MEMORANDUM
~ C-- (' r'-r
rr::.' : './-
,,~ -5/ELPE
(J)() yi1V 6~\-_1
jflc.(lGpJrt.A ) _
r )J-f f51 J yYlA1tf
. ,
COPPELL PUBLIC WORKS
.... .'
, :i
March 10. 1989
FROM:
Steve Goram, Director of Public
worL
TO:
Alan Ratliff, City Manager
RE: Traffic Signal @ Sandy Lake & MacArthur
The installation of the temporary traff ic control device at the above
referenced intersection was completed and actuation of the device
took place at 7 :00 a.m. this morning. The Police Department was on
hand to assist in this effort, and for the most part the traffic flowed
smoothly.
11TT(
The signal was installed according to plans and there is a protected
left turn for motorists traveling north or south on MacArthur. However,
there was some concern involving the east/west traffic on Sandy Lake
which is outlined in the attached memorandum. Basically, the design
does not accommodate a protected left turn on Sandy Lake for motorists
traveling east and west. The road is narrow and will not allow for
sufficient pavement to be laid for through traffic.
('~0taff has requested the contractor to provide a ost estimat 0 install
fr'..::!-- split phase actuation which can allow protected e turns on Sandy
Lake and should, staff believes, reduce the backing up of traffic
'~on this road.
I
I
i
I
I
The Police Department believes the intersection has been greatly
improved from a traffic safety perspective and advised that_tb~'y-_will
monitor this intersection next week and provide~report to my o~'
. '-- --
/tSnce the cost estimate is provided staff will meet with Ginn, Inc.
-~~ho provided the design and Russell Doyle our City Engineer.
If you have any questions, please advise.
SGG/sm
cc: Tom Griffin, Police Chief
Russell Doyle, City Engineer
Kevin Pieffer, Ginn Inc.
Wayne Ginn, Ginn Inc.