Loading...
ST9905DR-LR060303T Construction Materials Testing and Environmental Consulting °Texas CIVg°~, Inc. 10044 Monroe Drive Dallas, Texas 75229 (214) 352-6957 Fax (214) 352.6971 www .texascmt.com REPORT OF CONCRETE MIX OBSERVATION Report Date: MaCCh 3, 2006 Date Concrete Placed: February 2, 2006 clicm City of Coppell Proiecc Bethel Road I Drainage Project Beam Report No.: 3 Phase A (ST 99-05) Contractor: Project Number: 205-0202 Coneretc Supplier and Plant: LMC #3 Location of Placement: Deck - bOX CUIVeCt MATERIALS soUree/ SSD Bath Wta. OBSERVATION DATA Description (Lbs/CuYd) h4i>; Number 1851 Time Sample Batched: 10:51 am Time Sampled: l 1:42 am FIB Ash: Sample Location: 80' E. & 8' N. of S W corner of culvert Coarse Aggregate: Trueklficket No: 975/3208386 Intermediate Aggregate: Temperature: I ine Aeereaate: Ambient Range: 70°F Concrete Range: 72°F ;~dmixutres: Slump Range (inches): 4'/~" 1 Weather Conditions: Clear Time Started: 10: am Added Water: 0 gallons Time Completed: 01:15 pm Unit Weight Sample Air Content (%): 3% Total Cubic Yards Placed: 30 Required Strength (Lbs./sq.in.): 425 @ 4 days; 625 n 28 days Beam Size in. T l L d lus of Ru tore M d SpeGmen Measured Age Date ota oa o u p Remarks Kumber Slump (in.) (Days) Tested De th Width (Lbs.) (Lbs./Sq.In.) BET 9 4 02/06/06 6.10 6.10 6530 520 BET 10 28 03/02/U6 6.10 6.00 7938 640 BET 1 I , 4~z 28 03/02/06 6.00 6.00 8400 700 BET 12 H HOLD Test \4ethods Utilized Fractu7e Regular Beams Made B}': JG .4STV1 C-31,C-78,G 143 (Unless Noted Otherwise) Remarks and/or Distribution: cc: Ms. Suzan C. Taylor -City of Coppell 1 "ferns ('N1T Inc Reviewed by. All levers and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced wuhout the full approval of Texas CMT, Inc. The use of our na a must receive our poor wntten approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. Construction Materials Testing and Environmental Consulting Texas CI~T, Incv 10044 Monroe Drive Dallas, Texas 75229 (214) 352-6957 Fax (214) 352-6972 www .texascmt.com REPORT OF IN-PLACE DENSITY AND MOISTURE OF SOIL n,.~..,.., oo..,,..~.i„ ~ i~nc_mn~~ nnArh.,~l• ecTrn m9~~ Tl'2(11711F9R Paee 1 of 1 Cllent: Clty Of COppell Material Description Maximum Op[imum Dry Moisture Density Content Project: Bethel Rd I Drainage - Phase A (Lbs/C°Ft) Percent Test Date: March 2, 2006 1. Brown Sandy Clay 104.1 17.8 2. Tan Sandy Clay 105.0 18.2 Report Date: March 3, 2006 Required Density (%): Min. 95% Required Moisture (%): Clay: 0 to +5% Mat LocatioNElevation (and/or) Lift In-Place In-Place Percent NO~ Dry Density Moisture Compaction "Cost Ft) (Lb /C Content (%) N° Probe s u Depth 2 Backfill @ south of SE portion of new box culvert @ grade 101 8 19 2 97 0 Station 21+00 . . . 