DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM: PD-225-R. Coppell Heie:hts Addition. Lots 9B and 9C, zoning change
request from R (Retail) to PD-225-R (Planned Development 225-Retail) to
allow the construction of two retail buildings, totaling 23,646-square-feet and
the reduction in landscaped areas to be provided on 3.1 acres of property
located south and east ofthe intersection of S. Belt Line Road and E. Belt Line
Road, at the request of Richard A. Calvert, Calvert & Co. Architects, Inc.
STAFF REP.: Matt Steer PROJECT ID# PD-07-0012
DRC DATE: February 22,2007 and March 1, 2007
CONTACT: Kenneth M. Griffin, P.E., Dir.of Engineering/Public Works 972/304-3686
COMMENT STATUS: PRELIAIINARY ./FINAL REVISED
liFTER P&Z
Utility Plat
1. The fireline on the south side of Building A should be relocated out of the existing 15' utility
easement.
2. If the fire hydrant on the north side is proposed to be public, then a 20' utility easement
should be provided.
3. The waterline tap in Belt Line Rd. South should be an 8" x 16" tapping valve because the 8"
waterline was abandoned in 2005.
Replat
4. A 20' utility easement should be provided for the fire hydrant on the north side if it is
public.