Loading...
DR9301-CN 930315GIBSON & ASSOCIA Engineers and Contractors 11210 Ryliecrest P. 0. Box 800579 Balch Springs, Texas 75180-0579 214/557.1199 FAX 557.1552 March 15, 1993 Mr. Garreth D. Campbell, Sr. The Cite of Coppell P.O. Box 478 Coppell, Texas 75019 TES, INC. 6ENf�,f� � C 10 :..,, Re: Sandy Knoll /Shadowcrest Drainage Improvements Dear Sir: 5 --,, j� i��3 Enclosed are,`tw executed copies of change order #1 on the above referenced 'ect. If there are any questions, please give me a call. Very truly yours, GIBSON & ASSOCIATES, INC. A.J nston Vice President AJJ /md encl: CITY OF COPPELL CHANGE OR EXTRA WORK ORDER PROJECT: Sandy Knoll /Shadowcrest Drainage Improvements CONTRACTOR: Gibson & Associates, Inc. OWNER: City of Coppell CHANGE ORDER NO.: 1 DATE: 3/10/93 CHANGE OR EXTRA WORK TO BE DONE Removal of concrete sidewalk Replacement of 4" concrete sidewalk 750 S.F. @ $1.00 /sf $ 750.00 750 S.F. @ $2.50 /sf $ 1,875.00 Total Cost $ 2,625.00 Previous contract amount $ 87,571.00 Net increase in contract amount $ 2,625.00 Revised contract amount $ 90,196.00 Net increase in contract time of completion 2 days Revised contract time of completion 92 Calendar Days The contractor hereby accepts this Contract adjustment as a final and complete adjustment in full accord and satisfaction of all past and future liability originating under any clause in the Contract by reason of this revision to the Contract. Recommended by the Cite. Engineer: Date: f 1 Ag d to by the Contractor: Accepted by the Owner: i Date: 3 /5 Date: , // � 3 x " tir.;0':x le ac�Nie;' i0[I ; a a -ya ,11:i'iArd ; 3ibSon & r,sSoci ate S— GIBSON & ASSOCIATES, INC. ingineers and Contrectora 11210 Ryllscrest P. 0, Box 800579 Balch Springs, Texas 75180-0578 214/557 -1190 FAX 557 -1552 March 9, 1993 Mr. Garre *_h Campbell The City of Coppell P.O. Box 478 Coppell, Texas 75019 Re: Sandy Knoll /Shadowcrest Drainage Improvements Dear Sir: 414 o ub40;9 We are pleased to quote furnishing the material, labor and equipment necessary to construct the following items of extra work on the above referenced project: 1) Remove Concrete Sidewalk $750.00 750 SF @ $1.00 /sf 2) Replace 4 Concrete Sidewalk 750 SF @ $2.50 /sf 1,875.00 TOTAL: $2,625.00 To accomplish said additional work, we request an additional 2 days be added to our contract. Please issue a change order to accommodate this. if there are any questio. pleases cal, me- very truly yours, GIBSON S ASSOCIATES, INC. A. hnston Vice President AJJ /md