March 8, 2007
Alen Hinckley
Yorkshire West Realty Advisors, L.P.
12201 Merit Drive Suite 170
Dallas, TX 75251
RE: Replat of Kimbel Addition Lots 8R, 9R, I OR, 12R & 14R (fees for L lOR only)
Fee Assessment Letter
Dear Mr. Hinckley,
Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the
Development Fee calculations for the referenced development.
Please make payment for the Roadway Impact Fees to the City of Coppell in the amount of $15,325.20
and forward to the Engineering Department along with a copy of the Fee Assessment table. This amount
is a portion of the assessed fees that need to be paid prior to filing of the final plat. Please note that the
Water and Sewer Impact Fees are due and payable at the issuance of a Building Permit. Also, please
provide a copy of the Engineer's estimate or contract to our office so the 2% & 4% construction
inspection fee can be verified. The construction inspection fees must be paid prior to scheduling apre-
construction meeting.
The additional fees for water and sewer taps, water meters, and utility inspection fees need to be paid by
separate check at the Public Works Service Center, 816 S. Coppell Road. Meters will be ordered when
those fees are paid.
Appropriate payment of the required fees will help insure a successful beginning of this project. We look
forward to working with you on this project. If you have any questions, please contact me.
Sincerely,
~ ~~
Kenneth M. Griffin, P.E.
Director of Engineering/Public works
cc: Jennifer Miller, Finance Director
Mary Beth Spletzer, Administrative Secretary, Building Inspections
Glenn Hollowell, Assistant Director of Public Works
Greg Jones, Chief Building Official
Brad Reid, Director of Parks and Recreation
255 PARKWAY * P.O.BOX 9478 * COPPE LL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673
1~EVELOPMENT FEE TABLE
Project: Replat of Kimbel Addition Lots SR, 9R, lOR, 12R & 14R (fees for L lOR only)
Date: 3/8/2007
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
FILING
PLAT
Water Impact Fee $4,500.00
(100% due at Issuance of Building Permit)
Water Tap Inspection Fee $100.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $140.78
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $62.74
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $30.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $30.00
(100% due at Issuance of Water Meter)
V4'astewater Impact Fee $2,997.00
(100% due at Issuance of Building Permit)
Wastewater Tap Inspection Fee $50.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $50.00
(100% due at Issuance of Building Permit)
Park Fee $0.00 $0.00
(100% due prior to Filing Plat)
Roadway Impact Fee $15,325.20 $15,325.20
(100% due prior to Filing Plat)
Street Light Fee Information not Avai lable
(100% due prior to Acceptance of Project}
Street Sign Fee Information not Available
(100% due prior to Acceptance of Project)
Construction Inspection Fee Information not Available
(100% due prior to Start of Construction)
TOTAL $23,285.72
TOTAL AMOUNT DUE PRIOR TO FILING FINAL P LAT $ l 5,325.20
Detector Check
info not provided
Detector Check
info not provided
Detector Check
info not provided
Detector Check
info not provided
Detector Check
info not provided
Detector Check
info not provided
Detector Check
info not provided
,-..,
DEvELOPMENT FEE WORKSHEt l
PROJECT: Replat of Kimbel Addition Lots 8R, 9R, lOR, 12R & 14R (fees for L IOR only)
DATE: 3/8/2007
Water Impact Fee:
Domestic Meter(s)
Irrigation Meter(s):
Fireline Meter(s):
1 - 1 1/2 inch
1 - 1 inch
0
0
Total #: 5 ESU's @ $900.00 ea.
(Due prior to issuance of building permit)
Water Tap Inspection Fee:
= 3.33 ESU's
= 1.67 ESU's
= 0 ESU's
= 0 ESU's
Total #: 2 Connections @ $50.00 ea.
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Domestic Water Meter Fee:
Total #: 1 Domestic Meter(s) @ $140.78
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Irrigation/Fireline Water Meter Fee:
Detector Check
info not provided
$4, 500.00
$100.00
$140.78
Total #: 1 Irrigation Meter(s) @ $62.74 $62.74
Total #: 0 Additional Irrigation Meter(s) @ $0.00 $D.00
Total #: 0 Fireline Meter(s) @ $0.00 $0.00
(100% due prior to issuance of water meters)
Domestic Water Meter Deposit Fee:
Total #: 1 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 1 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU's: 3.33
(Due prior to issuance of building permit)
@ $900.00 ea.
Wastewater Tap Inspection Fee:
Total #: 1 Connections @ $50.00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: 1 Lots @ $50.00 ea.
(100% due prior to issuance of building permit)
$30.00
$30.00
$2,997.00
$50.00
$50.00
Page 1
DEVELOPMENT FEE WORKSHEE f
Park Fee (For Residential Developments Only):
* Preliminary plat approved:
0 Single-family @ $0.00 per lot $0.00
b Multi-family @ $0.00 per unit $0.00
(100% paid prior to Council approval of final plat)
Roadway Impact Fee:
(See attached fee calculations) $15,325.20
Street Lighting Fees:
Assessed for lighting in the City's right-of-way. Information not Available
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
Street Sign Fees:
Assessed for signage in the City's right-of-way. Information not Available
(See attached fee calculations if applicable)
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Information not Available
Page 2
ROAD v~AY IMPACT FEE CALCULA i SONS
PROJECT: Replat of Kimbel Addition Lots 8R, 9R, IOR, 12R & 14R (fees for L lOR only)
DATE: 3/8/2007
ROADWAY IMPACT FEE:
Service Area * 1
Category ** Retail/Commercial
Land Use ** Commercial Others Not S ecified
Building Area (sfl 12,900
Development Units ** 12.90
Vehicle Miles er Development Unit ** 7.92
Fee per Vehicle Mile *** $150
Roadway Impact Fee due = (Development Units) x
(Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) _ $15,325.20
* (Figure 4.1 -Roadway Impact Fee Study)
** (Table 4.10 -Roadway Impact Fee Study)
*** (Schedule 2, Page 3 -The Master Fee Schedule)