Loading...
Vistas of C P1-LR 970702FUGRO- McCLELLAND (SOUTHWEST), INC. �GRO 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Centex Homes Report Date July 2, 1997 PROJECT Vistas of Coppell, Phase 1A & 2B, Coppell, Texas Project No.: 0771 -2024 SAMPLE DATE: June 21, 1997 1 CONTRACTOR: Glenn Thurman, Inc. AGE (days) DATE TESTED TICKET NO.: N/A CONCRETE SUPPLIER: Glenn Thurman AMBIENT TEMP. ( °F): 80 PLANT /TRUCK: N/A CONCRETE TEMP. ( °F): N/A MIX ID NUMBER: N/A TIME BATCHED: N/A AIR ( % ) (ASTM C -231) 5 TIME SAMPLED: 7:54 am WATER ADDED (gal): N/A WEATHER CONDITION: Clear SLUMP (inches) (ASTM c -143) 4 LOCATION OF PLACEMENT: Forest Hill Drive, station 9 +75 Specifications: Making & Curing: ASTM C -31 Testing Methods: ASTM C -143, ASTM C -39 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches CYLINDER NUMBER AGE (days) DATE TESTED TOTAL LOAD (pounds) COMPRESSIVE STRENGTH (PSI) REQUIRED COMPRESSIVE STRENGTH (Psi) VOC 72 7 06/28/97 77000 2724 3000/28 days VOC 73 28 07/19/97 VOC 74 28 07/19/97 VOC 75 Hold Specifications: Making & Curing: ASTM C -31 Testing Methods: ASTM C -143, ASTM C -39 REMARKS: Unit Weight: 147.3 lbs. /cu. ft. Technician: Daniel Myers FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By: SMH /rm Distribution: Centex Homes - Derek Earle Glenn Thurman, Inc. City of Coppell - Garreth CampbelK FUGRO- McCLELLAND (SOUTHWEST), INC. �6R0 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Centex Homes Report Date: July 2 1997 PROJECT Vistas of Coppell, Phase 1A & 26, Coppell, Texas Project No.: 0771 -2024 SAMPLE DATE: June 21, 197 CONTRACTOR: Glenn Thurman, Inc. AGE (days) DATE TESTED TICKET NO.: N/A CONCRETE SUPPLIER: Glenn Thurman AMBIENT TEMP. ( °F): 80 PLANT /TRUCK: N/A CONCRETE TEMP. ( °F): 85 MIX ID NUMBER: N/A TIME BATCHED: N/A AIR ( % ) (ASTM C -231) 5.5 TIME SAMPLED: 8:50 am WATER ADDED (gal): N/A WEATHER CONDITION: Clear SLUMP (inches) (ASTM c -143) 4 LOCATION OF PLACEMENT: Forest Hill Drive, station 12 +25 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches CYLINDER NUMBER AGE (days) DATE TESTED TOTAL LOAD (pounds) COMPRESSIVE STRENGTH (psi) REQUIRED COMPRESSIVE STRENGTH (psi) VOC 76 7 06/28/97 100000 3537 3000/28 days VOC 77 28 07/19/97 VOC 78 28 07/19/97 VOC 79 Hold Specifications: Making & Curing: ASTM C -31 Testing Methods: ASTM C -143, ASTM C -39 REMARKS: Unit Weight: 146.8 lbs. /cu. ft. Technician: Daniel Myers FUGRO- McCLELLAND (SOUTHWEST), INC. Checked B . SMH /rm Distribution: Centex Homes - Derek Earle Glenn Thurman, Inc. City of Coppell - Garreth Campbell FUGRO- McCLELLAND (SOUTHWEST), INC. �GRO 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Centex Homes Report Date: July 2 1997 PROJECT Vistas of Coppell, Phase 1A & 2B, Coppell, Texas Project No .: 0771 -2024 SAMPLE DATE: June 21, 1997 CONTRACTOR: Glenn Thurman, Inc. AGE (days) DATE TESTED TICKET NO.: N/A CONCRETE SUPPLIER: Glenn Thurman AMBIENT TEMP. (°F): 83 PLANT /TRUCK: N/A CONCRETE TEMP. (°F): 85 MIX ID NUMBER: N/A TIME BATCHED: N/A AIR ( % ) (ASTM C -231) 5 TIME SAMPLED: 9:56 am WATER ADDED (gal): N/A WEATHER CONDITION: Fair SLUMP (inches) (ASTM c -143) 4 LOCATION OF PLACEMENT: Forest Hill Drive, station 15 +00 