Loading...
Coppell Trade 2-LR 070228,.. r ~~yu i. / ~ +~~ m I 1440 Reeder Rd. • Dallas, TX 75229 FAR.CdO COx6LTLTANTB, IxC. Tel. (214) 352-4100 • Fax (214) 352-48 ] 1 CONCRETE COMPRESSIVE STRENGTH REPORT CLIENT: Holt Lunsford Commercial PROJECT: Coppell Trade Center Building D Sample Date: 02/21/07 Project No.: M06-1165 Coppell, Texas i CONCRETE INFORMATION CONTRACTOR: Mc f adden and Mi 11 er TICKET NO.: 42500 AMBIENT TEMP.(°F): 52 CONCRETE TEMP.(°F): 60 TIME BATCHED: 6:40 a.m. TIME SAMPLED: 7:20 a.m. WEATHER CONDITION: Clear LOCATION OF PLACEMENT: paving strip, CONCRETE SUPPLIER: Txz PLANTITRUCK:141 / 841 MIX ID NUMBER: 8205 AIR (%): 4 . 2 (ASTM C 231) WATER ADDED (gal): 0 SLUMP (inches): 5 1/2 (ASTM C 143) 15'S by 15'W from SE building corner CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS ~ DESIGN STRENGTH OF CONCRETE (4000 psi! 28 days ) CYLINDER NUMBER AGE (Days) DATE TESTED TOTAL LOAD (pounds) COMPRESSIVE STRENGTH si Percent of Design Strength (%) 1A 7 2 28 07 101 670 3600 90~ 1B 28 3 21 07 1C 28 3 21 07 1D Hold Cylinders Type: Nominal Cylinder Size 6"X12" (ASTM C 39) Specifications: Making and curing (ASTM C 31) Testing Methods (ASTM C 39) Remarks: Technician: D Dj ikine Distribution: Holt Lansford Commercial - Ken Newman Mcfadden & Miller - Jon Jacobson City of Coppell - Larry Davis FARGO CONSULTANTS, INC. Checked by: Gary Moore .E.T. CMT Manager Geotechnical Engineering ~ Construction Materials Testing ~ Environmental Services www. dallasfargo. com ,. w, ~'~ r r~ \ ~~~ 11440 Reeder Rd. • Dallas, TX 75229 FARGO CONSULTANTS, INC. Tel. (214) 352-4100 • Fax (214) 352-4811 CONCRETE COMPRESSIVE STRENGTH REPORT CLIENT: Holt Lunsford Commercial Sample Date: 02/21/07 PROJECT: Coppell Trade Center Building D Project No.: M06-1165 Coppell, Texas CONCRETE INFORMATION CONTRACTOR: Mc f adden and Miller TICKET NO.: 42516 CONCRETE SUPPLIER: TXI AMBIENT TEMP.(°F): 55 PLANT/TRUCK: 141 / 64 CONCRETE TEMP.(°F): 68 MIX ID NUMBER: 8205 TIME BATCHED: 8 : 06 a.m. AIR (%): 4.1 (ASTM C 231) TIME SAMPLED: 8:50 a.m. WATER ADDED (gal): 0 WEATHER CONDITION: Clear SLUMP (inches): 4 (ASTM C 143) LOCATION OF PLACEMENT: Paving, 15' S by 140' W from SE building corner CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS DESIGN STRENGTH OF CONCRETE (4000 psi/ 28 days ) CYLINDER NUMBER AGE (Days) DATE TESTED TOTAL LOAD (pounds) COMPRESSIVE ~ STRENGTH si Percent of Design Strength (%) 2A 7 2 28 07 103 240 3650 91~ 2B 28 3 21 07 2C 28 3 21 07 2D Hold Cylinders Type: Nominal Cylinder Size 6"X12" (ASTM C 39) Specifications: Making and curing (ASTM C 31) Testing Methods (ASTM C 39) Remarks: Technician: D Dj ikine Distribution: Holt Lansford Commercial - Ken Newman Mcfadden & Miller -Jon Jacobson City of Coppell - Larry Davis FARGO CONSULTANTS, INC. Checked by: Gary Moore .E.T. CMT Manager Geotechnica/ Engineering i Construction Materials Testing i Environmental Services www. dallasfargo. com _..... ,. '~ "~ ~ _ 11440 Reeder Rd. • Dallas, TX 75229 FAR.GO CONSIILTANTS, ixo.