Loading...
Gateway BP(1.6)-CS070307Mar 08 07 05:30p Debbie Ingram T H E G 1 T ~' O F C~PPELL tt 8 9 R ~ s 1 MEMORANDUM TO: FROM: DATE: REF: 972-462-5199 p.1 Rick O'Dell. Engineering Danny Hightower, Public Works March 8, 2007 Gateway Business Park, Block 2, Lots 3A, 3B, 3C (Freeport Corporate Center) 1. Need pads on valve stacks 2. Need ext. on all valves over 4 feet deep 3. Irrigation not to City specs (meter to DC) 4. Test paperwork on all DC: dom, in, and vaults 5. Paint lids on vaults and meter cans blue 6. North vault needs blocking and cleaned inside 7. Third fire hydrant east of building hit; reset 8. Paint manholes in grass red 9. Vault ai Gateway and Freeport holding water can not inspected. Vault damage -needs repair 10. Need paperwork on two vaults: DC serial # and meter # on DC and location of DC turned in at Service Center 11. Street fire hydrant marker buttons in street need to be painted blue 12. Missing valve on west side of building, main line valve Ca11 972-462-5 1 50 to schedule Danny Hightower to check punch list. -3. 2y R, Ind ~ NTE~F~~cE C3~ ty D C5dlo of con~racfi w~r~uar`~it i es (i s~~ t~. ,~s-tau ~ ~-r ~t..r~r~s Mar 07 07 11:56a Debbie Ingram 972-462-5199 p.1 MEMORANDUM FROM THE DEPARTMENT OF PUBLIC WORKS To: Rick O' Dell Construction Inspector Engineering From: Dennis Lindley, Streets/Traffic Division Public Works Date: March 7, 2007 RE: Walk-thru Gateway Business Park Freeport/SouthvF•estern 1. Rout, clean and seal cracks on drive approaches. 2. Insta4 locking lids on storm inlets. 3. Clean out dirt and debris from storm inlets. 4. Remove zip strip around drain and concrete patch. Clean and seal joint. 5. Clean and seal joints en curbs and on all approaches. n ~ N : sTE~ ~ Lbw rer~JcE ~ `~~~ ` ~ l~U`~~ti ~~~ , C~4C~ ~ ~~ l~ ~~~~-~,: M~rN1NGr% BoNOS ~ofz LCf7LrTt~ ~ ~AY/NG g s- i~U.[ L i ~~P~n1S ~t2on~ ~-~G. ~~ ~~co ~ CITT OF COPPELL Pl/SLlC WORXS DEPARTMENT