Vista Point 2R-LR070215
REED EnGinEERinG
GEOTECHNICAL AND G FI 0 U F'
ENVIRONMENTAL CONSULTANTS
CONCRETE CYLINDER TEST REPORT
Vista Point II, Phase II
S.H. 121 at MacArthur Boulevard
Coppell, Texas
REPORTED TO: Bullard Construction, Inc.
P.O. Box 575
Addison, Texas 75001
ATTN: Mr. Keith McMahon
REPORT NO. 99
REG PROJECT NO. 13581
SAMPLE DATE: 02-08-07
TECHNICIAN: C. Johnson
PAGE: 1 of 1
CONTRACTOR: Bullard Construction, Inc.
Age@
Date Tested Test
02-15-07 7
03-08-07 28
03-08-07 28
Hold H
2 639 02-15-07 7
639 03-08-07 28
639 03-08-07 28
639 Hold H
Extranet
Distribution: (1) Jackson Shaw Company/
Mr. Christopher Gardner
(1) AECC, Inc./Mr. Todd Waters
(1) Jackson Shaw Company
Ms. Michelle Graham
location of Sam
Set Number
1
2
Cylinder
ID
638
639
Ie
location
Firelane: 20'S, 200'E from NE corner of Bldg. 6
Firelane: 35'S, 145'E from NE corner of Bid . 6
Mix Identification
23601504
ecified Stren
3600
Total load
Ibs.
122550
121360 4290
Air
Entrainment
3.4
3.6
Ticket
Number
59001717
59001753
Submitted by:
REED ENGINEERING GROUP, LTD.
Original Signed By
Mickey Lawson
Assistant Manager, CMT
ML/lnc
Mail
Distribution: (1) Bullard Construction, Inc./
Mr. Keith McMahon
(1) City of Coppell/Mr, Keith Marvin
I
uu_u ~ ___
I- -
2424 STUTZ DR. . SUITE 400 . DALLAS. TX 75235 . TEL [214] 3505600 . fAX [214] 3500019