Loading...
Coppell Cross 1P-LR 980522ALPHA TESTING, INC. 2209 Wisconsin St. ~~~, Suite 100 Dallas, Texas 75229 (214) 620-8911 TESTED FOR: MAVEX COPPELL CROSSING, LTD. LEWISVILLE, TEXAS PROJECT: COPPELL CROSSING COPPELL, TEXAS REPORT OF CONCRETE COMPRESSION TEST DATE OF ISSUE OUR REPORT NO. MAY 22, 1998 97332-13 FIELD DATA LOCATION OF CONCRETE PLACEMENT SLAB % lO' NORTH & 10' WE5T OF SE CORNER OF SLAB '~ B'r DATE PLACED 0 5/ 22 / 9 8 PLANT 3 TIME O4 % 20 DELIVER TICKET NO 63417 SLUMP {ASTM C-143) 5 MIX PROPORTIONS {SSD) N/A AIR CONTENT (ASTM C-231 ^ OR C-173 ^) N/A CEMENT N/A AIR TEMPERATURE 7 0 WATER N/A CONCRETE TEMPERATURE 7 9 FINE AGGREGATE N/A DATE RECEIVED O5 / 2 3 / 9 8 COARSE AGGREGATE N/A FIELD DATA SUBMITTED BY ARMANDO ADMIXTURE N/A MIX DATA SUBMITTED BY LATTIMORE SPECIMENS CAPPED IN ACCORDANCE WITH ASTM C-617~C-1231 ^ COMPRESSION TEST RESULTS (NOMINAL CYLINDER SIZE 6" X 12") (ASTM C-39) ~ LAB NO. TYPE CURING DATE TESTED AGE DAYS TOTAL LOAD AREA COMPRESSIVE STRENGTH, PSI 29 LAB 05/29/98 7 83,005 28.27 2,940 30 LAS 06/19/98 28 28.27 31 LAB 06!19/98 28 28.27 32 I LAB HOLD H 28.27 Specifications 2 8 3, 0 0 0 COMPUDATA-CC,01 f1R3-~a REMARKS i~[;yunders made by ALPHA representative. ^ Cylinders made by Architect's or Contractor's representative. finders picked up by ALPHA la oratory. ^ Cylinders delivered to ALPHA laboratory. ^ Compressions test results comply with applicable specifications. ^ Compression test results do not comply with applicable specifications. Respectfully Submitted ALPHA TESTING, INC. PAT STETTNER ALPHA TESTING, INC. 2209 Wisconsin St. ~~~ Suite 100 Dallas, Texas 75229 (214) 620-8911 TESTED FOR: MAVEX COPPELL CROSSING, LTD. LEWISVILLE, TEXAS PROJECT: COPPELL CROSSING COPPELL, TEXAS REPORT OF CONCRETE COMPRESSION TEST DATE OF ISSUE OUR REPORT NO. MAY 22, 1998 97332-i3 FIELD DATA LOCATION OF CONCRETE PLACEMENT SLAB ~ 1 O' NORTH & SLAB "$•' DATE PLACED Q ~ / 2 2 / 9 $ TIME Q4 ; 2Q SLUMP (ASTM C-143) 5 AIR CONTENT (ASTM C-231 ^ OR C-173 ^) j1T/A AIR TEMPERATURE 7 O CONCRETE TEMPERATURE 7 9 DATE RECEIVED 05/23/9$ FIELD DATA SUBMITTED BY j~~ppjp0 MIX DATA SUBMITTED BY j,,ATTIj+~OR); SPECIMENS CAPPED IN ACCORDANCE WITH ASTM C-617 R C-1231 ^ 10' WEST OF SE CORNER OF PLANT ~ DELIVER TICKET NO 6 3417 MIX PROPORTIONS (SSD) N/A CEMENT N/A WATER jq/p, FINE AGGREGATE N/A COARSE AGGREGATE N/A ADMIXTURE rj/A, COMPRESSION TEST RESULTS {NOMINAL CYLINDER SIZE 6" X 12") (ASTM C-39) LAB NO~ TYPE CURING DATE TESTED AGE DAYS TOTAL I AREA LOAD ~, COMPRESSIVE STRENGTH, PSI 29i i LAB 05/29/98 7 83,005 28.27 2,940 30 LAB 06/19/98 28 131,099 28.27 4,640 31 LAB 06/19/98 28 124,682 28.27 4,410 32 LAB HOLD H ~ 28.27 i Specificatio ns 2$ 3, 0 0 0 COMPUDATA-CGO~Ofl3-34 REMARKS ylinders made by ALPHA representative. ^ Cylinders made by Architect's or Contractor's representative. ~y nders picked up by ALPHA laboratory. ^ C tinders delivered to ALPHA la ratory. Compressions test results comply with applicable specifications. Compression test results do not comply with applicable specifications. Respectfully Submitted ALPHA