Loading...
Vista Point 2R-LR070215 REED EnGinEERinG GEOTECHNICAL AND G FI 0 U F' ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Vista Point II, Phase II S.H. 121 at MacArthur Boulevard Coppell, Texas REPORTED TO: Bullard Construction, Inc. P.O. Box 575 Addison, Texas 75001 ATTN: Mr. Keith McMahon REPORT NO. 99 REG PROJECT NO. 13581 SAMPLE DATE: 02-08-07 TECHNICIAN: C. Johnson PAGE: 1 of 1 CONTRACTOR: Bullard Construction, Inc. Age@ Date Tested Test 02-15-07 7 03-08-07 28 03-08-07 28 Hold H 2 639 02-15-07 7 639 03-08-07 28 639 03-08-07 28 639 Hold H Extranet Distribution: (1) Jackson Shaw Company/ Mr. Christopher Gardner (1) AECC, Inc./Mr. Todd Waters (1) Jackson Shaw Company Ms. Michelle Graham location of Sam Set Number 1 2 Cylinder ID 638 639 Ie location Firelane: 20'S, 200'E from NE corner of Bldg. 6 Firelane: 35'S, 145'E from NE corner of Bid . 6 Mix Identification 23601504 ecified Stren 3600 Total load Ibs. 122550 121360 4290 Air Entrainment 3.4 3.6 Ticket Number 59001717 59001753 Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Mickey Lawson Assistant Manager, CMT ML/lnc Mail Distribution: (1) Bullard Construction, Inc./ Mr. Keith McMahon (1) City of Coppell/Mr, Keith Marvin I uu_u ~ ___ I- - 2424 STUTZ DR. . SUITE 400 . DALLAS. TX 75235 . TEL [214] 3505600 . fAX [214] 3500019