Loading...
Belt Line Trade-LR070118 REED EnGinEERinG GEOTECHNICAL AND G R 0 U P ENVIRONMENTAL CONSULTANTS CONCRETECY RTESTREPORT Belt Lin ade Center Building A 56 E. Belt Line Road Coppell, Texas REPORTED TO: IDI 5420 LBJ Freeway, Suite 1275 Dallas, Texas 75240 ATTN: Mr. Chris Parnell REPORT NO. 181 REG PROJECT NO. 13335 SAMPLE DATE: 12-21-06 TECHNICIAN: G. Green PAGE: 1 of 1 CONTRACTOR: Raymond Construction Location of Sam Ie Set Number Location 1 Sidewalk: 10'S, 550'E from SW bid . corner Mail Distribution: (1) IDI/Mr. Chris Parnell (1) Raymond Constructionl Mr. David Layne (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone Mix Identification 1261 ecified Stren 3000 Date Tested 12-28-06 01-18-07 01-18-07 Hold Age@ Test 7 28 28 H Total Load Ibs. 96490 147420 142790 5140 Air Entrainment 3.5 Ticket Number 7174506 Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Mickey Lawson Assistant Manager, CMT MLllnc Z/(f7/~i 2424 STUTZ DR. . SUITE 400 . DALLAS. TX 75235 . TEL [214J 3505600 . fAX [214J 3500019