Vista Point 2R-LR070226
REED EnGinEERinG
GEOTECHNICAL AND G R 0 U F'
ENVIRONMENTAL CONSULTANTS
CONCRETE CYLINDER TEST REPORT
Vista Point II, Phase II
S.H. 121 at MacArthur Boulevard
Coppell, Texas
REPORTED TO: Bullard Construction, Inc.
P.O. Box 575
Addison, Texas 75001
ATTN: Mr. Keith McMahon
REPORT NO. 105
REG PROJECT NO. 13581
SAMPLE DATE: 02-19-07
TECHNICIAN: S. Davis
PAGE: 1 of 1
CONTRACTOR: Bullard Construction, Inc.
location of Sam
Set Number
1
Mix Identification
23601504
ecified Stren
3600
Date Tested
02-26-07
03-19-07
03-19-07
Hold
Age@
Test
7
28
28
H
Total load
Ibs.
103910
Air
Entrainment
4.6
Ticket
Number
59002463
Extranet
Distribution: (1) Jackson Shaw Company/
Mr. Christopher Gardner
(1) AECC, Inc./Mr. Todd Waters
(1) Jackson Shaw Company
Ms. Michelle Graham
Submitted by:
REED ENGINEERING GROUP, LTD.
Original Signed By
Mail
Distribution: (1) Bullard Construction, Inc./
Mr. Keith McMahon
(1) City of Coppell/Mr. Keith Marvin
Mickey Lawson
Assistant Manager, CMT
ML/lnc
2424 STUTZ DR. . SUITE 400 . DALLAS, TX 75235 . TEL [214] 3505600 . FAX [214] 3500019