ST9401-CS 980729JUL 29 '98 11 :16AM WIER & ASSOCIATES
1 L
TO:
Garreth Campbell
FROM:
Ulys Lane
DATE:
7 -29 -98
MEMORANDUM
PROJECT: Denton Tap Road; Coppell, Texas
W&A #: 94093
P. 2/7
We prepared the alternate solution moving the alignment further to the west and placing
the storm drain between columns. I know you have not confirmed which option you will
install. In order to get input from parties, if this solution becomes the more favored
option, I have forwarded comments to the contractor. They can provide input to you and
myself.
Please call me if I can assist you in any way.
Copy to: Robert Bibby
Dennis Baily
END OF MEMO
4300 Beltway Place, Suite 130 Arlington, Texas 76010 metro (817) 467 -7700