas of Coppell, Phase 1A & 2B, Coppell, Texas Project No .: 0771 -2024
SAMPLE DATE: June 16, 1997
CONTRACTOR:
Glenn Thurman, Inc.
AGE
(days)
DATE
TESTED
TICKET NO.:
N/A
CONCRETE SUPPLIER:
Glenn Thurman
AMBIENT TEMP. ( °F):
87
PLANT /TRUCK:
On Site
CONCRETE TEMP. (°F):
88
MIX ID NUMBER:
N/A
TIME BATCHED:
12:35 pm
AIR ( % ) (ASTM C -231)
5.2
TIME SAMPLED:
12:40 pm
WATER ADDED (gal):
N/A
WEATHER CONDITION:
Sunny
SLUMP (inches) (ASTM C -143)
2.5
LOCATION OF PLACEMENT:
Paving: Rockcrest Drive,
station 6 +90
L. Specifications: Making & Curing: ASTM C -31 Testing Methods: ASTM C -143, ASTM C -39
CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS
Standard 6" x 12 ", 28.27 square inches
CYLINDER
NUMBER
AGE
(days)
DATE
TESTED
TOTAL LOAD
(pounds)
COMPRESSIVE
STRENGTH
(Psi)
REQUIRED COMPRESSIVE
STRENGTH
(Psi)
VOC 20
7
06/23/97
95000
3360
3000/28 days
VOC 21
28
07/14/97
114800
4061
VOC 22
28
07/14/97
105000
3714
VOC 23
Hold
L. Specifications: Making & Curing: ASTM C -31 Testing Methods: ASTM C -143, ASTM C -39
REMARKS: Unit Weight: 144.0 lbs. /cu. ft.
Technician: Neil Rana
FUGRO McCLELLAND (SOUTHWEST), INC.
Checked By: c�= —
S M H /rm
Distribution: Centex Homes - Derek Earle
Glenn Thurman, Inc.
City of Coppell - Garreth Campbell
FUGRO- McCLELLAND (SOUTHWEST), INC.
=1
G.
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484 -8301; Fax (972) 620 -7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Centex Homes Report Date: July 17, 1997
PROJECT: Vistas of Coppell, Phase 1A & 2B, Coppell, Texas Project No.: 0771 -2024
SAMPLE DATE: June 16, 1997 1
CONTRACTOR:
Glenn Thurman, Inc.
AGE
(days)
TICKET NO.:
N/A
CONCRETE SUPPLIER:
Glenn Thurman
AMBIENT TEMP. (°F):
92
PLANT /TRUCK:
On Site
CONCRETE TEMP. (°F):
90
MIX ID NUMBER:
N/A
TIME BATCHED:
2:15 pm
AIR ( %) (ASTM C -231)
N/A
TIME SAMPLED:
2:20 pm
WATER ADDED (gal):
N/A
WEATHER CONDITION:
Sunny
SLUMP (inches) (ASTM C -143)
3.25
LOCATION OF PLACEMENT:
Paving:
Waterview Drive, station 13 +00
CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS
Standard 6" x 12 ", 28.27 square inches
CYLINDER
NUMBER
AGE
(days)
DATE
TESTED
TOTAL LOAD
(pounds)
COMPRESSIVE
STRENGTH
(psi)
REQUIRED COMPRESSIVE
STRENGTH
(Psi)
VOC 24
7
06/23/97
95000
3360
3000/28 days
VOC 25
28
07/14/97
124800
4414
VOC 26
28
07/14/97
127900
4524
VOC 28
Hold
S ifications: Making & Curing: ASTM C -31 Testing Methods: ASTM C -143, ASTM C -39
REMARKS:
Technician: Neil Rana
FUGRO- McCLELLAND (SOUTHWEST), INC.
Checked By
SMH /rm
Distribution: Centex Homes - Derek Earle
Glenn Thurman, Inc.
City of Coppell - Garreth Campbell