Belt Line Trade-LR070221
REED EnGinEERinG
GEOTECHNICAL AND G R 0 U P
ENVIRONMENTAL CONSULTANTS
CONCRETECY RTESTREPORT
Belt Line de Center Building A
6 E. Belt Line Road
Coppell, Texas
REPORTED TO: IDI
5420 LBJ Freeway, Suite 1275
Dallas, Texas 75240
ATTN: Mr. Chris Parnell
REPORT NO. 185
REG PROJECT NO. 13335
SAMPLE DATE: 01-24-07
TECHNICIAN: J. Ruiz
PAGE: 1 of 1
CONTRACTOR: Raymond Construction
Location of Sam Ie
Set Number Location
1 Sidewalk: 6'S, 260'E from SW bid . corner
Mail
Distribution: (1) IDI/Mr. Chris Parnell
(1) Raymond Constructionl
Mr. David Layne
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
Mix Identification
1261
Date Tested
01-31-07
02-21-07
02-21-07
Hold
Age@
Test
7
28
28
H
Total Load
Ibs.
123830
149680
156830
5430
Air
Entrainment
3.6
Ticket
Number
7174933
Submitted by:
REED ENGINEERING GROUP, LTD.
Original Signed By
Mickey Lawson
Assistant Manager, CMT
MLllnc
f/!~ z ~iff7
2424 STUTZ DR. . SUITE 400 . DALLAS, TX 75235 . TEl [214] 3505600 . FAX [214] 3500019