Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Vistas of C P1-LR 970708
FUGRO- McCLELLAND (SOUTHWEST), INC. �GRO ■ G 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Centex Homes Report Date: July 8, 1997 PROJECT Vistas of Coppell, Phase 1A & 2B, Coppell, Texas Project No .: 0771 -2024 SAMPLE DATE: June 27, 1997 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Glenn Thurman Inc. CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 28.27 square inches CONCRETE SUPPLIER: GTI 92 PLANT/TRUCK: 93 MIX ID NUMBER: 3:15 P.M. AIR ( % ) (ASTM C -231) 3:30 P.M. WATER ADDED (gal): Clear SLUMP (inches) (ASTM c -143) 3 1/2 Paving, Alley B, station 7 +35 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 28.27 square inches CYLINDER NUMBER AGE (days) DATE TESTED TOTAL LOAD (pounds) COMPRESSIVE STRENGTH (psi) REQUIRED COMPRESSIVE STRENGTH (Psi) VOC 100 7 7 -4 -97 77000 2723 3000/28 days VOC 101 28 7 -25 -97 VOC 102 28 7 -25 -97 VOC 103 Hold Specifications: Making & Curing: ASTM C -31 Testing Methods: ASTM C -143, ASTM C -39 REMARKS: Technician: Jason Brimingham FUGRO McCLELLAND (SOUTHWEST), INC. Checked By: SMH /mv Distribution: Centex Homes - Derek Earle Glenn Thurman, Inc. City of Coppell - Garreth Campbell . I�� FUGRO- McCLELLAND (SOUTHWEST), INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Centex Homes Report Date July 8, 1997 PROJECT Vistas of Coppell, Phase 1A & 26, Coppell, Texas Project No.: 0771 -2024 SAMPLE DATE: June '28,' 1997 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: REMARKS: Technician: Bob Shea Glen Thurman Inc. CONCRETE SUPPLIER: GTI 850 PLANTITRUCK: On site 86 MIX ID NUMBER: 11:20 A.M. AIR ( % (ASTM C -231) 4.5 11:39 A.M. WATER ADDED (gal): Clear SLUMP (inches) (ASTM C -143) 1.0 Paving, alleyway J, station 6 +50. FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By: — SMH /mv Distribution: Centex Homes - Derek Earle Glenn Thurman, Inc. City of Coppell - Garreth Campbell( �GRO FUGRO- McCLELLAND (SOUTHWEST), INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Centex Homes Report Date: July 8 1997 PROJECT Vistas of Coppell, Phase 1A & 26, Coppell, Texas Project No .: 0771 -2024 SAMPLE DATE: June 26, 19 CONTRACTOR: Glenn Thurman, Inc. N/A CONCRETE SUPPLIER: On Site TICKET NO.: °F): 89 PLANT /TRUCK: On Site AMBIENT TEMP. ( °F): 79 MIX ID NUMBER: Hand Wk CONCRETE TEMP. { 12:40 pm AIR ( % ) (ASTM C -231) NIA TIME BATCHED: TIME SAMPLED: 12:45 pm WATER ADDED (gal): N/A WEATHER CONDITION: Partly cloudy SLUMP (inches) (ASTM c - 143) to Whitewater west side of 4.25 approach, 5 feet LOCATION OF PLACEMENT: Paving: Melavista approach east from curb CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches CYLINDER AGE DATE TOTAL LOAD COMPRESSIVE NUMBER (days) TESTED (pounds) STRENGTH (Psi) VOC 96 7 07/03/97 107000 3784 VOC 97 28 07/24/97 VOC 98 28 07/24/97 VOC 99 1 Hold AST C-31 Testing Methods: ASTM C -143, ASTM - irrnnnr,c• Makina & Curing: REQUIRED COMPRESSIVE STRENGTH (psi) 3000/28 d REMARKS: Technician: Scott Rogers FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By: SMH /rm Distribution: Centex Homes - Derek Earle Glenn Thurman, Inc. City of Coppell - Garreth Campbell FUGRO- McCLELLAND (SOUTHWEST), INC. �GRO ■ 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Centex Homes Report Date: July 8 1997 PROJECT Vistas of Coppell, Phase 1A & 2B, Coppell, Texas Project No .: 0771 -2024 SAMPLE DATE: June 26, 1997 _1 CONTRACTOR: Glenn Thurman, Inc. AGE (days) DATE TESTED TICKET NO.: N/A CONCRETE SUPPLIER: On Site AMBIENT TEMP. (°F): 80 PLANT /TRUCK: On Site CONCRETE TEMP. (°F): 77 MIX ID NUMBER: Hand Wk TIME BATCHED: 9:05 am AIR ( % ) (ASTM C -231) 5.2 TIME SAMPLED: 9:11 am WATER ADDED (gal): N/A WEATHER CONDITION: Cloudy SLUMP (inches) (ASTM c -143) 4.0 LOCATION OF PLACEMENT: Paving: Circle on Whitewater Drive, station 17 +85 north side of circle CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches CYLINDER NUMBER AGE (days) DATE TESTED TOTAL LOAD (pounds) COMPRESSIVE STRENGTH (psi) REQUIRED COMPRESSIVE STRENGTH (psi) VOC 92 7 07/03/97 105000 3714 3000/28 days VOC 93 28 07/24/97 VOC 94 28 07/24/97 VOC 95 Hold Specifications: Making & Curing: ASTM C -31 Testing Methods: ASTM C -143, ASTM C -39 REMARKS: Technician: Scott Rogers FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By: <� N SMH /rm Distribution: Centex Homes - Derek Earle Glenn Thurman, Inc. City of Coppell - Garreth Campbell FUGRO- McCLELLAND (SOUTHWE INC. �GRO 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Centex Homes Report Date: July 8 1997 PROJECT Vistas of Coppell, Phase 1A & 2B, Coppell, Texas Project No .: 0771 -2024 SAMPLE DATE: June 28,1997 CONTRACTOR: Glen Thurman Inc. AGE (days) DATE TESTED TICKET NO.: COMPRESSIVE STRENGTH (Psi) CONCRETE SUPPLIER: GTI AMBIENT TEMP. (°F): 80 PLANTITRUCK: On site CONCRETE TEMP. (°F): 86 MIX ID NUMBER: 7 -26 -97 TIME BATCHED: 8:45 A.M. AIR ( % ) (ASTM C -231) 4.5 TIME SAMPLED: 9:05 A.M. WATER ADDED (gal): WEATHER CONDITION: Partly Cloudy SLUMP (inches) (ASTM C -143) 4.0 LOCATION OF PLACEMENT: Paving, Forest Hill Drive and Waterview. Specifications: Making & Curing: ASTM C -31 Testing Methods: ASTM C -143, ASTM C -39 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 28.27 square inches CYLINDER NUMBER AGE (days) DATE TESTED TOTAL LOAD (pounds) COMPRESSIVE STRENGTH (Psi) REQUIRED COMPRESSIVE STRENGTH (Psi) VOC 104 7 7 -5 -97 97000 3431 4000/28 days VOC 105 28 7 -26 -97 VOC 106 28 7 -26 -97 VOC 107 Hold Specifications: Making & Curing: ASTM C -31 Testing Methods: ASTM C -143, ASTM C -39 REMARKS: Technician: Bob Shea FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By: SMH /mv Distribution: Centex Homes - Derek Earle Glenn Thurman, Inc. City of Coppell - Garreth Campbell