Loading...
Stringfellow 1R-CS070307T H E C I T Y O F COFFEL -, L '` ' "" r � o March 7, 2007 x A 8 - David King Nationwide Insurance 549 E Sandy Lake Rd Coppell TX 75019 RE: Stringfellow Addition (Nationwide Insurance) /Lot 1, Block A Final Acceptance Pending Dear Mr. King: Final acceptance for construction of infrastructure for the referenced project remains pending. The items that are incomplete are as follow: 1. Seal joints in drive approach(es) with self - sealing silicone. 2. A follow -up inspection by the Utilities Department should be conducted to clear any punchlist items that may still be outstanding. 3. Provide a maintenance bond from a registered surety for 50% of the contract value of work performed in the public right -of -way and easements for a 2 -year period starting on the date of final acceptance from the City. 4. Provide record drawings of the public improvements from the engineer to be submitted to City of Coppell Engineering Dept. Item number four was sent as a request to your engineer of record, JDJR Engineers & Consultants, on September 22, 2006. We have not yet received this vital set of drawings and would appreciate your help in insuring that we do. If you have any questions, please call me at your earliest convenience. S Rick O'Dell Construction Inspector Office Phone: 972/ 304 -7090 Fax: 972/ 304 -3570 cc: Ken Griffin, P.E., Director of Engineering/Public Works Glenn Hollowell, P.E., Assistant Director of Public Works Greg Jones, Chief Building Official Tim Oates, Fire Marshal Scott Latta, Engineering Technician James Dewey, Jr., P.E., JDJR Engineers & Consultants 255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673