Loading...
Vista Point 2R-LR070226 REED EnGinEERinG GEOTECHNICAL AND G R 0 U F' ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Vista Point II, Phase II S.H. 121 at MacArthur Boulevard Coppell, Texas REPORTED TO: Bullard Construction, Inc. P.O. Box 575 Addison, Texas 75001 ATTN: Mr. Keith McMahon REPORT NO. 105 REG PROJECT NO. 13581 SAMPLE DATE: 02-19-07 TECHNICIAN: S. Davis PAGE: 1 of 1 CONTRACTOR: Bullard Construction, Inc. location of Sam Set Number 1 Mix Identification 23601504 ecified Stren 3600 Date Tested 02-26-07 03-19-07 03-19-07 Hold Age@ Test 7 28 28 H Total load Ibs. 103910 Air Entrainment 4.6 Ticket Number 59002463 Extranet Distribution: (1) Jackson Shaw Company/ Mr. Christopher Gardner (1) AECC, Inc./Mr. Todd Waters (1) Jackson Shaw Company Ms. Michelle Graham Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Mail Distribution: (1) Bullard Construction, Inc./ Mr. Keith McMahon (1) City of Coppell/Mr. Keith Marvin Mickey Lawson Assistant Manager, CMT ML/lnc 2424 STUTZ DR. . SUITE 400 . DALLAS, TX 75235 . TEL [214] 3505600 . FAX [214] 3500019