Loading...
DR8801-CS 890711DeShazo, Starek & Ta, ~nc. Engineers * Planners Un]on Station · Dallas, Texas 75202 · 214/748-6740 TO: FROM: DATE: SUBJECT: MEMORANDUM Russell Doyle City Engineer City of Coppell, Texas David E. Lucado July 11, 1989 Bethel Road Drainage Improvements Postal Site to Freeport Parkway Construction Status 88157.04 As you requested, the following status report for the referenced project has been prepared. Field Survey On July 5, 1989, our surveyors made a cursory field survey of the Project to compare the actual construction with the requirements of the plans. A copy of the results of the survey is attached. Horizontal accuracy varies from 0.43 ft. at P.I. Station 16+15.8 to 0.02 feet at Station 20+05. Vertical accuracy varies from 0.16 feet above grade at Station 15+36.7 to 0.27 feet above grade at Station 20+05. The horizontal tolerances appear to be within acceptable limits and well within the available easement. The vertical tolerances also appear to be acceptable. The flow lines in the upstream section were constructed slightly higher than proposed in order to tie in to the existing concrete apron. 2. Construction Progress According to our measurements, construction has progressed as follows (construction is proceeding upstream) on July 5. Culvert Component Upstream Station Bottom Slab 20 + 05 Walls 20 + 05 Top Slab 16 + 95 Mr. Russell Doyle July 11, 1989 Page 2 After you have an opportunity to review this report, please notify me of any exceptions or corrections. cc: Larry Davis JUL 14