Loading...
DR8801-CS 890926COPP~. PI~t~ICWORKS TO: FROM: RE: September 26, 1989 Larry Davis, Construction Inspector Howard Pafford, Water Utilities Superintendent Final Walk Thru Punch List for Completion of the Bethel Road Drainage Improvements Project I have assigned field personnel to perform a walk thru on the above reference project. Below you will find a list of the items found to be deficient. Location Description 1. West of Minyards Fireline Vault 10" Gate Valve Could Not Be Located 2. 10" Valve At Point of Connection to 16" Water Line on Bethel Road Valve Stack Cap Needs to be Painted and Mark On Pavement Please make sure that these items are addressed prior to acceptance of this project. If you have any questions regarding this matter, please advise. HLP/bb xc: Steve Gor~m, Director of Public Works Ted Dutt, Water Utilities Crewleader BETHELRD.HLP