CONCRETE CYLINDER TEST REPORT
Vista Point II, Phase II
S.H. 121 at MacArthur Boulevard
Coppell, Texas
REPORTED TO: Bullard Construction, Inc.
P.O. Box 575
Addison, Texas 75001
ATTN: Mr. Keith McMahon
REPORT NO. 106
REG PROJECT NO. 13581
SAMPLE DATE: 02-21-07
TECHNICIAN: D. Balderas
PAGE: 1 of 1
CONTRACTOR: Bullard Construction, Inc.
Extra net
Distribution: (1) Jackson Shaw Company/
Mr. Christopher Gardner
(1) AECC, Inc.lMr. Todd Waters
(1) Jackson Shaw Company
Ms. Michelle Graham
location of Sam
Set Number
1
2
Desi n Information
Source of Concrete
Redi-Mix
2
1069
1069
1069
1069
Ie
location
Paving: 65'S, 20'E from SW corner of Bldg. 5
Pavin : 25'S, 70'E from SW corner of Bid . 5
Mix Identification
23601504
ecified Stren
3600
Date Tested
02-28-07
03-21-07
03-21-07
Hold
Age@
Test
7
28
28
H
Total load
Ibs.
88040
02-28-07
03-21-07
03-21-07
Hold
7
28
28
H
80450
2850
Air
Entrainment
5.4
6.3
Ticket
Number
13680413
13680434
Submitted by:
REED ENGINEERING GROUP, LTD.
Original Signed By
Mickey Lawson
Assistant Manager, CMT
MLllnc
Mail
Distribution: (1) Bullard Construction, Inc./
Mr. Keith McMahon
(1) City of Coppell/Mr. Keith Marvin
2424 STUTZ DR. . SUITE 400 . DALLAS, TX 75235 . TEl [214] 3505600 . FAX [214] 3500019