ST9905DR-LR060202T
Construction Materials Testing
and Environmental Consulting
°Iexas CI~'~°, Imcv
10044 Monroe Drive Dallas, Texas 75229 (214) 352-6957 Fax (214) 352-6972 www .texascmt.com
REPORT OF CONCRETE MIX OBSERVATION
Report Date: February 2, 2006 Date Concrete Placed: January 3, 2005 Standard 6"x12"
Client: City of Coppell Area 28.27 Square Inches
Project Bethel Road I Drainage Project Concrete Report No.: 7
Phase A (ST 99-OS)
Contractor: In Construction Project No.: 205-0202
Concrete Supplier and Plant: LMC 6
Location of Placement: Culvert Wa11S
MATERIALS source/ ssD Bath Wta. OBSERVATION DATA
Description (Lbs/CuYd)
Mix Number:
Cament:
P1~- Ash:
Coarse Aggregate:
Intermediate Aggregate
Fine Aggregate:
Admixtures:
2
Added Water:
1701 Time Sample Batched: 12:53 pm
Time Sampled: 01:41 pm
Sample Location: 220' S. & 15' E. of SE corner of Bethel &
Freeport
Truck/Ticket No: 9 8 0/626 7 8 5 8
Temperature:
Ambient Range: 75°F
Concrete Range: 76°F
Slump Range (inches): 4'/~"
Weather Conditions: Clear
Time Started: ]2:30 pm
0 gallons Time Completed: 03:00 pm
Sample Air Content (%): 5%
Total Cubic Yazds Placed: 10
Remtired Strenoth fl.hs./sa_ial' 3600
Specimen
Vumber Measured
Slum (in. Age
(Dais Dale
Tested Total Load
tbs. Compressive Strength
(Lbs./Sq.ln.l Remarks
~_
BET 25 7 01/10/06 83,920 2,970
BET 26 28 01/31/06 90,180 3,190
BET 27 4/2 28 01/31/06 99,280 3,510
BET 28 H HOLD
Test Methods Utilized Fracture Regular
Cylinders Made By: JG
ASTM C-31,C-39,C-143 Unless Noted Otherwise
Remarks and/or Distribution:
cc: Ms. Suzan C. Taylor -City of Coppell
Texas CM'I', Znc. Reviewed by: \J
AI I lotmrs and reports arc for [he exclusive use of the client to whom they are addresst~ and shall not be reproduced wiilaut the full approval of Tcx~xas CMTs, Inc. The use o our namr: must recorve our prior written approval. Our letters and relwns apph
only a the sample tested and/or observud and arc tat necessarily indicative of the quantities of apparently identical or similar products.
C
~C~X~S ~~~ ~~~~
T
Construction Materials Testing
and Environmental Consulting
10044 Monroe Drive Dallas, Texas 75229 (214) 352-695? Fax (214) 352-6972 www .texascmt.com
REPORT OF CONCRETE MIX OBSERVATION
Report Date: February 2, 2006 Date Concrete Placed: January 25, 2005 Standard 6"x12"
Client City of Coppel l ~ n.~ Area 28.27 Square Inches
Prq~ect: Bethel Road I Drainage Project \ J 5~ Qz Concrete Report No.: 13
Phase A (ST 99-OS) Y~ ~v""
Contractor: JN Construction Project No.: 205-0202
Concrete Supplier and Plant: LMC 3
Location of Placement: Wa~~
MATERIALS s°urce~ SSDBatohwts. OBSERVATION DATA
Description (LbsrCuYd)
Mix Number: 1701 Time Sample Batched: 01:28 pm
Cement: Time Sampled: 02:13 pm
FIv Ash: Sample Location: 50' E. of existing box culvert under Freeport Pkwy.