TESTING, INC. ~~T~ ST~ET~E~ /~ ALPHA TESTING, INC. TESTED FOR: MAVEX COPPELL CROSSING, LTD. LEWISVILLE, TEXA5 2209 Wisconsin St. ~~~ Suite 100 Dallas, Texas 75229 (214) 620-8911 PROJECT: COPPELL CROSSING COPPELL, TEXAS REPORT OF CONCRETE COMPRESSION TEST DATE OF ISSUE OUR REPORT NO. FIELD DATA LOCATION OF CONCRETE PLACEMENT SLAB : ~O' NORTH & SLAB ~• B" DATE PLACED OS/22198 TIME 06 : ~{) SLUMP (ASTM C-143) 5 AIR CONTENT (ASTM C-231 ^ OR C-173 ^) N/A AIR TEMPERATURE 7 0 CONCRETE TEMPERATURE 8 2 DATE RECEIVED 05/23!98 FIELD DATA SUBMITTED BY ARMANDO MIX DATA SUBMITTED BY LATTIMORE/ SPECIMENS CAPPED IN ACCORDANCE WITH ASTM C-617 R C-1231 ^ MAY 22, 1998 97332-14 30` EAST OF SW CORNER OF PLANT 3 DELIVER TICKET NO 6 34 2 9 MIX PROPORTIONS (SSD) N/A CEMENT NIA WATER N/A FINE AGGREGATE N/A COARSE AGGREGATE N/A ADMIXTURE N/A COMPRESSION TEST RESULTS (NOMINAL CYLINDER SIZE 6" X 12") (ASTM C-3°) LAB NO. TYPE CURING DATE TESTED AGE DAYS TOTAL LOAD AREA COMPRESSIVE STRENGTH, PSI 33 LAB 05/29/98 7 78,219 28.27 2,770 34 LAB 06/19/98 28 28.27 35 LAB 06/19/98 28 28.27 i 36 LAB HOLD H 28.27 Specifications 2 8 3, 0 0 0 REMARKS ylinders made by ALPHA representative. ^ Cylinders made by Architect's or Contractor's representative. .^ inders picked up by ALPHA la oratory. ^ Cylinders delivered to ALPHA laboratory. ^ Compressions test results comply with applicable specifications. D Compression test results do not comply with applicable specifications. Respectfully Submitted ALPHA TESTING, INC. PAT STETTNER r~n~~o~ mnTnrr_n~nao on ALPHA TESTING, INC. TESTED FOR: MAVEX COPPELL CROSSING, LTD . LEWISVILLE, TEXAS 2209 Wisconsin St. ~~~ Suite 100 Dallas, Texas 75229 (214) 620-8911 PROJECT: COPPELL CROSSING COPPELL, TEXAS REPORT OF CONCRETE COMPRESSION TEST DATE OF ISSUE OUR REPORT NO.: MAY 22, 1998 97332-14 FIELD DATA LOCATION OF CONCRETE PLACEMENT SLAB : 3O' NORTH & SLAB "B" DATE PLACED 05/22/98 TIME 06 ; QQ SLUMP (ASTM C-143) rj AIR CONTENT (ASTM C-231 ^ OR C-173 ^) N/A AIR TEMPERATURE 7 0 CONCRETE TEMPERATURE $2 DATE RECEIVED 0 5/ 2 3/ 9 8 FIELD DATA SUBMITTED BY ARMANDO MIX DATA SUBMITTED BY LATTIMORF/ SPECIMENS CAPPED IN ACCORDANCE WITH ASTM C-617 ~ R C-1231 ^ 30' EAST OF SW CORNER OF PLANT 3 DELIVER TICKET NO fj 34 2 9 MIX PROPORTIONS (SSD) N!A CEMENT N/A WATER N/A FINE AGGREGATE N/A COARSE AGGREGATE NIA ADMIXTURE N/p~ COMPRESSION TEST RESULTS (NOMINAL CYLINDER SIZE 6" X 12") (ASTM C-39} LAB NO. TYPE CURING DATE TESTED AGE DAYS TOTAL LOAD AREA COMPRESSIVE STRENGTH, PSI 33 LAB 05/29/98 7 78,219 28.27 2,770 ~' 34 LAB 06/19/98 28 116,560 28.27 4,120 35 LAB 06/19/98 28 102,209 28.27 3,620 36 LAB - HOLD H i 28.27 Specifications 2$ - 3, 0 0 0 COM PU DATA-CG01083-34 REMARKS ylinders made by ALPHA representative. ^ Cylinders made by Architect's or Contractor's representative. Cylinders picked up by ALPHA laboratory. ^ C tin rs delivered to ALPHA la atory. Compressions test results comply with applicable specifications. ^ Compression test results do not comply with applicable specifications. Respectfully Submitted ALPHA TESTING, INC. AT STETTNJ,E