Loading...
Gateway BP(3.1)-CS070307T H E C I T Y O F COPPELL T ~- o F x n s 1$ e March 7, 2007 Steve Gosling Constructors & Associates 3333 Welborn Street, Suite 200 Dallas TX 75219 RE: Gateway Business Park, Phase 3/Lots 1 & 2 Block A Dear Mr. Gosling: A pre-construction conference on the referenced project has been scheduled for Friday, March 9, 2007 at 2:00 p.m. in the second floor conference room in Town Center at 255 Parkway Blvd. Please notify the franchised utility companies, contractors, sub-contractors, testing lab and any other interested parties so that they may have a representative present. If you have any questions concerning this project prior to the scheduled meeting, feel free to contact me at (972) 304-3684. Sincerely, Larry Davis, Construction Inspector Office Phone: 972-304-3684 Fax: 972-304-3570 cc: Ken Griffin, P.E., Dir. of Engineering & Public Works Glenn Hollowell, P.E., Asst. Dir. of Public Works Lee Stone, Commercial Building Inspector Tim Oates, Fire Marshal Ric Nelson, Transwestern Commercial Services 255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673 2 RESPONSIBILITY FOR PRE-CONSTRUCTION MEETING NOTIFICATION The owner /owner's representative will be notified of the date, time and place of the pre-construction meeting once it is scheduled by the Construction Inspector assigned to the project. It is the owner /owner representative's responsibility to notify the following parties: • Franchise Utilities (including but not limited to electric, gas, cable, & telephone providers) • Geotechnical firm • Project Engineer • Contractors or subcontractors for excavation, utility, & paving operations • SWPPP representative