6" Test results project specifications cc: Nis. Suzan C. Taylor -City of Coppell t Dui Icuc~ s and repoiv arc I'nr the esclusivc use of the client io ~~ hnm thc~ un aJJresseJ_ 'Ihc use of our nnme must reaxi~e ism prior wnlicn appnxrel. <hu Icrrvs and n7wns aliph~ unl~~ i~, the sample tcntcrl umVor oMsen'eJ, and are not nwessarity indiceiiev ,.nne y~~;~ ~~~~~~, ~~rarr~ ~„J. iJ.,,~~e:d ~,r.~mdar r",al~er, Construction Materials Testing and Environmental Consulting Tees CM'S, Inco 10044 Monroe Drive Dallas, Texas 75229 (214) 352-6957 Fax (214) 352.6972 www .texascmt.com REPORT OF IN-PLACE DENSITY AND MOISTURE OF SOIL ~,.,_ ~ i~ne n~n~~ >,~r~.t.,.,t. n e•rr`~ T17077 rl'2l117 TI~QQ Paae 1 of 1 .- -- ---- Client: City of Coppell Material Description Maximum Optimum Dry Moisture Density Content Project: Bethel Rd I Drainage - Phase A (l.bs/c~Fq Percent Test Date: March 1, 2006 1. Brown Sandy Clay 104,1 17.8 2. Tan Sandy Clay 105.0 18.2 Report Date: March 3, 2006 Required Density (%): Min. 95% Required Moisture (%): Clay: 0 to +5% Mat LocationlElevation (and/or) Lift In-Place In-Place Percent N0' Dry Density Moisture Compaction Test (Lbs/CuFt) Content (%) No. Probe Depth 1 Backfill @ north of SE portion of new box culvert 100 5 20 9 96 5 2 2' below top of slab . . . 6" Test results project specifications cc: Ms. Suzan C. Taylor - Cit}' of Coppell , onrlcucrs uuJ reryxr,e ore lbrthe escluxicc use of rhedienun sham nc~r lire aJJresscvl. the use ul our name musr receive our prirx wriuen npprmnl. our lacers oral rerynas apph nnlrw Om sample leered m,d/nr ubsenred, and are ma nweswrily uidieaorc „nh. ,I,,.,,~~,~,e. „r„pparemiy idemicai nr.,imaar pnvlmm~ Construction Materials Testing and Environmental Consulting Texas C`T9 Irncv 10044 Monroe Drive Dallas, Texas 75229 (214) 352-6957 Fax (214) 352-6972 www .texasctnt.com REPORT OF IN-PLACE DENSITY AND MOISTURE OF SOIL .~._..:... o,......w,.r,. , i~nc n~mv 1`~orl,.,.l• eCTI\A TI~Q~~ Tl'tf1171~F9R Page 1 of 1 .- - - - -- Client: City of Coppell Material Description Maximum Optimum Dry Moisture Density Content Project: Bethel Rd I Drainage - Phase A (LbsicuFt) Percent Test Date: February 28, 2006 1. Brown Sandy Clay 104.1 17.8 2. Tan Sandy Clay 105.0 18.2 Report Date: March 3, 2006 Required Density (%): Min. 95% Required Moisture (%): Clay: 0 to +5% Mat LocationiElevation (and/or) Lift In-Place In-Place Percent NO' Dry Density Moisture Compaction Test (Lbs/CuFt) Content (%) NO Probe Depth 1 Backfill @ north of SE portion of new box culvert 106 1 18 3 101 9 1 5' below top of slab -Station 21+g0 . . . 6" Test results project specifications cc: Ms. Suzan C. Taylor -City of Coppell ~ ~ ~~~~ ~cucr~ .,..a ~ 7xm, ~~.• e,~ au• ~•.~i~~a~ ~w~ ~~nnr ~e~•„~ ~,~ „n,~~~~ a~~•~ ll,~ ~aa~.•..~a- rho ~.e ~,r~,~~ „n~,~ mua ~~.~ o~~ ~~~n wrnien e~~o~ni. o~ ia~eR ~~a rermw n~,~i~ ~~~n n, m~•.~~„~i, ic,aca N~~~u„~ ~~n.~~,~, a~ e~~ ~„~ ~ekssaar ~na~~m~ ,~nn.• <r~~~na~~, ~~i up~unvt~y fdrmlcu~ ~~~.~~„~w~ r~~u~~~..