Loading...
ST9401-CN 980715DENTON TAP ROAD City of Coppell Request For Information RFI No. 1 Contractor: Rebcon, Inc. Date: 7 -15 -98 1. On sheet S4, the pier detail shows 16 - #9 Vertical V bars in the columns. On sheet S8, the column and pier schedule st 8 - #10 ertical bars in the columns. Which is Sps correct? 1t 2. On sheet S4, the vertical column steel is shown to extend into the cap until 6 from the op of the cap. On sheet S5, I cannot find the limits of th extension of the vertical pier steel into the abutment cap. Is it 6" from the top also ?t5 g -S S 3. On sheet S3, the Bridge Elevation de ail shows the top of the 36" piers to be at the elevation of 443.75. Is this correct? 1 G 5� �l J- -I_ 21-C)g Reoly Date: Firm: By: