Loading...
Vista Point 2R-LR070308 REED EnGinEERinG GEOTECHNICAL AND G R 0 U F' ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Vista Point II, Phase II S.H. 121 at MacArthur Boulevard Coppell, Texas REPORTED TO: Bullard Construction, Inc. P.O. Box 575 Addison, Texas 75001 ATTN: Mr. Keith McMahon CONTRACTOR: Bullard Construction, Inc. Location of Sam Set Number 1 2 REPORT NO. 99 REG PROJECT NO. 13581 SAMPLE DATE: 02-08-07 TECHNICIAN: C, Johnson PAGE: 1 of 1 Ie location Firelane: 20'S, 200'E from NE corner of Bldg, 6 Firelane: 35'S, 145'E from NE corner of Bid ,6 Desi n Information Source of Concrete Redi-Mix 2 Date Tested 02-15-07 03-08-07 03-08-07 Hold 02-15-07 03-08-07 03-08-07 Hold Mix Identification 23601504 Age@ Test 7 28 28 H 7 28 28 H Total load Ibs. 122550 155700 173480 Extranet Distribution: (1) Jackson Shaw Company/ Mr. Christopher Gardner (1) AECC, Inc./Mr. Todd Waters (1) Jackson Shaw Company Ms. Michelle Graham 5230 121360 161410 171040 4290 5710 6050 5880 Air Entrainment 3.4 3.6 Ticket Number 59001717 59001753 Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Mickey Lawson Assistant Manager, CMT MUlnc Mail Distribution: (1) Bullard Construction, Inc./ Mr. Keith McMahon (1) City of Coppell/Mr. Keith Marvin 2424 STUTZ DR. . SUITE 400 . DALLAS, TX 75235 . TEL [214] 3505600 . fAX [214] 3500019