Loading...
Vista Point 2R-LR070207 REED EnGinEERinG GEOTECHNICAL AND G R 0 U F' ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Vista Point II, Phase II S.H. 121 at MacA / evar en, Texas ~/ ,.....,- REPORTED TO: Bullard COflStrUction, Inc. P.O ox 575 dison, Texas 75001 ATTN: Mr. Keith McMahon REPORT NO. 92 REG PROJECT NO. 13581 SAMPLE DATE: 01-10-07 TECHNICIAN: L. Barnard PAGE: 1 of 2 CONTRACTOR: Bullard Construction, Inc. location of Sam Set Number 1 2 3 4 Ie location Paving: 50'N, 68'W from NW corner of Bldg. 4 Paving: 120'N, 68'W from NW corner of Bldg. 4 Paving: 180'N, 68'W from NW corner of Bldg. 4 Pavin : 230'N, 68'W from NW corner of Bid . 4 Desi n Information Source of Concrete Mix Identification Beall 23601504 Age@ Total load Date Tested Test Ibs. 01-17-07 7 78670 02-07 -07 28 107580 02-07 -07 28 110940 Hold H 2 171 01-17-07 7 79150 2800 171 02-07 -07 28 114740 4060 171 02-07 -07 28 121980 4320 171 Hold H 3 172 01-17 -07 7 92550 3280 172 02-07 -07 28 129930 4600 172 02-07 -07 28 120010 4250 172 Hold H 4 173 01-17-07 7 79660 2820 173 02-07 -07 28 116860 4140 173 02-07 -07 28 119550 4230 173 Hold H 3870 4190 4430 4190 2424 STUTZ DR. . SUITE 400 . DALLAS. TX 75235 . TEL [214] 3505600 . FAX [214] 3500019 REPORT NO. 92 REG PROJECT NO. 13581 SAMPLE DATE: 01-10-07 PAGE: 2 of 2 Time of Concrete Air Ticket Sample Air Temp. Temp. Entrainment Number 9: 1 OAM 49 58 4.3 13678083 10:25AM 51 58 3.9 13678104 12:00PM 60 61 4.2 13678120 1 :25PM 62 60 3.9 13678147 Extranet Distribution: (1) Jackson Shaw Company/ Mr. Christopher Gardner (1) AECC, Inc./Mr. Todd Waters (1) Jackson Shaw Company Ms. Michelle Graham Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Mail Distribution: (1) Bullard Construction, Inc./ Mr. Keith McMahon (1) City of Coppell/Mr. Keith Marvin Mickey Lawson Assistant Manager, CMT ML/lnc