Loading...
ST8801-CS 8900310 ~ --- . l' MEMORANDUM ~ C-- (' r'-r rr::.' : './- ,,~ -5/ELPE (J)() yi1V 6~\-_1 jflc.(lGpJrt.A ) _ r )J-f f51 J yYlA1tf . , COPPELL PUBLIC WORKS .... .' , :i March 10. 1989 FROM: Steve Goram, Director of Public worL TO: Alan Ratliff, City Manager RE: Traffic Signal @ Sandy Lake & MacArthur The installation of the temporary traff ic control device at the above referenced intersection was completed and actuation of the device took place at 7 :00 a.m. this morning. The Police Department was on hand to assist in this effort, and for the most part the traffic flowed smoothly. 11TT( The signal was installed according to plans and there is a protected left turn for motorists traveling north or south on MacArthur. However, there was some concern involving the east/west traffic on Sandy Lake which is outlined in the attached memorandum. Basically, the design does not accommodate a protected left turn on Sandy Lake for motorists traveling east and west. The road is narrow and will not allow for sufficient pavement to be laid for through traffic. ('~0taff has requested the contractor to provide a ost estimat 0 install fr'..::!-- split phase actuation which can allow protected e turns on Sandy Lake and should, staff believes, reduce the backing up of traffic '~on this road. I I i I I The Police Department believes the intersection has been greatly improved from a traffic safety perspective and advised that_tb~'y-_will monitor this intersection next week and provide~report to my o~' . '-- -- /tSnce the cost estimate is provided staff will meet with Ginn, Inc. -~~ho provided the design and Russell Doyle our City Engineer. If you have any questions, please advise. SGG/sm cc: Tom Griffin, Police Chief Russell Doyle, City Engineer Kevin Pieffer, Ginn Inc. Wayne Ginn, Ginn Inc. '71 t\ 7"-~ , 7'-..... ---.. ,....,) LI/:_~_~::~~:)'/~L ~.~:,' . (=U:_":~ C~.L'/ " 3 - It - B'i