Vista Point 2R-LR070207
REED EnGinEERinG
GEOTECHNICAL AND G R 0 U F'
ENVIRONMENTAL CONSULTANTS
CONCRETE CYLINDER TEST REPORT
Vista Point II, Phase II
S.H. 121 at MacA / evar
en, Texas
~/
,.....,-
REPORTED TO: Bullard COflStrUction, Inc.
P.O ox 575
dison, Texas 75001
ATTN: Mr. Keith McMahon
REPORT NO. 92
REG PROJECT NO. 13581
SAMPLE DATE: 01-10-07
TECHNICIAN: L. Barnard
PAGE: 1 of 2
CONTRACTOR: Bullard Construction, Inc.
location of Sam
Set Number
1
2
3
4
Ie
location
Paving: 50'N, 68'W from NW corner of Bldg. 4
Paving: 120'N, 68'W from NW corner of Bldg. 4
Paving: 180'N, 68'W from NW corner of Bldg. 4
Pavin : 230'N, 68'W from NW corner of Bid . 4
Desi n Information
Source of Concrete Mix Identification
Beall 23601504
Age@ Total load
Date Tested Test Ibs.
01-17-07 7 78670
02-07 -07 28 107580
02-07 -07 28 110940
Hold H
2 171 01-17-07 7 79150 2800
171 02-07 -07 28 114740 4060
171 02-07 -07 28 121980 4320
171 Hold H
3 172 01-17 -07 7 92550 3280
172 02-07 -07 28 129930 4600
172 02-07 -07 28 120010 4250
172 Hold H
4 173 01-17-07 7 79660 2820
173 02-07 -07 28 116860 4140
173 02-07 -07 28 119550 4230
173 Hold H
3870
4190
4430
4190
2424 STUTZ DR. . SUITE 400 . DALLAS. TX 75235 . TEL [214] 3505600 . FAX [214] 3500019
REPORT NO. 92
REG PROJECT NO. 13581
SAMPLE DATE: 01-10-07
PAGE: 2 of 2
Time of Concrete Air Ticket
Sample Air Temp. Temp. Entrainment Number
9: 1 OAM 49 58 4.3 13678083
10:25AM 51 58 3.9 13678104
12:00PM 60 61 4.2 13678120
1 :25PM 62 60 3.9 13678147
Extranet
Distribution: (1) Jackson Shaw Company/
Mr. Christopher Gardner
(1) AECC, Inc./Mr. Todd Waters
(1) Jackson Shaw Company
Ms. Michelle Graham
Submitted by:
REED ENGINEERING GROUP, LTD.
Original Signed By
Mail
Distribution: (1) Bullard Construction, Inc./
Mr. Keith McMahon
(1) City of Coppell/Mr. Keith Marvin
Mickey Lawson
Assistant Manager, CMT
ML/lnc