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches CYLINDER NUMBER AGE (days) DATE TESTED TOTAL LOAD (pounds) COMPRESSIVE STRENGTH (Psi) REQUIRED COMPRESSIVE STRENGTH (PSI) VOC 80 7 06/28/97 90000 3184 3000/28 days VOC 81 28 07/19/97 VOC 82 28 07/19/97 VOC 83 Hold Specifications: Making & Curing: ASTM C -31 Testing Methods: ASTM C -143, ASTM C -39 REMARKS: Unit Weight: 146.7 lbs. /cu. ft. Technician: Daniel Myers FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By: SMH /rm Distribution: Centex Homes - Derek Earle Glenn Thurman, Inc. City of Coppell - Garreth Campbell FUGRO- McCLELLAND (SOUTHWEST), INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Centex Homes Report Date: July 2, 1997 PROJECT: Vistas of Coppell, Phase 1A & 28, Coppell, Texas Project No.: 0771 -2024 SAMPLE DATE: June 21, 1997 CONTRACTOR: Glenn Thurman, Inc. AGE (days) DATE TESTED TICKET NO.: N/A CONCRETE SUPPLIER: Glenn Thurman AMBIENT TEMP. (°F): 85 PLANT /TRUCK: N/A CONCRETE TEMP. (°F): 88 MIX ID NUMBER: N/A TIME BATCHED: N/A AIR ( %) (ASTM C -231) 4.8 TIME SAMPLED: N/A WATER ADDED (gal): N/A WEATHER CONDITION: Clear SLUMP (inches) (ASTM C -143) 4 LOCATION OF PLACEMENT: Forest Hill Drive, station 17 +25 Specifications: Making & Curing: ASTM C -31 Testing Methods: ASTM C -143, ASTM C -39 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches CYLINDER NUMBER AGE (days) DATE TESTED TOTAL LOAD (pounds) COMPRESSIVE STRENGTH (psi) REQUIRED COMPRESSIVE STRENGTH (psi) VOC 84 7 06/28/97 80000 2830 3000/28 days VOC 85 28 07/19/97 VOC 86 28 07/19/97 VOC 87 Hold Specifications: Making & Curing: ASTM C -31 Testing Methods: ASTM C -143, ASTM C -39 REMARKS: Unit Weight: 147.0 ft. /cu. ft. Technician: Daniel Myers FUGRO- MCCLELLAND (SOUTHWEST), INC. Checked By: SMH /rm Distribution: Centex Homes - Derek Earle Glenn Thurman, Inc. City of Coppell - Garreth Campbell FUGRO- McCLELLAND (SOUTHWEST), INC. �GRO 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Centex Homes Report Date: July 2, 1997 PROJECT Vistas of Coppell, Phase 1A & 2B, Coppell, Texas Project No .: 0771 -2024 SAMPLE DATE: June 21, 1997 CONTRACTOR: Glenn Thurman, Inc. AGE (days) DATE TESTED TICKET NO.: N/A CONCRETE SUPPLIER: Glenn Thurman AMBIENT TEMP. ( °F): 85 PLANT /TRUCK: N/A CONCRETE TEMP. ( °F): 89 MIX ID NUMBER: N/A TIME BATCHED: N/A AIR ( % ) (ASTM C -231) 5 TIME SAMPLED: 12:20 pm WATER ADDED (gal): N/A WEATHER CONDITION: Clear SLUMP (inches) (ASTM c -143) 4 LOCATION OF PLACEMENT: Forest Hill Drive, station 19 +96 Specifications: Making & Curing: ASTM C -31 Testing Methods: ASTM C -143, ASTM C -39 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS f Standard 6" x 12 ", 28.27 square inches CYLINDER NUMBER AGE (days) DATE TESTED TOTAL LOAD (pounds) COMPRESSIVE STRENGTH (psi) REQUIRED COMPRESSIVE STRENGTH (psi) VOC 88 7 06/28/97 100000 3537 3000/28 days VOC 89 28 07/19/97 VOC 90 28 07/19/97 VOC 91 Hold Specifications: Making & Curing: ASTM C -31 Testing Methods: ASTM C -143, ASTM C -39 REMARKS: Unit Weight: 146.5 lbs. /cu. ft. Technician: Daniel Myers FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By: r ` SMH /rm Distribution: Centex Homes - Derek Earle Glenn Thurman, Inc. City of Coppell - Garreth Campbell