- 3 wall from south
Coarse Aggregate: Truckll'icket No: 1049/3207969
Intermediate Aggregate: Temperature:
Fine Aggregate: Ambient Range: 64°F
Admixtures: Concrete Range: 61°F
Slump Range (inches): 4"
1 Weather Conditions: Partly Cloudy
2 Time Started: 01:00 pm
Added Water: 5 gallons Time Completed: 03:45 pm
Sample Air Content (%): 4%
Total Cubic Yazds Placed: 10
Required StrenLrth (LbsJsa.in.l: 3600
Specimen
Number Measured
Slum in. Age
Da s Date
Tested Total Load
(Lbs. Compressive Strength
Lbs /S In. Remarks
BET 49 7 02/01 /06 121,860 4,310
BET 50 28 02/22/06
BET 51 4„ 28 02/22/06
BET 52 H HOLD
Test Methods Utilized Fracture Regular
Cylinders Made By: MR
ASTM C-31,C-39,C-143 (Unless Noted Otherwise
Remarks and/or Distribution:
cc: Ms. Suzan C. Taylor -City of Coppel(
Texas CMT Inc. Reviewed by: ~ ~) ` _
All letters and roports are for the czclusivc use of tlu client [o whom they arc addressed and shall not be reproduced without the full approval of Texas CMTs, Inc. The use of our name must nxeivc our prior urit[cn approval. Our Ictu;rs and reports apply
only to thx: sample test d ardor observed and are not necessarily indicative of the quantities of apparently identical or similar products.
~C°~X~S ~~1[~9 ~.~~v
T
Construction Materials Testing
and Environmental Consulting
10044 Monroe Drive Dallas, Texas 75229 (214) 352.6957 Fax (214) 352-6972 www .texascmt.com
REPORT OF CONCRETE MIX OBSERVATION
Report Date: February 2, 2006 Date Concrete Placed: January 24, 2005 ,I ~ Standard 6"x12"
Client: Cl>)' Of COppell ~~V Area 28.27 Sanare Inches
Prq~ect: Bethel Road I Drainage Project ~~ Lf 9 Concrete ReportNo.: 12
Phase A (ST 99-OS) _J"
Contractor: .Ilv COriStrUCtlOri V Project No.: 205-0202
Concrete Supplier and Plant: LMC 3
Location of Placement: Wall
MATERIALS Sonrce/ ssDaatchwts OBSERVATION DATA
Description (Lbs/CuYd)
Mix Number: 1701 Time Sample-Batched: 01:24 pm
Cement Time Sampled: 02:15 pm
Sample Location: I S' E. of existing box culvert under Freeport Pk~tiy.
Ply Ash: ~
2" wall from south
Coarse Aggregate: Truck/Ticket No: 1049/3207885
Intermediate Aggregate: Temperature:
Fine Aggregate: Ambient Range: 67°F
Admixtures: Concrete Range: 66°F
Slump Range (inches): 5 h"
I Weather Conditions: Clear
2 Time Started: 01:00 pm
Added Water: 0 gallons Time Completed: 04:00 pm
Sample Air Content (%): 5%
Total Cubic Yards Placed: 20
Required Streneth (Lbs./sa.in.): 3600
Specimen
Number Measured
Slum lin. Age
Da s Date
Tested Total Load
Lbs. Compressive Strength
Lbs./S .ln. Remarks
BET 45 7 01/31/06 97,800 3,460
BET 46 28 02/21/06
BET 47 5,/2„ 28 02/21/06
BET 48 H HOLD
Test Methods Utilized Fracture Regular
Cylinders Made By: MR
.4STM C-31,C-3QC-143 Unless Noted Otherwise
Remarks and/or Distribution:
cc: Ms. Suzan C. Taylor -City of Coppell
Texas CMT, Inc. Reviewed
All Ieta:rs and reports arc for [he exclusive use of [he client to whom th 7 are addressed and shall not be repraduccd without the full approval of Texas CMTs, [rte. The use of dLr name must nxcive our prior written approval. Our letters and reports appF
only [o the sample tested and~or observed and are not necessarily indicative of the quantities of apparently identical or similar products.
T
Construction Materials Testing
and Environmental Consulting
P][~exas CT, Inc.
