Loading...
ST9905DR-CS051101November 1, 200 Trevor Bray, Vice President Craig Olden, Inc. P.O. Box 5000 Little Elm, TX 75068 RE: Bethel Road I Drainage Project Phase'A' (from Freeport to south of Bethel Rd.) Project # ST 99-OS DR Dear 1/'1r. Bray: At the October 25, 2005 City Council meeting, the referenced project was awarded to your firm. Enclosed with this letter are three original contract documents. Please execute the three originals; provide the required bonds and return tv,~o of the executed documents to the Engineering Department. One of the executed documents is for your file. To schedule a preconstruction conference please contact Suzan Taylor, Project Coordinator, at 972; 304-3679. Garreth Campbell will be the Construction Inspector on this project. He can be reached at the same number. Sincerely, ~~ T~- Kenneth M. Griffin, P.E. Director of Engineerin~> ublic ~'~'orks Office 972/304-3686 Fax 972/304-7041 ec: Garreth Campbell, Construction Inspector GOPPEL~ YEARS IN -~ * ~_ X955-1005 2`5 S PA R 1: V~'AY '6 P_ O. B O X 9 ~ 78 ~ C C~ FP E LL T X 7501 9 * 'fE L 972:4 E2 0022 * FAT 972/30 4 3673