Vista Point 2R-LR070205
REED EnGinEERinG
GEOTECHNICAL AND G R 0 U F'
ENVIRONMENTAL CONSULTANTS
CONCRETE CYLINDER TEST REPORT
Vista Point II, Phase II
S.H. 121 at MacArthur BoJJJevard
~-
Cop ,~~ffias
REPORTED TO: Bullard Constructi
P.O. Box 575
Addison, T as 75001
ATTN: . Keith McMahon
REPORT NO. 94
REG PROJECT NO. 13581
SAMPLE DATE: 01-29-07
TECHNICIAN: R. Hollings
PAGE: 1 of 2
CONTRACTOR: Bulla Construction, Inc.
Location of Sam
Set Number
1
2
3
Ie
location
Paving: 80'S, 45'E from SW corner of Bldg. 5
Paving: 55'N, 60'E from SE corner of Bldg. 4
Pavin : 130'N, 20'E from SE corner of Bid. 4
resented
Desi n Information
Source of Concrete Mix Identification
Redi-Mix 23601504
Age@ Total load
Date Tested Test Ibs.
02-05-07 7 98260
02-26-07 28 143000
02-26-07 28 147220
Hold H
2 345 02-05-07 7 101120 3580
345 02-26-07 28 133780 4730
345 02-26-07 28 129060 4570
345 Hold H
3 346 02-05-07 7 97070 3440
346 02-26-07 28 141090 4990
346 02-26-07 28 129340 4580
346 Hold H
5140
4650
4790
2424 STUTZ DR. . SUITE 400 . DALLAS, TX 75235 . TEL [214] 3505600 . fAX [214J 3500019
REPORT NO. 94
REG PROJECT NO. 13581
SAMPLE DATE: 01-29-07
PAGE: 2 of 2
Submitted by:
Extranet
Distribution: (1) Jackson Shaw Company/
Mr. Christopher Gardner
(1) AECC, Inc./Mr. Todd Waters
(1) Jackson Shaw Company
Ms. Michelle Graham
Air
Entrainment
4.5
4.8
4.6
Ticket
Number
59001083
59001095
59001108
REED ENGINEERING GROUP, L TO.
Original Signed By
Mickey Lawson
Assistant Manager, CMT
MUlnc
Mail
Distribution: (1) Bullard Construction, Inc./
Mr. Keith McMahon
(1) City of Coppell/Mr. Keith Marvin
REED EnGinEERinG
GEOTECHNICAL AND G R 0 U F'
ENVIRONMENTAL CONSULTANTS
REPORTED TO: Bullard Constructi
P.O. Box 575
Addison xas 75001
A TT' r. Keith McMahon
CONCRETE CYLINDER TEST REPORT
Vista Point II, Phase II
S.H. 121 at MacArthur Boulevard
Cappel!
REPORT NO. 94
REG PROJECT NO. 13581
SAMPLE DATE: 01-29-07
TECHNICIAN: R. Hollings
PAGE: 1 of 2
CONTRACTOR:
Location of Sam
Set Number
1
2
3
Ie
location
Paving: 80'S, 45'E from SW corner of Bldg, 5
Paving: 55'N, 60'E from SE corner of Bldg. 4
Pavin : 130'N, 20'E from SE corner of Bid . 4
resented
Desi n Information
Source of Concrete Mix Identification
Redi-Mix 23601504
Age@ Total Load
Date Tested Test Ibs.
02-05-07 7 98260
02-26-07 28
02-26-07 28
Hold H
2 345 02-05-07 7 101120 3580
345 02-26-07 28
345 02-26-07 28
345 Hold H
3 346 02-05-07 7 97070 3440
346 02-26-07 28
346 02-26-07 28
346 Hold H
2424 STUTZ DR. . SUITE 400 . DALLAS. TX 75235 . TEL [214] 3505600 . fAX [214] 3500019
REPORT NO. 94
REG PROJECT NO. 13581
SAMPLE DATE: 01-29-07
PAGE: 2 of 2
Submitted by:
Extranet
Distribution: (1) Jackson Shaw Company/
Mr. Christopher Gardner
(1) AECC, Inc./Mr. Todd Waters
(1) Jackson Shaw Company
Ms. Michelle Graham
Air
Entrainment
4.5
4,8
4.6
Ticket
Number
59001083
59001095
59001108
REED ENGINEERING GROUP, LTD.
Original Signed By
Mickey Lawson
Assistant Manager, CMT
MUlnc
Mail
Distribution: (1) Bullard Construction, Inc./
Mr. Keith McMahon
(1) City of Coppell/Mr. Keith Marvin