Loading...
ST9401-CS 980627Memo TO: Garreth Campbell Ron Ulys Lane Cr. Robert Bibby n , 06/27/98 Ree Denton Tap Road Attached are the majority of the shop drawings forwarded to us from Rebcon. The attached do not include the contractor's request to consider aitemate bridge deck. This item will require more time to consider than a normal shop drawing submittal. The information attached should also be checked by the City for conformance with your standards which we do not use on a regular basis and may miss something. The items submitted are acceptable to us but may not agree with your standards as per specific manufacturer brand names etc. The sheet pile is acceptable as noted. The contractor will need to coordinate with the City to confirm the color for the elevated water line crossing attached to the bridge. We have accepted the paint which is a semi -gloss type. The literature says special colors can be provided, but we need to make sure the color will match the Coppell standard color. He will need to work out the color with Engineering. Before the pipe line is painted, it might be advisable to paint a small section of the pipe and get Engineering to agree with the color before the whole line is painted. Please call me if you have any comments concems or questions. 0 Page 1