Loading...
Vista Point 2R-LR070228 REED EnGinEERinG GEOTECHNICAL AND G R 0 U F' ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Vista Point II, Phase II S.H. 121 at MacArthur Boulevard Coppell, Texas REPORTED TO: Bullard Construction, Inc. P.O. Box 575 Addison, Texas 75001 ATTN: Mr. Keith McMahon REPORT NO. 106 REG PROJECT NO. 13581 SAMPLE DATE: 02-21-07 TECHNICIAN: D. Balderas PAGE: 1 of 1 CONTRACTOR: Bullard Construction, Inc. Extra net Distribution: (1) Jackson Shaw Company/ Mr. Christopher Gardner (1) AECC, Inc.lMr. Todd Waters (1) Jackson Shaw Company Ms. Michelle Graham location of Sam Set Number 1 2 Desi n Information Source of Concrete Redi-Mix 2 1069 1069 1069 1069 Ie location Paving: 65'S, 20'E from SW corner of Bldg. 5 Pavin : 25'S, 70'E from SW corner of Bid . 5 Mix Identification 23601504 ecified Stren 3600 Date Tested 02-28-07 03-21-07 03-21-07 Hold Age@ Test 7 28 28 H Total load Ibs. 88040 02-28-07 03-21-07 03-21-07 Hold 7 28 28 H 80450 2850 Air Entrainment 5.4 6.3 Ticket Number 13680413 13680434 Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Mickey Lawson Assistant Manager, CMT MLllnc Mail Distribution: (1) Bullard Construction, Inc./ Mr. Keith McMahon (1) City of Coppell/Mr. Keith Marvin 2424 STUTZ DR. . SUITE 400 . DALLAS, TX 75235 . TEl [214] 3505600 . FAX [214] 3500019