PRE-CONSTRUCTION ATTENDANCE SHEET
PROJECT: ST 99-OS DR / Bethel Rd Phase A Drainage
DATE: December 1, 2005 TIME: 2:00 p.m.
NAME REPRESENTING PHONE FAX
1. ~4 P~( a ~?Z~3o~~b~ ~ 5Z0
1~
3.~y t r~r•• ~ ~ ~ r~ - 7
` I~~f~CZi S 1 ~
~!~ e. ~t~2.~ 30~- 7oi ~ C3~7~)
z.
7. / ~ti7~ ~ N ~ Z
g. ~~~~s ~ !,~_
9. Cc,
10. ~1~ ~ ~~~~1~
11.
12.
13.
14.
15.
~,~ ~ ~ C~z ~~FN zNc .
_. ,
i~w
C'1 ~ o ~ ~~,~~~ 6T
'y~~/ 8S3 ~ l Z ~
_z<,~
97L -3~y ~ 7 ~ 3 ~S'J
BETHEL ROAD I DRAINAGE
PHASE 'A'
ST 99-OS
Preconstruction Conference Agenda
December 1, 2005 @ 2:00 p.m.
1. Franchised Utilities
2. City of Coppell Guidelines
a) Working hours ~ -j Extra hours ~C ~°~
><. ,'-,, ~'F, S -ice -c ~ _~0 ~ -~
b) Noise ordinance
c) Traffic control
d) Changes to plans or specifications ~ ~S bu<<~ S~~
e) Sanitary facilities
f) All water must be metered
g) Operation of water valves Public Services: Phone No. (972)-462-5150
h) Tree protection John Elias: Phone No. (972)-462-5115
Pry G~. ~ ~ ~ r~ ~~ l.~ e,n ~o
i) Keep set of Construction Standards on site
j) Responsible party on site at all times
k} Periodic meetings as need
3. Contract Time /Liquidated Damages
4. Submittals
a) Responsible person -Name and 24 hour number
b) List of subcontractors with contact person and phone number
c) Monthly estimate form
d) Materials
3' x 3' PVC coated gabions
1' x I' PVC coated gabions
gabion rock
geotextile fabric
crushed stone drainage material
concrete batch design -for each mix
C.(a
Testing
1. Structures
• cast a set of concrete cylinders (4) per each days placement
I need copies of all test results.
Pay Items
- - c~!__ r... _ ~ r,ni~ ~i_ULi~ .~'"- l h !_~i C'J4 ~ ~~u }' i; i I
_ L i
~~
o~
~.
~:
:~
~~
>~
,;a
Z
~~
OLDEN
Cz~g Olden, Inc.
December 1, 2005
PROJECT: Bethel Road fl Drainage -Phase A
City of Coppell, Texas
COINC No.: 06-002
CONTACT LIST
Mr. Vicente Yanez Area Superintendent Mobile: 469/853-6126
Home: 9401484-5195
wanez craigoldeninc.com
Mr. Chris Dixon Construction Operations Manager Office: 972/294-5000x108
Project Manager Mobile: 2141384-7288
l=ax: 9721294-2664
cdixon craigoldeninc.corn
Mr. Everado Espinosa Project Foreman
Nls. Vicki Stephens
Ms. Alicia Sheeder
Accounts Receivable
Payroll
Mobile: 224/232-0936
Home: 972/294-81 q2
Office: 9721294-5000x121
vstephensCa~craigoldeninc.com
Office: 97212 94-5 0 0 Ox 12 0
asi`~~d~r~craigold erYinc.com
P.Q. Box 5000, Llttle EIm.TX 750b8 - 972.29,5000 1.800.422.4667 Fix 972.294.2654 www.oldCninGC01'n
L_ ~ ~ :_. l i_~ f- h: 1 1 I D' I I
Subcontractors:
L_h'.t^~1IJ CL~~~i it~_
Box Culverts - J-N Construction
Jimmy George: 214!878-2779
Utilities -Canary Construction
Wayne Borstad: 2141549-8736
wayne@canaryconstruction.com
Survey- Global Land Surveying, inc.
deter R. Hine: 2141502-2270
phine~a gis-inc.com
,. i H i:, i 'j i L t"~ it C h r, J
F' ilU~~ 'i I