Loading...
Belt Line Trade-LR070221 REED EnGinEERinG GEOTECHNICAL AND G R 0 U P ENVIRONMENTAL CONSULTANTS CONCRETECY RTESTREPORT Belt Line de Center Building A 6 E. Belt Line Road Coppell, Texas REPORTED TO: IDI 5420 LBJ Freeway, Suite 1275 Dallas, Texas 75240 ATTN: Mr. Chris Parnell REPORT NO. 185 REG PROJECT NO. 13335 SAMPLE DATE: 01-24-07 TECHNICIAN: J. Ruiz PAGE: 1 of 1 CONTRACTOR: Raymond Construction Location of Sam Ie Set Number Location 1 Sidewalk: 6'S, 260'E from SW bid . corner Mail Distribution: (1) IDI/Mr. Chris Parnell (1) Raymond Constructionl Mr. David Layne (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone Mix Identification 1261 Date Tested 01-31-07 02-21-07 02-21-07 Hold Age@ Test 7 28 28 H Total Load Ibs. 123830 149680 156830 5430 Air Entrainment 3.6 Ticket Number 7174933 Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Mickey Lawson Assistant Manager, CMT MLllnc f/!~ z ~iff7 2424 STUTZ DR. . SUITE 400 . DALLAS, TX 75235 . TEl [214] 3505600 . FAX [214] 3500019