- - - Tel. (214) 352-4100 • Fax (214) 352-4811 CONCRETE COMPRESSIVE STRENGTH REPORT CLIENT: Holt Lunsford Commercial Sample Date: 02/21/07 PROJECT: Coppell Trade Center Building D Project No.: M06-1165 Coppell, Texas CONCRETE INFORMATION CONTRACTOR: Mc f adden and Mi 11 e r TICKET NO.: 42546 CONCRETE SUPPLIER: TXI AMBIENT TEMP.(°F): 65 PLANT/TRUCK: 141 / 69 CONCRETE TEMP.(°F): 73 MIX ID NUMBER: 8205 TIME BATCHED: 11:31 a.m. AIR(%): 4.2 (ASTMC231) TIME SAMPLED: 12 :20 p.m. WATER ADDED (gal): 0 WEATHER CONDITION: Clear SLUMP (inches): 5 (ASTM C 743) LOCATION OF PLACEMENT: Paving strip, 15' S by 300' W from SE building corner CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS DESIGN STRENGTH OF CONCRETE (4000 psi/ 28 days ) CYLINDER NUMBER AGE (Days) DATE TESTED TOTAL LOAD i (pounds) COMPRESSIVE STRENGTH si Percent of Design Strength (%) 3A 7 2 28 07 ' 92 320 3270 82~ 3B 28 3 21 07 3C 28 3 21 07 3D Hold Cylinders Type: Nominal Cylinder Size 6"X12" (ASTM C 39) Specifications: Making and curing (ASTM C 31) Testing Methods (ASTM C 39) Remarks: Technician: D Dj ikine Distribution: Holt Lansford Commercial - Ken Newman Mcfadden & Miller - Jon Jacobson City of Coppell - Larry Davis FARGO CONSULTANTS, INC. Checked by: Gary Moor C.E.T. CMT Manager Geotechnical Engineering i Construction Materials Testing i Environmental Services www. da/lasfargo. com ,. -r '~ ~ 11440 Reeder Rd. • Dallas, TX 75229 -_. __ _ _ - FAxco CoxsvzxsrrTS, nvo. Tel. (214) 352-4100 • Fax (214) 352-4811 CONCRETE COMPRESSIVE STRENGTH REPORT CLIENT: Holt Lunsford Commercial Sample Date: 02/21/07 PROJECT: Coppell Trade Center Building D Project No.: M06-1165 Coppell, Texas CONCRETE INFORMATION CONTRACTOR: Mcfadden and Miller TICKET NO.: 42568 CONCRETE SUPPLIER: Txz AMBIENT TEMP.(°F): 70 PLANT/TRUCK: 141 / 802 CONCRETE TEMP.(°F): 75 MIX ID NUMBER: 8205 TIME BATCHED: 1 : 45 p.m. AIR (%): 4.1 (ASTM C 231) TIME SAMPLED: 2 : 30 p.m. WATER ADDED (gal): 0 WEATHER CONDITION: Clear SLUMP (inches): 5 1 /2 (ASTM C 143) LOCATION OF PLACEMENT: Paving strip, 15' S by 100'W from SE building corner CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS DESIGN STRENGTH OF CONCRETE (4000 psi/ 28 days ) CYLINDER NUMBER AGE (Days) DATE TESTED TOTAL LOAD (pounds) COMPRESSIVE STRENGTH si Percent of Design Strength (%) 4A 7 2 28 07 92 320 3270 82~ 4B 28 3 21 07 4C 28 3 21 07 4D Hold Cylinders Type: Nominal Cylinder Size 6"X12" (ASTM C 39) Specifications: Making and curing (ASTM C 31) Testing Methods (ASTM C 39) Remarks: Technician: D Dj ikine Distribution: Holt Lansford Commercial - Ken Newman Mcfadden & Miller - Jon Jacobson City of Coppell - Larry Davis FARGO CONSULTANTS, INC. Checked by: Gary Moo C.E.T. CMT Manager Geotechnical Engineering ~ Construction Materials Testing i Environmental Services www.dallasfargo.com