Loading...
Vistas of C P1-LR 970716n FUGRO- McCLELLAND (SOUTHWEST), INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 FIELD DENSITY REPORT CLIENT: Centex Homes REPORT DATE: July 16,1997 PROJECT: Vistas of Coppell, Phase 1A & 213, Coppell, Texas PROJECT NO.: 0771 -2024 DATE PERFORMED: July 1,`1997 MOISTUREIDENSITY RELATIONS Material Proctor Results Number Description Maximum Dry Density (pcf) Optimum Moisture ( %) 1 Light brown sandy clay with gravel (lime treated) 110.0 16.5 2 Brown sandy clay (lime treated) 96.9 25.0 TEST RESULTS TEST PROCTOR LOCATION UNIT DRY MOISTURE PERCENT OF NO. NO. WEIGHT CONTENT PERCENT MAXIMUM DENSITY 199 1 Hike and Bike trail, station 3 +50, final 106.8 18.4 97.0 200 1 Hike and Bike trail, station 8 +00, final 106.4 18.0 96.7 201 2 Hike and Bike trail, station 13 +20, final 93.0 28.8 95.9 202 1 Hike and Bike trail, station 18 +10, final 106.0 19.0 96.3 203 2 Hike and Bike trail, station 22 +75, final 93.7 27.7 96.6 204 1 Hike and Bike trail, station 28 +05, final 107.5 16.9 97.7 205 1 Hike and Bike trail, station 32 +45, final 106.5 17.6 96.8 206 2 Hike and Bike trail, station 36 +50, final 95.7 25.7 98.7 Remarks: All densities meet project specifications unless otherwise noted. David Peters Fugro - McClelland Technician FUGRO- McCLELLAND (SOUTHWEST), INC. Checked by: -- -- SMH /mv Distribution: Centex Homes - Derek Earle City of Coppell - Garreth Campbell Glenn Thurman Inc. FUGRO- McCLELLAND (SOUTHWEST), INC. 0 of 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Centex Homes Report Date: July 16, 1997 PROJECT: Vistas of Coppell, Phase 1A & 28, Coppell, Texas Project No.: 0771 -2024 SAMPLE DATE: June 16, 1997 CONTRACTOR: Glenn Thurman, Inc. AGE (days) DATE TESTED TICKET NO.: N/A CONCRETE SUPPLIER: Glenn Thurman AMBIENT TEMP. (°F): 78 PLANT /TRUCK: On Site CONCRETE TEMP. (°F): 83 MIX ID NUMBER: NIA TIME BATCHED: 8:20 am AIR ( %) (ASTM C -231) 5.0 TIME SAMPLED: 8:30 am WATER ADDED (gal): N/A WEATHER CONDITION: Cloudy SLUMP (inches) (ASTM c -143) 3.0 LOCATION OF PLACEMENT: Paving: Cresthaven Road, station 5 +00 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches CYLINDER NUMBER AGE (days) DATE TESTED TOTAL LOAD (pounds) COMPRESSIVE STRENGTH (Psi) REQUIRED COMPRESSIVE STRENGTH (PSI) VOC 4 7 06/23/97 105000 3714 3000/28 days VOC 5 28 07/14/97 121500 4298 VOC 6 28 07/14/97 122750 4342 VOC 7 Hold Specifications: Making & Curing: ASTM C -31 Testing Methods: ASTM C -143, ASTM C -39 REMARKS: Unit Weight: 145.6 lbs. /cu. ft. Technician: Neil Rana S M H /rm Distribution: Centex Homes - Derek Earle Glenn Thurman, Inc. City of Coppell - Garreth Campbell FUGRO-McCLELLAND (SOUTHWEST), INC. Checked By FUGRO- McCLELLAND (SOUTHWEST), INC. 2880 Virgo Lane; Dailas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Centex Homes Report Date: July 16, 1997 PROJECT: Vistas of Coppell, Phase 1A & 2B, Coppell, Texas Project No.: 0771 -2024 SAMPLE DATE: June 16, 1997 CONTRACTOR: Glenn Thurman, Inc. AGE (days) TICKET NO.: N/A CONCRETE SUPPLIER: Glenn Thurman AMBIENT TEMP. ( °F): 80 PLANT /TRUCK: On Site CONCRETE TEMP. ( °F): 84 MIX ID NUMBER: N/A TIME BATCHED: 9:25 am AIR ( %) (ASTM C -231) N/A TIME SAMPLED: 9:30 am WATER ADDED (gal): N/A WEATHER CONDITION: Cloudy SLUMP (inches) (ASTM C -143) 3 LOCATION OF PLACEMENT: Paving: Cresthaven Drive, station 3 +50 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches CYLINDER NUMBER AGE (days) DATE TESTED TOTAL LOAD (pounds) COMPRESSIVE STRENGTH (psi) REQUIRED COMPRESSIVE STRENGTH (psi) VOC 8 7 06/23/97 107000 3785 3000/28 days VOC 9 28 07/14/97 120500 4262 VOC 10 28 07/14/97 130500 4616 VOC 11 Hold Specifications: Making & Curing: ASTM C -31 Testing Methods: ASTM C -143, ASTM C -39 1 14►Ti►_V4. Technician: Neil Rana FUGRO- McCLELLAND (SOUTHWEST), INC. Checked SMH /rm Distribution: Centex Homes - Derek Earle Glenn Thurman, Inc. City of Coppell - Garreth Campbell FUGRO- McCLELLAND (S OUTHWEST), INC. �GRO 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Centex Homes Report Date July 16, 1997 PROJECT Vistas of Coppell, Phase 1A & 2B, Coppell, Texas Project No.: 0771 -2024 SAMPLE DATE: June 16, 1997 CONTRACTOR: Glenn Thurman, Inc. AGE (days) TICKET NO.: N/A CONCRETE SUPPLIER: Glenn Thurman AMBIENT TEMP. (°F): 90 PLANT/TRUCK: On Site CONCRETE TEMP. (°F): 92 MIX ID NUMBER: N/A TIME BATCHED: 3:55 pm AIR ( % ) (ASTM C -231) N/A TIME SAMPLED: 4:00 pm WATER ADDED (gal): N/A WEATHER CONDITION: Sunny SLUMP (inches) (ASTM C -143) 3.0 LOCATION OF PLACEMENT: Paving: Waterview Drive, station 16 +00 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches CYLINDER NUMBER AGE (days) DATE TESTED TOTAL LOAD (pounds) COMPRESSIVE STRENGTH (psi) REQUIRED COMPRESSIVE STRENGTH (psi) VOC 28 7 06/23/97 97000 3431 3000/28 days VOC 29 28 07/14/97 136900 4842 VOC 30 28 07/14/97 132000 4669 VOC 31 Hold Specifications: Making & Curing: ASTM C - 31 Testing Methods: ASTM C - 143, ASTM C - 39 REMARKS: Technician: Neil Rana FUGRO- McCLELLAND (SOUTHWEST), INC. Checked B +! SMH /rm Distribution: Centex Homes - Derek Earle Glenn Thurman, Inc. City of Coppell - Garreth Campbell