10044 Monroe Drive Dallas, Texas 75229 (214) 352-6957 Fax (214) 352.6972 www .texascmt.com
REPORT OF CONCRETE MIX OBSERVATION
Report Date: February 2, 2006 Date Concrete Placed: January 26, 2005 Standard 6"x12"
Client t'ity of t:Oppe~l Area 2&.27 Square Inches
I'ro~ect Bethel Road I Drainage Project Concrete Report No.: 14
Phase A (ST 99-OS)
Contractor JN Construction Project No.: 205-0202
Concrete Supplier and Plant LMC ~
Location of Placement Wald
MATERIALS sourc°~ SSD Batch Wt5 OBSERVATION DATA
Description (Lbs/CuYd)
Mix Number 1701 Time Sample Batched: 02:07 pm
Cement Time Sampled: 02:40 pm
Sample Location: 65' E. of SE corner of existing box culvert under
I Iv Ash:
- Freeport PkNry. - 1' vertical wall from south
Coarse Aggregate: TrueklTicket No: 5016/7160657
Intcnncdiate Aggregate: Temperature:
Fine Aggregate: Ambient Range: 62°F
Concrete Range: 55°F
Admixtures: Slump Range (inches): 5"
1 Weather Conditions: Cloudy
2 Time Started: 01:00 pm
Added Water 5 gallons Time Completed: 04:15 pm
Sample Air Content (%): 4%
Total Cubic Yazds Placed: 7
Remtired Strength (Lhs /sa.in.l: 3600
Specimen
Vumber Measured
Slum in Age
C)a s) Date
Tested Total Load
(Lbs. Compressive Strength
(Lbs.iS In. Remarks
BET 53 7 02/02/06 80,160 2,840
BET 54 28 02/23/06
BET 55 5„ 28 02/23/06
BET 56 H HOLD
Test M11ethods Utilized Fracture Regular
Cylinders Made By: MR
ASTM C-31,C-39,C-743 Unless Noted Otherwise
Remarks and/or Distribution:
cc: Ms. Suzan C. Taylor -City of Coppell
Texas CMT, Inc. Reviewed by: _
:\II tar: rs anJ rcpats are for the esclusivc ux of [he client [o whom they arc addressed and shall not be reproduced without the full approval of Texas CMTs, Inc. The use of our mm~e must receive our prior wri[u;n approval. Our letters and rayons appb
only [o the sample ustrd and/or obsencd and arc not necessarily irdicadve of the quantities of apparently identical or shnilar products.
T
Construction Materials Testing
and Environmental Consulting
~~~~5 ~S.i 1, Incs
10044 Monroe Drive Dallas, Texas 75229 (214) 352-6957 Fax (214) 352-6972 www .texascmt.com
REPORT OF CONCRETE MIX OBSERVATION
Report Date: February 2, 2006 Date Concrete Placed: January 27, 2005 Standard 6"x l2"
Client City of Ccppell Area 28.27 Square Inches
Project: Bethel Road I Drainage Project Concrete Report No.: l 5
Phase A (ST 99-OS)
Contractor: JN C0113IrUCt1017 ProjectNo.: 205-0202
Concrete Supplier and Plan t LMC 3
Location of Placement BOX Culvert - bO1t0177 half
MATERIALS s°urce! SSDBatchWts. OBSERVATION DATA
Description (Lbs/CuYd)
Mix Number. 1701 Time Sample Batched: 1 L~7 am
Cement Time Sampled: 12:45 pm
Sample Location: ~0' E. trom SW corner ofculvert -bottom half
Ply Ash
- Truck/Ticket No: 5022/3208122
Coarse A~_~regate: Temperature:
lnicnnediate Aggregate: Ambient Range: ~5°F
Fine Aggregate: Concrete Range: 60°F
'
Slump Range (inches): 5
h
Admixtures: Weather Conditions: Cloudy
I Time Started: 11:30 am
2 Time Completed: 02:00 pm
Added ~~t'ater: 0 gallons Sample Air Content (%): 4.5°/n
Total Cubic Yards Placed: 7
Renuired Streneth (t,hs./sa.in.l: 3600
Specimen
Number Measured
Slum (in. Age
(Days) Date
Tested Total Load
Lbs. Compressive Strength
Lbs./S In. Remarks
BET 57 1 5 02/01/06 127,52) 4,510
BET 58 28 02/24/06
S,h„
BET 59 28 02/24/06
BET 60 H HOLD
Test Methods Utilized Fracture Regular
Cylinders Made By: MR
ASTS1 C-31,C-39,C-143 (Unless Noted Otherwise
Remarks and/or Distribution:
~c: Ms. Suzan C. Taylor -City of Coppell
L
Texas CMT, Inc. Reviewed by: ~J ~
:\II leucrs and reports arc for the csclusivc use of the client to whom they are addressed and shall no[ be reproduced without the full approval of Texas CMTs, Inc. The use of our name must receive cur prior written approval. Our letters and reports apply
onh~ to the sample tested and/or observrd and are nol cecessanly indicative of tlu quantities of appan;ndy identical or similar pr°ducts.