Loading...
Lakewood A-CS 921030' , ~. X51 ~~:Z':K~R HtiORBUS~H a ~~_-_,'~"ES'1COPPOA~4'EC October 30, 1992 Mr. Ken Griffin, P.E. City of Coppell Engineering Department 255 Parkway Boulevard Coppell, Texas 75019 Re: Lakewood Estates Coppell, Texas 91073-0 Dear Ken: We have revised the Final Plat and the Engineering Plans for the referenced addition consistent with the comments in your letter dated October 9, 1992. Please find below an itemized listing of those changes made to the plans as requested by you and your staff: 1. Top of manhole elevations have been provided for all manholes on Sheets 5, 6, and 7. 2. The cross-section detail on the Drainage Area Map (Sheet 8) has been revised as requested. 3. We have evaluated the intersection of Alley E and Hollywood Drive (formerly Tealwood Drive) and feel an alley inlet is not necessary. The runoff discharging from Alley E is 6.7 cfs, which is less than the alley capacity of 8.1 cfs. Additionally, the total runoff in Hollywood Drive north of the sag point inlet (9.1 cfs) is less than the gutter capacity of 9.3 cfs. Since our design as shown meets the City's drainage design guidelines, we feel an additional inlet should not be required. 4. This item concerned the Tract A sewer plans, and does not apply to this submittal. Please note that the realignment of the existing 27" sanitary sewer line now shown on these plans is consistent with the alignments approved by the MUD. 5. This item concerned the Tract A storm sewer plans and do not apply to this submittal. 6. Additional information regarding the pilot channel design has been shown on Sheet 12 as requested. 7. The note on Sheet 13 has been revised as requested by eliminating the option to seed the top of bank. 'o~ _~Ea~h!~~S =eEE;vav SLi"E =OGa ~UI~DREn ~A~LAS TEXAS 7S2a? 21a~634~?300 FAX 2rti•6J4.3338 PAUL S UNI_ICKE R. P.E. DAVID M. SGHNURBUSC H. P.E. KE'/IN RAV KENDRICK, PE. DAVID F. McCULLAH, R. P.L.S. Presiden~ VIC~P President Project Manager • Associate Survey Manager • Associate 8. The outfall of Line D-3 has been moved 10 feet to the east to increase the distance from the pads on Lots 20 and 21, Block D. 9. The notes for positive overflow at all low points have been revised on the FHA Grading Plan sheets as requested. I have enclosed three sets of revised plans for your review. If there are any additional comments regarding this project, please call me at your earliest convenience. I look forward to working with you toward a successful completion of this development. Sincerely, _~ Craig S iley, .E Project Manage Enc. cc; Waymon Levell Keith Jackson, P.E.