Vista Point 2R-LR070308
REED EnGinEERinG
GEOTECHNICAL AND G R 0 U F'
ENVIRONMENTAL CONSULTANTS
CONCRETE CYLINDER TEST REPORT
Vista Point II, Phase II
S.H. 121 at MacArthur Boulevard
Coppell, Texas
REPORTED TO: Bullard Construction, Inc.
P.O. Box 575
Addison, Texas 75001
ATTN: Mr. Keith McMahon
CONTRACTOR: Bullard Construction, Inc.
Location of Sam
Set Number
1
2
REPORT NO. 99
REG PROJECT NO. 13581
SAMPLE DATE: 02-08-07
TECHNICIAN: C, Johnson
PAGE: 1 of 1
Ie
location
Firelane: 20'S, 200'E from NE corner of Bldg, 6
Firelane: 35'S, 145'E from NE corner of Bid ,6
Desi n Information
Source of Concrete
Redi-Mix
2
Date Tested
02-15-07
03-08-07
03-08-07
Hold
02-15-07
03-08-07
03-08-07
Hold
Mix Identification
23601504
Age@
Test
7
28
28
H
7
28
28
H
Total load
Ibs.
122550
155700
173480
Extranet
Distribution: (1) Jackson Shaw Company/
Mr. Christopher Gardner
(1) AECC, Inc./Mr. Todd Waters
(1) Jackson Shaw Company
Ms. Michelle Graham
5230
121360
161410
171040
4290
5710
6050
5880
Air
Entrainment
3.4
3.6
Ticket
Number
59001717
59001753
Submitted by:
REED ENGINEERING GROUP, LTD.
Original Signed By
Mickey Lawson
Assistant Manager, CMT
MUlnc
Mail
Distribution: (1) Bullard Construction, Inc./
Mr. Keith McMahon
(1) City of Coppell/Mr. Keith Marvin
2424 STUTZ DR. . SUITE 400 . DALLAS, TX 75235 . TEL [214] 3505600 . fAX [214] 3500019