Loading...
Minyards Freeport Xing-CS070226 Page 1 of 1 Paula Crocker - Draft fees for future development of Minyard site From: To: Date: Subject: CC: Ken Griffin Don Chase 2/26/2007 4:45 PM Draft fees for future development of Minyard site Paula Crocker Mr. Chase I attached several PDF's that cover the fees that could be due. I used a 2" domestic meter, a 2" irrigation meter and two 8' fire meters as an assumption. This is fairly typical of developments of this type. If you use a different size of meter or quantity then the fees will change. I also did not include any adjustments on the roadway impact fees. During actual development, adjustments could be made if approved through the Economic Development Board or through other agreements. At this time, I just included what the maximum could be. If you have any other questions, feel free to contact me. If you have questions on any potential abatements or reduction of fees through the Economic Development Board, you can contact Mindy Hurley, Economic Development Coordinator at 972-304-3677 or mhurley@ci.coppell.tx.us. Ken Griffin, P. E. Director ofEngineering/Public Works 972-304-3686 kgriffin@Gi,Gopp~ll.tx,us file://C :\Documents%20and%20Settings\PCROCKER\Local%20Settings\ Temp\GW} 0000... 2/28/2007 DEVELOPMENT FEE TABLE Project: Draft Minyard site (west of existing building) Date: 2/26/2007 TOTAL AMOUNT DUE FEES DUE PRIOR TO FILING PLAT Water Impact Fee $11,844.00 (100% due at Issuance of Building Permit) Water Tap Inspection Fee $200.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $204.34 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $9,286.84 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $30.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $90.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $4,797.00 (100% due at Issuance of Building Permit) Wastewater Tap Inspection Fee $50.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $50.00 (100% due at Issuance of Building Permit) Park Fee $0.00 $0.00 (100% due prior to Filing Plat) Roadway Impact Fee $179,265.00 $179,265.00 (100% due prior to Filing Plat) Street Light Fee Information not Available (100% due prior to Acceptance of Project) II Street Sign Fee Information not Available (100% due prior to Acceptance of Project) II Construction Inspection Fee Information not Available (100% due prior to Start of Construction) TOTAL $205,817.18 TOTAL AMOUNT DUE PRIOR TO FILING FINAL PLAT $179,265.00 DEVELOPMENT FEE WORKSHEET PROJECT: DATE: DI'3f1 Minyard site (west of existing building) 2/2612007 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): 1-2inch 1-2inch o 2-8inch Fireline Meter(s): Total #: 13.16 ESU's @ $900.00 ea. (Due prior to issuance of building permit) 5.33 ESU's 5.33 ESU's o ESU's 2.5 ESU's Water Tap Inspection Fee: Total #: 4 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: 1 Domestic Meter(s) @ $204.34 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Irrigat ionlFireline Water Meter Fee: Total#: 1 Irrigation Meter(s)@ Total#: -----0-- Additional Irrigation Meter(s) @ Total#: ~ Fireline Meter(s)@ (100"10 due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total#: 1 Meter(s)@$3O.00ea. (100% due prior to issuance of water meters) Irrigatio nlFire Meter Deposit Fee: Total #: 3 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) $204.34 $0.00 $4,541.25 Wastewate r Impact Fee: Total Domestic Meters ESU's: 5.33 @ $900.00 ea. (Due prior to issuance of building permit) Wastewate r Tap Inspection Fee: Total#: 1 Connections@$50.00ea. (100"10 due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: ~ Lots @ $50.00 ea. (100% due prior to issuance of building permit) Page 1 $11,844.00 $200.00 $204.34 $204.34 $0.00 $9,082.50 $30.00 $90.00 $4,797.00 $50.00 $50.00 DEVELOPMENT FEE WORKSHEET o o Single-family @ $0.00 per lot Multi-family @ $0.00 per lI1it (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until afterT.U. Bectric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Construction Inspection Fees: A copy of the development contract must be si.bnitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for pUJlic improvements) Page 2 $0.00 $0.00 $179,265.00 Infonnation not Available Infonnation not Available Infonnation not Available ROADWAY IMPACT FEE CALCULATIONS PROJECT: DATE: Draft Minyard site (west of existing building) 2/26/2007 ROADWAY IMPACT FEE: Service Area * 1 Category ** Light Industrial Land Use ** General Light Industrial Building Area (sf) 370,000 Development Units ** 370.00 Vehicle Miles per Development Unit ** 3.23 Fee per Vehicle Mile *** $150 Roadway Impact Fee due = (Development Units) x (Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $179,265.00 * (Figure 4.1 - Roadway Impact Fee Study) ** (Table 4.10 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - The Master Fee Schedule) I . '. ;dMOVNtPtJB:... . '. .... ... . .' .. $l1~;26$..o.P"1