Gateway BP(3.1)-CS070307T H E C I T Y O F
COPPELL
T ~- o
F x n s 1$ e
March 7, 2007
Steve Gosling
Constructors & Associates
3333 Welborn Street, Suite 200
Dallas TX 75219
RE: Gateway Business Park, Phase 3/Lots 1 & 2 Block A
Dear Mr. Gosling:
A pre-construction conference on the referenced project has been scheduled for Friday,
March 9, 2007 at 2:00 p.m. in the second floor conference room in Town Center at 255
Parkway Blvd.
Please notify the franchised utility companies, contractors, sub-contractors, testing lab
and any other interested parties so that they may have a representative present. If you
have any questions concerning this project prior to the scheduled meeting, feel free to
contact me at (972) 304-3684.
Sincerely,
Larry Davis, Construction Inspector
Office Phone: 972-304-3684
Fax: 972-304-3570
cc: Ken Griffin, P.E., Dir. of Engineering & Public Works
Glenn Hollowell, P.E., Asst. Dir. of Public Works
Lee Stone, Commercial Building Inspector
Tim Oates, Fire Marshal
Ric Nelson, Transwestern Commercial Services
255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673
2
RESPONSIBILITY FOR PRE-CONSTRUCTION
MEETING NOTIFICATION
The owner /owner's representative will be notified of the date, time and place of
the pre-construction meeting once it is scheduled by the Construction Inspector
assigned to the project.
It is the owner /owner representative's responsibility to notify the following
parties:
• Franchise Utilities (including but not limited to electric, gas, cable, &
telephone providers)
• Geotechnical firm
• Project Engineer
• Contractors or subcontractors for excavation, utility, & paving operations
• SWPPP representative