ST9401-CS 981022WIA,
TO: Garreth Cambell
FROM: Ulys Lane
DATE: 10 -22 -98
MEMORANDUM
PROJECT: Denton Tapp Road; Coppell, Texas
W&A #: 94093
Attached are copies of review shop drawings of the Bridg eck prestressed details.
Please forward copies to Rebcon as soon as possible.
Also attached are four copies of revised plans for the poured in place bridge rail. There
were several dimensions in error which are corrected. The dimensions impact
construction but should not have any bearing on the cost Rebcon is preparing. Please
forward copies to Rebcon.
END OF MEMO
4300 Beltway Place, Suite 130 Arlington, Texas 76010 metro (817) 467 -7700